Deficiency Rept Re Failure of Mcgraw Edison Electronic Control Circuit for Detecting High Temps in Air Filtration Sys.Caused by Acid Flux Used in Sealing.Recall Notice Issued.Permanent Solution to Be Implemented by 800829ML19323D862 |
Person / Time |
---|
Site: |
Hartsville |
---|
Issue date: |
05/03/1980 |
---|
From: |
Kammerzell D MCDOWELL-WELLMAN CO. |
---|
To: |
|
---|
References |
---|
REF-PT21-80-217-000 NUDOCS 8005220449 |
Download: ML19323D862 (9) |
|
|
---|
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153G1021986-02-19019 February 1986 Part 21 Rept Re Potential Defect in K-1 Relays of Dsr or Dsrv Standby Diesel Generators Mfg by Gould/Ite.Relays Have Incorrect Voltage Range.Dc Voltage Source or Voltage Regulator Circuitry Requires Mod ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20084G3531984-04-19019 April 1984 Final Deficiency Rept Re Pacific Scientific Co Shock Arrestor Capstan Spring Tang.Initially Reported on 831013. Bellefonte Snubbers Will Be Replaced & Hartsville Snubbers Returned to Vendor for Repair.Springs Subj to Insp ML20087J6661984-03-0808 March 1984 Followup Part 21 Rept Re Nuclear Valve/Actuator Stroking Time Possibly Lengthened Beyond 15 When Using hydrocarbon-based Lubricants.Ltrs to Affected Utils Encl ML20081C0171984-03-0101 March 1984 First Interim Deficiency Rept Re Loose Drive Hubs on Overspeed Governor Drive Shaft on Transamerica Delaval,Inc Diesels.Initially Reported on 840203.Svc Info Memo Being Reviewed for Approval.Also Reportable Per Part 21 ML20079N5121984-01-23023 January 1984 Final Deficiency Rept Re Delaval Problem W/Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Capscrews Replaced Per Approved Procedure & Drawings Revised to Reflect Shorter Length ML20083H1921984-01-0505 January 1984 First Interim Deficiency Rept Re Transamerica Delaval,Inc QA Program.Initially Reported on 831206.Final Configuration for Control Cabinet Indicates Drawing Revs K,L & M Not Incorporated.Also Reportable Per Part 21 ML20083E1981983-12-20020 December 1983 First Interim Deficiency Rept Re Fuel Oil Line Rupture in Transamerica Delaval,Inc Generator.Initially Reported on 831121.Const Activities Deferred for Hartsville Units 1 & 2. Next Rept Expected by 840413.Also Reported Per Part 21 ML20078B3811983-09-0606 September 1983 Part 21 Rept Re Matrix Actuator Model 33122-SR 80.Mounting Bolts Loosened & Spring Return Cylinder Began to Separate from Ctr Body of Actuator.Investigation Being Conducted by Xomox Corp ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20083L9751983-05-27027 May 1983 Part 21 Rept Re Failure of Circuit Breakers During Environ Testing.Test Results Indicate That Temp Sensitivity Problem May Be Generic to All Ite Imperial Corp thermal-magnetic Circuit Breakers Calibr for 40 C Svc ML20076H1601983-05-23023 May 1983 Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed ML20074A2041983-04-26026 April 1983 Interim Deficiency Rept Re Misapplication of Ite Gould Circuit Breakers in post-LOCA Hydrogen Recombiners Supplied by Rockwell Intl.Initially Reported on 830328.Matter Under Investigation.Final Rept by 830808.Reported Per Part 21 ML20069K6811983-04-18018 April 1983 First Interim Deficiency Rept Re Pipe Support Spacing Utilizing Alternate Criteria.Initially Reported on 830317. Investigation Postponed Until Design & Const Resumed ML20073J8051983-04-12012 April 1983 Third Interim Deficiency Rept Re Nonconservative Calculation Method for General Const Spec G-32 Violations.Initially Reported on 820528.Design Std Being Revised to Clarify Use of Factors of Safety in DS-C6.1 ML20073P1281983-04-0808 April 1983 Second Interim Deficiency Rept Re Problem W/Delaval Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Util Continuing to Attempt to Acquire Necessary Info from Transamerica Delaval,Inc.Also