Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211H43127 August 1999Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints
ML20211D92020 August 1999Revised Pages to Third Ten Year ISI Program & Relief Requests
ML20210L1634 August 1999Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill OperationBoric Acid
Shutdown Margin
ML20212J30422 June 1999Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS
ML20195B58814 May 1999Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214Boric Acid
Stroke time
Cold shutdown justification
Scaffolding
ML20195B56914 May 1999Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
Scaffolding
ML20206N3696 May 1999Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation LogicShutdown Margin
Earthquake
ML20206G8363 May 1999Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture EventGrab sample
Pressure Boundary Leakage
Pressure boundary leak
ML20206H0303 May 1999Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing
ML20206G8813 May 1999Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVSUltimate heat sink
ML20205P2511 May 1999Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component SupportsVT-2
Dissimilar Metal Weld
ML20205P2341 May 1999Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430Boric Acid
Time of Discovery
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Through-Wall Leak
Dissimilar Metal Weld
Scaffolding
ML20203C8255 February 1999Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV OperabilityPressure Boundary Leakage
ML20205P2654 February 1999Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure TestsB.5.b Mitigating Strategies
ML20198J09722 December 1998Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197
ML20196K19722 December 1998Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998
ML20206N88514 December 1998Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp IntervalBoric Acid
Hydrostatic
VT-2
ML20206N87130 November 1998Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component SupportsBoric Acid
VT-2
Scaffolding
ML20195J44318 November 1998Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir
ML20195C94610 November 1998Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters
ML20154P28316 October 1998Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7
ML20153H53424 September 1998Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification
ML20236U84128 July 1998Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps
ML20236U87128 July 1998Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022Safe Shutdown
ML20236U86528 July 1998Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRPShutdown Margin
ML20236H5311 July 1998Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures IncludedSafe Shutdown Earthquake
Job Performance Measure
Design basis earthquake
Earthquake
ML20236U88925 June 1998Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept
ML20249C72119 June 1998Proposed Improved Tech Specs for North Anna ISFSITime of Discovery
Fuel cladding
ML20236H5544 June 1998Rev 5 to Procedure VPAP-0810, Crane & Hoist ProgramSafe Shutdown
Job Performance Measure
Control of Heavy Loads
ML20236H5394 June 1998Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load ProgramSafe Shutdown
Control of Heavy Loads
Scaffolding
ML20206N85830 April 1998Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430Hydrostatic
Nondestructive Examination
VT-2
Dissimilar Metal Weld
Scaffolding
Grace period
ML20236H5702 April 1998Rev 8 to Procedure VPAP-1901, Industrial Safety & HealthFitness for Duty
Fire Protection Program
Fatality
ML18152A36525 March 1998Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML20217E90125 March 1998Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGsSafe Shutdown
Probabilistic Risk Assessment
Maintenance Rule Program
Offsite Circuit
ML20236H56310 February 1998Rev 11 to Procedure VPAP-0105, Fitness for Duty ProgramFitness for Duty
Fatality
ML20202E1559 February 1998Proposed Tech Specs Re EDG Allowed Outage TimeSafe Shutdown
Maintenance Rule Program
Offsite Circuit
ML20202C5873 February 1998Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps
ML20202C3383 February 1998Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker
ML20210Q20531 December 19971997 Severe Accident Management Tabletop (Scenario 1) Drill ManualSevere Accident Management Guideline
ML20203G51929 December 1997Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water PipingNondestructive Examination
ML20199G41618 November 1997Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is InoperableSafe Shutdown
Boric Acid
Packing leak
Maintenance Rule Program
Pressure Boundary Leakage
Offsite Circuit
ML20199H40018 November 1997Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle ValvesSafe Shutdown
Probabilistic Risk Assessment
Turbine Missile
ML20199A1485 November 1997Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel
ML20198G54031 August 1997Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997
ML20199G56830 June 1997Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not IncludedShutdown Margin
Maintenance Rule Program
Scaffolding
Grace period
ML20210Q19910 June 1997Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program AdministrationReactor Vessel Water Level
Severe Accident Management Guideline
ML20141F37414 May 1997Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7
ML20137C85818 March 1997Proposed Tech Specs Re Containment Gaseous & Particulate Radiation MonitorsPressure Boundary Leakage
Pressure boundary leak
ML20134J4144 February 1997Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2Shutdown Margin
ML20134F1233 February 1997Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2