ML19320B531 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 07/11/1980 |
From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML19320B527 | List: |
References | |
NUDOCS 8007140411 | |
Download: ML19320B531 (9) | |
Similar Documents at North Anna | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211H4311999-08-27027 August 1999
[Table view]Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 1999-08-04 Category:TEST REPORT MONTHYEARML20196K1971998-12-22022 December 1998
[Table view]Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20133E5151996-12-12012 December 1996 Rev 0 to NAPS Unit 2,Cycle 12 Startup Physics Test Rept ML20112E2281996-05-31031 May 1996 Rev 0 to NE-1073, North Anna Unit 1 Cycle 12 Startup Physics Tests Rept, for May 1996 ML20087L3811995-08-0303 August 1995 Cycle 11,Startup Physics Tests Rept ML20149H8941994-12-31031 December 1994 Cycle 11 Startup Physics Tests Rept. W/ ML20059K3241993-12-23023 December 1993 Cycle 10 Startup Physics Test Rept ML20045F5081993-06-30030 June 1993 Rev 0 to North Anna,Unit 1,Cycle 10 Startup Physics Tests Rept. W/930701 Ltr ML20045D9481993-03-31031 March 1993 Reactor Containment Bldg Integrated Leakage Rate Test Rept. ML18153A1221991-08-30030 August 1991 Test Rept, Compatibility of Mine Safety Appliances Custom 4500 Self-Contained Breathing Apparatus w/Oxygen-Enriched Breathing Gas. ML20077E6191991-06-0404 June 1991 Rev 0 to North Anna Unit 1 Cycle 9 Startup Physics Test Rept ML20066E6871990-10-31031 October 1990 Reactor Containment Bldg ILRT ML19327B1251989-10-31031 October 1989 Rev 0 to North Anna Unit 1 Cycle 8 Startup Physics Test Rept. ML20248E8741989-10-0202 October 1989 VEPCO North Anna Power Station Unit 1 Jul 1989 Reactor Containment Integrated Leakage Rate Test ML20247B9331989-07-14014 July 1989 VEPCO North Anna Power Station Unit 2 Apr 1989 Reactor Containment Integrated Leakage Rate Test, Per 10CFR50,App J ML20239A4301987-08-31031 August 1987 Cycle 7 Startup Physics Tests Rept ML20209F6491985-06-14014 June 1985 Rev a to Nuclear Environ Qualification Test Rept,Motor Control Ctr Contact Coils ML20100G3711985-02-0707 February 1985 Test Program to Determine Effects of Continuous 120% Rated Current on Motor Control Ctr Contactors During Normal & Extreme Svc Conditions ML20101C7791984-11-30030 November 1984 Cycle 4 Startup Physics Test Rept ML20106E2301984-10-31031 October 1984 Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test,Oct 1984 ML20106E2461984-09-30030 September 1984 Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test,Sept 1984 ML20077B8341983-06-30030 June 1983 Cycle 3 Startup Physics Test Rept ML20073K1381983-03-31031 March 1983 Cycle 4 Startup Physics Test Rept ML20062L9281982-07-31031 July 1982 Cycle 2 Startup Physics Test Rept ML20050C8951982-04-0505 April 1982 Natural Circulation Boron Mixing & Cooldown, Test Rept ML20054K6301982-03-31031 March 1982 Calibr & Verification of Cooling Lake Model for North Anna Power Station During Period Jul 1978-Sept 1981 ML18086B3431982-01-31031 January 1982 X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept. ML20126K8961981-05-31031 May 1981 Cycle 3,Startup Physics Test Rept ML20042C6501981-04-30030 April 1981 Cycle 1 Core Performance Rept. ML20004E0721981-03-31031 March 1981 Unit 1 Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test,Mar 1981. ML19343C3671981-03-0606 March 1981 Startup Rept. ML20010J1891981-02-0303 February 1981 Test Rept on Effects of Combined Gamma & Neutron Radiation on Borated Silicone Matrix CT-40-NS Type B Installed within Reactor Cavity of North Anna Nuclear Station Units 1 & 2. ML19341B4981981-01-16016 January 1981 Low Pressure Disc Ultrasonic Insp Rept. ML20062L2271980-12-31031 December 1980 Cycle 1 Startup Physics Test Rept ML19339B9391980-11-0707 November 1980 Summary of Unit 2 Turbine Driven Auxiliary Feedwater Pump Endurance Test. ML19330A4981980-07-22022 July 1980 Natural Circulation Test Rept, Conducted 800703-16 ML19320B5311980-07-11011 July 1980 Summary of Unit 2 Motor Driven Auxiliary Feedwater Endurance Tests. ML19320A7701980-06-30030 June 1980 Cycle 2 Startup Physics Test Rept. ML20126A8811980-02-25025 February 1980 Electrical Penetration Protection Control Circuits ML19257D3541979-12-31031 December 1979 Cycle 1,Core Performance Rept. ML19260C3371979-12-19019 December 1979 Rosemount Model 1152 - Severe Environ Test. ML19246C0171979-07-17017 July 1979 Reactor Containment Bldg Integrated Leak Rate Test,Type a, B & C. ML20104A1641979-02-15015 February 1979 Rock Anchor Test Program Rept. Results of Test Program Provide Basis for Selecting Anchor Sys,Grout Mix & Best Installation Methods for Permanent Anchors ML20064D4741978-11-0303 November 1978 Reservoir Spray Sys Test for Short Circuiting 1998-06-25 |