Reported Per Part 21 ML20072Q9571983-03-28028 March 1983 First Interim Deficiency Rept Re Failure of Util Div of Engineering Design to Provide Bolt Tightening Requirements to Div of Const.Initially Reported on 830228.Const Deferred. Rept to Be Submitted When Const Decision Made ML20072R3291983-03-28028 March 1983 Interim Deficiency Rept 1 Re CF Braun Documentation Control Program Failure to Monitor Closeout of Final Design Change Control Documents.Initially Reported on 830302.Final Rept Due Upon Commencement of Const.Also Reportable Per Part 21 ML20074A2221983-03-11011 March 1983 Part 21 Rept Re Failure of post-LOCA Hydrogen Recombiner Component During IEEE-323 Qualification Program.Circuit Breaker Not Properly Selected for Specific Application.Plant Operators Notified of Deviation ML20028G0821983-01-31031 January 1983 Final Deficiency Rept Re Itt Grinnell Failure to Use Proper Testing Methods.Initially Reported on 810304.Spool Pieces re-examined Per ASME Section III,1974 Edition,Winter Addenda 1975 Code.Condition No Longer Reportable Per 10CFR50.55(e) ML20083M6651983-01-24024 January 1983 First Interim Deficiency Rept Re Residual Stress on Diesel Generator Engine Piston Skirt Castings.Initially Reported on 821215.Removal of Piston Skirt for Insp Deferred Until Restart of Design & Const.Also Reportable Per Part 21 ML20083M6711983-01-24024 January 1983 First Interim Deficiency Rept Re Potential Deterioration of Isoprene Gaskets on Standby Diesel Generator.Initially Reported on 821217.Transamerica Delaval,Inc Changed Matl for Drive Element to Neoprene.Also Reportable Per Part 21 ML20028C2481982-12-30030 December 1982 First Interim Deficiency Rept Re Insufficient Length of Starting Air Valve Assembly Capscrews.Initially Reported on 821201.Transamerica Delaval,Inc Changed Designed Length of Capscrew.Next Rept by 830415.Also Reportable Per Part 21 ML20070F0121982-12-13013 December 1982 Final Deficiency Rept Re Atlas QA Documentation on Auxiliary & Fuel Bldg Structural Steel.Initially Reported on 811113. QA Hold Placed on Suspect Items Until Further Testing Performed.Also Reportable Under Part 21 ML20028A4891982-11-0909 November 1982 Final Deficiency Rept Re Storage & Preventive Maint Program Deficiencies.Initially Reported on 821007.Pipe Caps Replaced,Piping Placed on Support,Tanks Moved to Inside Storage in Upright Position & Conditions & Program Reviewed ML20065R3701982-10-14014 October 1982 Interim Deficiency Rept Re Deferral of Const Activities. Initially Reported on 820623.Commitments Made in Rept,Audit Findings & Response to Violations Deferred Until Restart of Design & Const ML20027B8451982-09-20020 September 1982 First Interim Deficiency Rept Re QA Deficiencies on Allis- Chalmers Butterfly Valves.Initially Reported on 820823.Const Activities Deferred.Final Rept Will Be Submitted After Final Decision Re Completion or Cancellation of Project ML20063L3721982-09-0202 September 1982 First Interim Deficiency Rept Re Failure of Kerotest Valves to Meet Seismic Criteria.Initially Reported on 820804. Negotiations Underway W/Contractor for Return of Valves. Const Activities Deferred.Also Reportable Per Part 21 ML20055A0731982-07-0707 July 1982 First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached ML20055A0791982-07-0606 July 1982 First Interim Deficiency Rept Re Possible Installation of Bolt Anchors in Grant Areas,Initially Reported 820610. Investigation Postponed Until Const Resumed ML20054N0821982-07-0101 July 1982 Final Deficiency Rept Re Excessive Stress on Spray Pond Supply & Bypass Headers,Initially Reported on 820218. Piping Layout Revised & Drawings Revised/Reissued.Seismic Analysis Complete & Isometrics Issued ML20054J9111982-06-23023 June 1982 Part 21 Rept Re Potential Defect in Couplings Drive Element of Dsrv or Dsr Standby Diesel