L-MT-05-033, March 2005 Monthly Operating Report for Monticello Nuclear Generating Plant

From kanterella
Revision as of 05:38, 23 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
March 2005 Monthly Operating Report for Monticello Nuclear Generating Plant
ML051010202
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/08/2005
From: Thomas J. Palmisano
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-05-033
Download: ML051010202 (4)


Text

Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC April 8, 2005 L-MT-05-033 Technical Specification 6.7.A.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Monticello Monthly Operating Report In accordance with Technical Specification 6.7.A.3, attached is the Monthly Operating Report for March 2005 for the Monticello Nuclear Generating Plant. This letter makes no new commitments or changes to any existing commitments.

Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone: 763-295-5151
  • Fax: 763-295-1454

ENCLOSURE MONTICELLO OPERATING DATA REPORT AND UNIT SHUTDOWNS MARCH 2005 2 pages follow

DOCKET NO. 50-263 UNIT NAME Monticello DATE April 1, 2005 COMPLETED BY J. I. Helland TELEPHONE 763-295-1333 OPERATING DATA REPORT REPORTING PERIOD: March 2005

1. Design Electrical Rating (MWe-Net) 600.0
2. Maximum Dependable Capacity (MWe-Net) 578.1 MONTH YEAR TO DATE CUMULATIVE
3. Number of Hours the Reactor Was Critical 100.4 1,516.4 247,102.3
4. Number of Hours the Generator Was On Line 96.1 1,512.1 243,590.5
5. Unit Reserve Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWHe) 42,698 842,216 126,635,102

UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE 04 05 COMPLETED BY J. I. Helland REPORTING PERIOD: March 2005 TELEPHONE 763-295-1333 No. Type Method of Cause/Corrective Actions (Year F:Forced Duration Reason Shutting Down

- to - Date S:Scheduled (hours) (1) (2) Comments date) 1 3/5/05 S 643.6 C 2 Manual scram inserted for RFO 22.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Trip/Scram D Regulator Restriction 4 Continuation E Operator Training & Licensing Examination 5 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated continuously with the following power reductions: EOC22 coastdown continuation and an EOC shutdown for RFO 22. EOC 22 Coastdown continued until 3/4/05. The shutdown began at that time and ended with a manual scram inserted on 3/5/05.