Farley Nuclear Plant, NRC Screening Criteria Response
ML101670548
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/08/2010
From: Ajluni M, Lattner J, Martin R, Sutton D
Southern Nuclear Operating Co
To:
NRC/NRR/DIRS/IRIB
Jeremy Bowen, 415-3471
Shared Package
ML101670555 List:
References
Download: ML101670548 (7)


Text

Enclosure 4 Farley Nuclear Power Plant Presentation Meeting Summary of the 6/8/2010 Meeting with NRC/SNC/FPL/SCE&G Dated June 17, 2010

Farley Nuclear Plant NRC Screening Criteria Response Mark Ajlun i SNC Nuclear Licensing Manager Dom Sutton SNC Programs Manager Ray Martin FNP Technica l Services Manager John Lattner FP Principle Engineer June 8, 2010

c 0

.-

~ co

.-

U l...

Q)

Q)

~ .-

"'-'

l...

0 C o U S- .- 01 Ul C

0 CL "'-'

U

.- .-

C Q) .-

l C > Ul
l Q) CO "'0 Q) "'-'

S- 0 Q) .-

CO u

.- "0 c

l...

"'-'

l...

.-

"'-' C LL c OJ .......

u c 0 (J) ....... U CL 01 zLL <<

0

FNP Fire Protection o Introduction

  • FNP - Two 900 MWe 3 loop Westinghouse PWR Units

Design Features Fire Fighting Equipment Personnel Training Operating Procedures

NRC Screening Criteria Criteria Applies to Reason/Info FNP Large Number of Operator Yes* FNP is estimated to have sign ificantly less than Actions BFN but more than th e other SNC plants.

Singl e Fire ca n effect more No

  • Fire areas/equipment relied upon for App R safe than one Unit. shutdown are not common. Shared DG's can be im pacted . DG redundancy ensures SSD.

Use of Thermop lastic Cables Not Some thermoplastic used for low voltage Sign ificant* applications such as cameras or telecommun ications . Less tha n 8 % of cables installed.

Problems docu mentin g cable No No significant issues with documenting cab le routing routing.

Ana lysis Credits Self Induced No SISBO not cred ited Station Blackouts Comp li cated Manua l Operato r Yes

  • Based on NRC criteria. Current manua l actions are Actions felt to be reasonable. Operators are trained and drilled on actions . Compensatory actions in place .

Mit igation of a fire requ ires Not No electrical cross connections credited. Lim ited the use of systems f rom Sign ificant use of cross connected air systems. N2 backup to multiple units (electrical or PORV's is cred ited and is not a cross connected mechanical cross-unit t ies). system .

Use of Symptom based Yes* Although decision required, event recogn it ion is not Procedu res. req uired.

FNP Fire Protection Initiatives D Initiatives

  • Elimination of Kaowool fire wrap by cable reroute to ensure proper cable separation was complete in 2006
  • Fire PRA Model under development
  • OMA Feasibility Study & Compensatory Actions

FNP Fire Protection Summary o OMA along with procedures is the main reason for yes screen criteria o Conservative LOSP assumption has added OMAs o Application of NFPA 805 will significantly reduce OMAs o Thermoplastic cables used in lower voltage applications and low 0/0 o No reliance on cable wrap material proper separation exists for cables.

o FNP believes that 3 of the 8 screening criteria are material.