Generator.Affected Licensees Will Be Notified No Later than 820715 ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054H6821982-06-18018 June 1982 Part 21 Rept Re Pneumatic Actuator Yoke Failure.List of Other Projects W/Similar Equipment Encl ML20054G1121982-06-11011 June 1982 Fourth Interim Deficiency Rept Re Link Rod assembly-Delaval Diesels.Due to Const Deferment Final Deficiency Rept Will Not Be Issued Pending Final Decision on Future of Projects. Also Reportable Per Part 21 ML20054E4111982-06-0101 June 1982 Fourth Interim Deficiency Rept Re Bethlehem Steel Co Galvanized A325 Bolts,Initially Reported on 811029.Const Activities Deferred Until Sufficient Info Indicates Whether Project Should Be Completed or Canceled ML20054E4081982-06-0101 June 1982 First Interim Deficiency Rept Re Split in Biological Shield Wall,Initially Reported on 820429.Investigation Postponed Until Const Activities for Project Resume.No Final Rept Will Be Submitted Until Decision Made Re Continuation of Const ML20053E1201982-05-28028 May 1982 Second Interim Deficiency Rept Re Check Valve Leak in Air Start Sys of Standby Diesel Generators,Initially Reported 820209.Evaluation by Vendor Underway.Also Reported Per Part 21 ML20052A6071982-04-19019 April 1982 Suppl to Final Deficiency Rept Re Standby Gas Treatment Sys Charcoal Absorber,Initially Reported 800508.Util Unable to Meet Corrective Action Completion Date in 811209 Final Rept Due to Deferral of Const.Also Reported Per Part 21 ML20052A5981982-04-12012 April 1982 Final Deficiency Rept Re Incorrect Orifice Size in RHR Discharge Line Indicated on Fabrication Spec,Initially Reported 820304.Typographical Error Corrected Before Hardware Mfg ML20054B1101982-04-0202 April 1982 Fifth Interim Deficiency Rept Re Review of Purchase Request Forms Initiated by Const,Initially Reported 810520.Util in Process of Analyzing Deficiencies.Next Rept Expected by 820715 ML20054C4691982-04-0101 April 1982 Part 21 Rept Re Hma Relays W/Contact Leads Not Fully Insulated,Initially Reported 810708.No Operating BWRs Utilize Subj Hma Relays.All Potential Problems Will Be Corrected Before Startup ML20054B4931982-04-0101 April 1982 Fifth Interim Deficiency Rept Re Pressure Drop in Svc Water Piping,Initially Reported on 801210.Deficiency Still Being Evaluated.Next Rept Will Be Provided by 820715 1993-12-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153G1021986-02-19019 February 1986 Part 21 Rept Re Potential Defect in K-1 Relays of Dsr or Dsrv Standby Diesel Generators Mfg by Gould/Ite.Relays Have Incorrect Voltage Range.Dc Voltage Source or Voltage Regulator Circuitry Requires Mod ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20084G3531984-04-19019 April 1984 Final Deficiency Rept Re Pacific Scientific Co Shock Arrestor Capstan Spring Tang.Initially Reported on 831013. Bellefonte Snubbers Will Be Replaced & Hartsville Snubbers Returned to Vendor for Repair.Springs Subj to Insp ML20087J6661984-03-0808 March 1984 Followup Part 21 Rept Re Nuclear Valve/Actuator Stroking Time Possibly Lengthened Beyond 15 When Using hydrocarbon-based Lubricants.Ltrs to Affected Utils Encl ML20081C0171984-03-0101 March 1984 First Interim Deficiency Rept Re Loose Drive Hubs on Overspeed Governor Drive Shaft on Transamerica Delaval,Inc Diesels.Initially Reported on 840203.Svc Info Memo Being Reviewed for Approval.Also Reportable Per Part 21 ML20079N5121984-01-23023 January 1984 Final Deficiency Rept Re Delaval Problem W/Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Capscrews Replaced Per Approved Procedure & Drawings Revised to Reflect Shorter Length ML20083H1921984-01-0505 January 1984 First Interim Deficiency Rept Re Transamerica Delaval,Inc QA Program.Initially Reported on 831206.Final Configuration for Control Cabinet Indicates Drawing Revs K,L & M Not Incorporated.Also Reportable Per Part 21 ML20083E1981983-12-20020 December 1983 First Interim Deficiency Rept Re Fuel Oil Line Rupture in Transamerica Delaval,Inc Generator.Initially Reported on 831121.Const Activities Deferred for Hartsville Units 1 & 2. Next Rept Expected by 840413.Also Reported Per Part 21 ML20078B3811983-09-0606 September 1983 Part 21 Rept Re Matrix Actuator Model 33122-SR 80.Mounting Bolts Loosened & Spring Return Cylinder Began to Separate from Ctr Body of Actuator.Investigation Being Conducted by Xomox Corp ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20024C1401983-06-30030 June 1983 Engineering Evaluation Rept:Investigation & Grouting of Leaks Associated W/Tendon Sheaths H32-009 & H32-011,Unit 2 Containment Bldg. ML20073S8641983-05-31031 May 1983 Details of Deferral Plans for Hartsville Nuclear Plant a ML20083L9751983-05-27027 May 1983 Part 21 Rept Re Failure of Circuit Breakers During Environ Testing.Test Results Indicate That Temp Sensitivity Problem May Be Generic to All Ite Imperial Corp thermal-magnetic Circuit Breakers Calibr for 40 C Svc ML20076H1601983-05-23023 May 1983 Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed ML20074A2041983-04-26026 April 1983 Interim Deficiency Rept Re Misapplication of Ite Gould Circuit Breakers in post-LOCA Hydrogen Recombiners Supplied by Rockwell Intl.Initially Reported on 830328.Matter Under Investigation.Final Rept by 830808.Reported Per Part 21 ML20069K6811983-04-18018 April 1983 First Interim Deficiency Rept Re Pipe Support Spacing Utilizing Alternate Criteria.Initially Reported on 830317. Investigation Postponed Until Design & Const Resumed ML20073J8051983-04-12012 April 1983 Third Interim Deficiency Rept Re Nonconservative Calculation Method for General Const Spec G-32 Violations.Initially Reported on 820528.Design Std Being Revised to Clarify Use of Factors of Safety in DS-C6.1 ML20073P1281983-04-0808 April 1983 Second Interim Deficiency Rept Re Problem W/Delaval Starting Air Valve Assembly on Standby Diesels.Initially Reported on 821201.Util Continuing to Attempt to Acquire Necessary Info from Transamerica Delaval,Inc.Also Reported Per Part 21 ML20079E9911983-03-31031 March 1983 Caseload Forecast ML20072Q9571983-03-28028 March 1983 First Interim Deficiency Rept Re Failure of Util Div of Engineering Design to Provide Bolt Tightening Requirements to Div of Const.Initially Reported on 830228.Const Deferred. Rept to Be Submitted When Const Decision Made ML20072R3291983-03-28028 March 1983 Interim Deficiency Rept 1 Re CF Braun Documentation Control Program Failure to Monitor Closeout of Final Design Change Control Documents.Initially Reported on 830302.Final Rept Due Upon Commencement of Const.Also Reportable Per Part 21 ML20074A2221983-03-11011 March 1983 Part 21 Rept Re Failure of post-LOCA Hydrogen Recombiner Component During IEEE-323 Qualification Program.Circuit Breaker Not Properly Selected for Specific Application.Plant Operators Notified of Deviation ML20028G0821983-01-31031 January 1983 Final Deficiency Rept Re Itt Grinnell Failure to Use Proper Testing Methods.Initially Reported on 810304.Spool Pieces re-examined Per ASME Section III,1974 Edition,Winter Addenda 1975 Code.Condition No Longer Reportable Per 10CFR50.55(e) ML20083M6651983-01-24024 January 1983 First Interim Deficiency Rept Re Residual Stress on Diesel Generator Engine Piston Skirt Castings.Initially Reported on 821215.Removal of Piston Skirt for Insp Deferred Until Restart of Design & Const.Also Reportable Per Part 21 ML20083M6711983-01-24024 January 1983 First Interim Deficiency Rept Re Potential Deterioration of Isoprene Gaskets on Standby Diesel Generator.Initially Reported on 821217.Transamerica Delaval,Inc Changed Matl for Drive Element to Neoprene.Also Reportable Per Part 21 ML20028C2481982-12-30030 December 1982 First Interim Deficiency Rept Re Insufficient Length of Starting Air Valve Assembly Capscrews.Initially Reported on 821201.Transamerica Delaval,Inc Changed Designed Length of Capscrew.Next Rept by 830415.Also Reportable Per Part 21 ML20070F0121982-12-13013 December 1982 Final Deficiency Rept Re Atlas QA Documentation on Auxiliary & Fuel Bldg Structural Steel.Initially Reported on 811113. QA Hold Placed on Suspect Items Until Further Testing Performed.Also Reportable Under Part 21 ML20028A4891982-11-0909 November 1982 Final Deficiency Rept Re Storage & Preventive Maint Program Deficiencies.Initially Reported on 821007.Pipe Caps Replaced,Piping Placed on Support,Tanks Moved to Inside Storage in Upright Position & Conditions & Program Reviewed ML20069Q3701982-10-31031 October 1982 Socioeconomic Monitoring & Mitigation Rept ML20069Q3771982-10-31031 October 1982 Const Employee Monitoring Errata Rept ML20065R3701982-10-14014 October 1982 Interim Deficiency Rept Re Deferral of Const Activities. Initially Reported on 820623.Commitments Made in Rept,Audit Findings & Response to Violations Deferred Until Restart of Design & Const ML20027B8451982-09-20020 September 1982 First Interim Deficiency Rept Re QA Deficiencies on Allis- Chalmers Butterfly Valves.Initially Reported on 820823.Const Activities Deferred.Final Rept Will Be Submitted After Final Decision Re Completion or Cancellation of Project ML20069D5241982-09-10010 September 1982 Socioeconomic Monitoring & Mitigating Rept,Sept 1981 ML20063L3721982-09-0202 September 1982 First Interim Deficiency Rept Re Failure of Kerotest Valves to Meet Seismic Criteria.Initially Reported on 820804. Negotiations Underway W/Contractor for Return of Valves. Const Activities Deferred.Also Reportable Per Part 21 ML20055A0731982-07-0707 July 1982 First Interim Deficiency Rept Re Nonconformance in Intake Pumping Station Door & Hatch Design,Initially Reported 820604.Final Rept Will Not Be Issued Until Decision to Resume Facility Const Reached ML20055A0791982-07-0606 July 1982 First Interim Deficiency Rept Re Possible Installation of Bolt Anchors in Grant Areas,Initially Reported 820610. Investigation Postponed Until Const Resumed ML20054N0821982-07-0101 July 1982 Final Deficiency Rept Re Excessive Stress on Spray Pond Supply & Bypass Headers,Initially Reported on 820218. Piping Layout Revised & Drawings Revised/Reissued.Seismic Analysis Complete & Isometrics Issued ML20054J9111982-06-23023 June 1982 Part 21 Rept Re Potential Defect in Couplings Drive Element of Dsrv or Dsr Standby Diesel Generator.Affected Licensees Will Be Notified No Later than 820715 ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20054H6821982-06-18018 June 1982 Part 21 Rept Re Pneumatic Actuator Yoke Failure.List of Other Projects W/Similar Equipment Encl ML20054G1121982-06-11011 June 1982 Fourth Interim Deficiency Rept Re Link Rod assembly-Delaval Diesels.Due to Const Deferment Final Deficiency Rept Will Not Be Issued Pending Final Decision on Future of Projects. Also Reportable Per Part 21 ML20054E4111982-06-0101 June 1982 Fourth Interim Deficiency Rept Re Bethlehem Steel Co Galvanized A325 Bolts,Initially Reported on 811029.Const Activities Deferred Until Sufficient Info Indicates Whether Project Should Be Completed or Canceled ML20054E4081982-06-0101 June 1982 First Interim Deficiency Rept Re Split in Biological Shield Wall,Initially Reported on 820429.Investigation Postponed Until Const Activities for Project Resume.No Final Rept Will Be Submitted Until Decision Made Re Continuation of Const 1993-12-09
[Table view] |
Text
__. _ _ _ _ - _ _ _ _ _ _ -
.
.
ATTACWD IS A PART 21 REPORT FRCN lE t%Il UNIT - ROOM 359E/W PART21IDENTIFICATIONNO. ff 6 -&'l-o o c COPPANY t#ECIT- hAvu DATEOFLETTER *~/YIo DOCKETNO.
~
DATEDISTRIBUTED /3 /rd ORIGINAL REPORTSUPPLEFENTARY 2 _
DISTRIBLITION:
~ ~
REACTOR (R) M REL CYCLE g SAFEGtMRDS(S) f%TERIALS(M)
NRR/ DOR, DIRECTOR ~ AD/FFMSI- AD/SG-IE NRR/DPM DIRECTOR -
INSS/FCMS AD/RDI AD/RDI ( 2 ) REGIONS REGIONS
~
AD/RCI IEFILES NRR/DDR,DIECTOR -
REGI0tG PDR INSS/SG SS-881 IEFILES(2) LDDR PDR
.
CENTRALFILES CENTRAL FILES-SS-3% LPDR CENfRAL FILES (CHRON) FILES (CHRON) TEPA PDR IE FILES (2)
LPDR f - CENTPAL FILES 016 TEPAd L0EB/FPA M B 5715 ,
l CENTRAL FIES (CHRON)
' ^
PA MG 5715 l EOD - MBB-7602 CENTPAL FILES - SS-396 i
AEOD ffGB-7602 LEB/tPA MB 5715 '
.
AE0D ttGB-7602.
ACTION: .
PRO _IMINARY EVUALATION OF THE ATTACHED fiEPORT INDICATES LEAD RES FOLLOf-UP AS SHOWN BELOW:
EE] H8R .__ NfE __ DER __.
EP ROI SG FFMSI Q EV. 5/5/80
.
'
. .
-
CTFNUCLEAR Division of McDowsil-Wellman Company May 3, 1980 O id.13X0%
Mr. J. G. Kepeler -- - -
Office of Inspection & Enforcement ..
-
- -
-
.
U.S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Glen Allen, Illinois 60137 g , g j7,_ g 6 SUBJ: 10 CFR 21 NOTICE OF POTENTIAL FAILURE TO COMPLY OF TEMPERATURE DETECTION UNITS Gentlemen:
This is to confirm our telecon of April 30, 1980 reporting a defect pursuant to 10 CFR 21.
Notification is hereby provided of the following information:
(1) Name and address of the individual or individuals informino the Commission.
CTI-Nuclear Division of McDowell-Wellman Company 113 St. Clair Avenue Cleveland, Ohio 44114 (2) Identification of the facility, the activity, or the basic component supplied for such facility or such activity with-in the United States which fails to comply or contains a defect.
The device used by CTI-Nuclear is McGraw Edison P/N 377-02831, arid is an inte-gral part of the electronic control circuit for detecting high temperatures.in the airstream, both upstream and downstream of the vertical deep bed gasket-less carbon filters in various air filtration systems. The device is also used as part of a control circuit for high temperatures themal cutout of electric air. heaters in the same air filtration system. These controllers are used on CTI-Nuclear Part Numbers D-31557, D-31556, D-31555, D-32063, D-31441, and D-31250.
,
(3) Identification of the fim constructinp the facility or supplyino the basic component wnich fails to comply or contains a defect.
Edison Electronics Division of McGraw Edison MAY Manchester, New Hampshire g ygOO
'
113 St. Clair Ave. N.E., Cleveland, Ohio 44114, U.S.A. ! (216) 6219955 TWX B10-4218263 f
.
'
-
CTI-NUCLEAR Mr. J. G. Kepeler May 3, 1980 (4) Nature of the defect or failure to canoly and the safety hazard which is created or could be created by such de-feet or failure to comoly.
An electronic component similar to devices supplied to CTI-Nuclear failed in service. McGraw Edison attributes the only known failure to use of acid flux in sealing some of the controls during manufacture. McGraw Edison has con-ciuded that there is no convenient method of detarmining in the field if the controllers were sealed with acid flux. The acid flux reportedly could cause corrosion in the controller and result in failure. The mode of a failure is unpredictable, a failure could cause the controller to give erroneous indica-tions such as,1) failing to open and not closing at an alarm point, 2) fail-ing closed and giving a false alarm, or 3) failing at some internediate step and functioning inaccurately.
(5) The date on which the information of such defect or
, failure to comply was obtained.
'
February 12, 1980 (6) In the case of a basic comconent which contains a defect or fails to comply, the number and location of all such components in use at, sucolied for, or being supplied for one or more f acilities or acti-vities subject to the reoulation in tnis part,
,
Number of CTI-Nuclear P.O. Controllers Purchased 3919 22 3438 26 2462 89, 137 Total Units Supplied t'o Nuclear Plants Palo Verde Nuclear Generating Station Contract 10407-13-MM-721B Equip. Number Temo. Detection Mat'l Control 1,2M-HJA(B)-F04 Yes , 8 Controllers No 1-M-HFA(B)-J01 Yes, 4 Controllers Yes, 2 Controllers 1-M-HAN-J01(A)B Yes, 4 Controllers No 1,2M-ARN-F01 Yes 4 Controllers Yes, 2 Controllers 1-M-CPN-J02 Yes, 2 Controllers No 1-M-HPM-J01 Yes, 2 Controllers Yes, 1 Controller Total Delivered to Palo Verde - 29 l
1 l
.
.
CTI-NUCLEAR Mr. J. G. u p9ict Mey 3, 1980 Tennessee Valley Authority Hartsville Power Plant Contract 77K31-820047 Carbon High Equid. Number Temperature Detection Heater Control P38-22001 4 Controllers / Units I controller / Unit 12/ Units Total Delivered to Hartsville - 60 Stock Units Returned to Edison Electronics - 46 Accounted For - 135 Missing and Presumed Lost, or Damaged and Discarded During Fabrication - 2 (7) The corrective action which has been, is beinn, or will be taken; the name of the individual or organization re-
.
sponsible for tne action and the length of time that has
. been or will be taken to comalete tne action.
McGraw Edison has issued a recall notice to its customers to return the con-trollers for repair or replace the units.
CTI-Nuclear is similarly recalling the devices from its customers for return to McGraw Edison. We currently estimate that we will have returned all of the controllers to Edison Electronics by July 31, 1980, and that by August 29. 1980, a recommended permanent solution to the problem will be implemented.
(8) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is _being, or will be given to purchasers or licenses.
Recall notifications will be forwarded to CTI-Nuclear customers who have purchased CTI-Nuclear Air Filtration Systens bearing CTI-Nuclear Part Numbers; D-31557, D-31556, D-31555, D-32063,-D-31441, and D-31260.
.
f
.
,
.
CTi-NUCLEAR Mr. J. G. Kepeler May 3, 1980 We trust that you will find this notification consistent with the requirements of 10 CFR 21.
If additional action is required, please advise us accordingly.
1 Very truly yours, CTI-NUCLEAR %
"Z~i% y ___ _ , . _--
Donald L. Xamerzell Manager of Operations DLK/js cc: Mr. Knop /USNRC
.
o se
Evaluccion of Report Ns. @01
,
10 C7R 21 Report R visw d by QA Mannget
"
Date April 24 1980
. .
l 10 CFR 21 EEpORT EVALUATION i
l l A. Is Problem Stated Clearly and Adequately Defined? If Not, Restate Problen.
TEs
.
B. Is the Reported Condition A Basic Cc=penent or Activity? Yes X No Review Definitions 4.5 and 4.6.
Note - A cocenercial part dedicated by CTI-Nuclear C. Prerequisites for Evaluatio:2 - Does the 10 CFR 21 Report Involve any of the Tollowing: , ,
.
Yes No
..
- 1. Is "*/roblem" part of a safety-related system structure I component?
- 2. Does the part perform a safety function v.' thin the I system?
- 3. Is " Problem" part of seisr.ic Category I equipment? I
- 4. la function. described in procurement specification to CTI-Nuclear or by NXC Regulatory Guide or rule? X _
- 5. Has equipment been offered for acceptance to CTI-Nuclear or our customer? NOTE: At least one "yes" must be checked above for the " Problem" to have
-
the potential for creating a substantial safety hazard. X D. Is the " Problem" Valid, i.e., does the Condirion E:cist as reported? X Explain Reasoning We have a proble= because va cannot verify that acid flux was not used Note - We assume here that the problem exist, i.e.
- 3. Does the nProblem n acid flux was used.
- 1. Put equipment outside of performance requirements.of procurement. specificati.on? I
- 2. Reduce the margin of safety as defined by technical X
specifications?
- 3. Increase' the probability of occurence or the severity
-0 f
ac ent or. malfunction of equipment important I
_ _ _ _ . _ .
.
-2
. .
.
.
. Tas No
.
4 Create an event which is required by Part 21 regulations or technical specifications to be reported to the NRC or our customer (s). I
- 5. Create a situation that could result in potential offsite exposures co= parable to those referred to in Section 100.11 of Title 10? I NOTE:
An answer of "yes" to any of the above questions indicates a condition or defect that must be reported to h'RC or our custccer(s) . Note, the same conditions reported by others to NRC under other regulations such as 10 CFR 50.55e a requirement of an NRC licensed facility (which CTI-Nuclear is not) requires CTI-Nuclear to report under 10 CTR 21. CTI must report, however, on the disposition of similar equipment. It is advisable to discuss the conditions with the NRC to assure that the reporting has been co pleted and to follow to detail disposition of equipment with other affected customers.
.
F. ~
Evaluation Notes and Cousaents:_, we cannot be sure that the defect exists However, there' is a reasonable possibility that a defect exists
.
.
I l
C. Evaluation Team and Other
Participants:
!
!
1
- 1. R. Maier 2. M. Brejer 3. R. Wojnarowski' l
- 4. J. Carrillo 5. D. W:.llett 6. D. Km::nnerzell 1
'
,
H.
Conclusion:
The Evaluation Team has concluded @ Unanimously C by majority vote (mark one) that the Deviation or Tailure to Comply described on the attached 10 CFR 21 report (
defect. @ does C does not (mark one) create a Substantial Safety Hazard, and is Pi.ll in names of voting team members below if vote was not tmm+ nous:
Majority:
-
Minor 1ry: _
l DA1 chairman 9 h30-i(D (Date)
Remarks:
.
)
.
l
_
~
'
ATT.ACEMENT NC. ,
. PAGE OF
, NOTE: Cocrplete this page only if the Evaluation Tea = concludes that the Defect or Failure to Com: ply does create a Substantial Safety Hazard.
I. Identification of fir:: constructing the facility or supplying the basic co=ponent or activity that f ails to cencply or contains.a defect:
Edison Electronics. Div of McGrav Edison. Crenier Field Municinal Airport. Manchester, New Hampshire 03103. Suoplied as cart of
' ~ ' ~
C i-NEc'1' ear Part Nos'D-3i55'7, D 31.i5'5,' D-3155'5$ D-32063. D31441. &
'
2 D-31260.
J. The number and location in the facility of all basic co=ponents or acti-vities that f ail to com' ply or contain a defect:
See Attachment I .
I. The Corrective Action that has been, or will be ts. ken; the name of the individual or organization responsible for the action and the length of time that has been, or will be, taken to complete the action.
.
R ,rm71 boxe_s bv 5/1/580. mend to M-Crav E?Mann bv 7 /11 /80. kmve answer bv 8/29/80.
L. The advice related to the Defect or Failure to comply about the facility, or basic component or activities that has been, or is being, or will be 51 ven to purchaser or liscensee.
Reonir or replace bv ennufacturer. not field reunirable
_ _ _
DISTRIBUTION: . _ _ . . . . . . .. .. .
F. Gabron - Helix R. Wojnarowski V. Dr.lsania D. Yamerzell J. Carrillo E. Sobon
- E. Ellsworth Quality Assurance Records J. Jac5. son - Belix
..
_ _ _ _ _ _ _ __
,
.
,
-
Attachment 1
.
CTI-Nuclear P.O. Number of Controllers Purchased 3919 22 3438 26 2462 89 Units supplied to nuclear plants -- ~~
Palo Verde Nuclear Generating Station Contract 10407-13-MM-721B Eauipment Number Carbon High Temp. Detection Heater Control 1,2M-HJA(B)-F04 Yes-B Controllers No
"
1-M-HFA(B)-J01 '
Yes-4 Yes-2 Controllers
"
1-M-HAN-J01(AIB Yes-4 No 1,2M-ARN-F01 Yes-4 "
Yes-2 Controllers _
l-M-CPN-J02 Yes-2 "
No 1-M-HPM-J01
- Yes-2 Yes-1 Controller Total delivered to Palo Verde -- 29
.
Tennessee Valley Authority Hartsville Power Plant Contract 77K31-820427 Equipment Number Carbon Hioh Temp. Detection Heater Control P38-ZZ001 A&B 4 Controllers 1 Controller Total delivered to Hartsville -- 60 Stock units returned to Edison Electronics -- 46
'
Accounted for -- 135 Missing and presumed lost, damaged and discarded during fabrication -- 2
.