FNP NFPA 805 LAR Submittal Overview Overview March 19-21, 2013 Circuit Analysis

Summary

  • Circuit Analysis Process and Controls A

l t Q lifi ti

  • Analyst Qualifications
  • Governing Analysis Criteria SC
  • Analysis Methodology
  • Circuit Analysis Database
  • Associated Circuits Circuit Analysis Slide 2 of 14

Process and Controls

  • Circuit Analysis Process Performed IAW approved procedure

- Performed IAW approved procedure

- Strict and formal analysis conventions

- Emphasis on consistency and standardization Emphasis on consistency and standardization

- Integrated PRA and NSCA requirements

  • Controls Controls

- Rigidly defined Function States

- Independent verification for each analysis

- Detailed documentation in database (FDM/ARCPlus)

Circuit Analysis Slide 3 of 14

Analyst Qualifications

  • All analysts formally qualified to SNC &

Contractor QUAL CARD for independent work Contractor QUAL CARD for independent work

  • Internalized industry lessons learned on training, qualifications and oversight qualifications, and oversight
  • Procedure and database established to force consistency consistency
  • Maintained awareness of dual use - PRA and NSCA NSCA Circuit Analysis Slide 4 of 14

Governing Criteria

- Initial Work to Rev.1

- Gap analysis performed to Rev. 2 (per Generic RAI 10 and RG 1.205)

- Later work

- Integrated emerging PIRT issues N

dit t k f

ff h

l i

- No credit taken for off-scheme exclusions

- Included Open circuits p

Note: Integrated requirements for conservative, but universal criteria between PRA and NSCA Circuit Analysis Slide 5 of 14

NSCA vs. PRA

  • Implementing Concepts

- 95% of circuit analysis criteria for PRA and NSCA are y

the same

  • Establish single dataset for criteria to assure dual use and better interface between NSCA and PRA better interface between NSCA and PRA
  • Provide procedure and database flexibility to accommodate the 5% difference Long term configuration control extremely difficult if

- Long-term configuration control extremely difficult if redundant data sets are maintained

- Differences primarily handled through:

p y

g

  • Use of Function States
  • Interlock identification and documentation Circuit Analysis Slide 6 of 14

Analysis Methodology

  • All circuit analysis drive by FUNCTION STATES
  • Function States Function States

- Component + Initial State + Desired State

- Permits maximum flexibility to accommodate PRA and NSCA differences (primarily auto signals)

- Minimize false failures up front Effi i t

d l

- Efficient and less error prone

- Consistent with NUREG/CR-6850 methods for Tasks 3 & 9 3 & 9 Circuit Analysis Slide 7 of 14

Analysis Methodology, cont

  • Work package development to facilitate process
  • Single, controlled database (FDM)

Single, controlled database (FDM)

  • Process and techniques based on NRC/EPRI training modules g
  • Major Steps Prerequisites satisfied q
  • Function state established
  • Plant specific rules and conventions
  • General classification
  • General classification
  • Resolve questions Circuit Analysis Slide 8 of 14

Analysis Methodology, cont

  • Major Steps Work Package Development g

p

  • Drawings
  • Supplemental information Cable Selection Cable Selection
  • All scheme cables dispositioned
  • Fault codes applied to all cables
  • Basis documented for excluded cables
  • Selection of required cables with hot probe method
  • Cables generally excluded based only on design features at Cables generally excluded based only on design features at this stage (NUREG/CR-6850 concept)

Circuit Analysis Slide 9 of 14

Analysis Methodology, cont

  • Major Steps Power Supply Identification pp y
  • All Power Supplies identified
  • Required and not-required determined based on Function State requirements State requirements
  • Sensitive to alternate PS lineups and how they are credited Dependencies & Interlocks
  • All circuit interlocks formally dispositioned
  • Equipment dependencies established or off-scheme cables directly incorporated
  • Differentiate auto functions so NSCA and PRA can apply as credited by Basic Event Circuit Analysis Slide 10 of 14

Analysis Methodology, cont

  • Major Steps Documentation
  • Controlled database, with individual analysis originate and check sign-offs
  • Reference drawing Reference drawing
  • Final calculation for circuit analysis and PRA Notebook Circuit Analysis Slide 11 of 14

Circuit Analysis Database Circuit Analysis Slide 12 of 14

Associated Circuits

  • Electrical Coordination

- Consolidated calculation

- Addresses NSCA & PRA

  • Common Enclosure

- Addresses secondary fire concerns

- Addresses loss of DC control power to Switchgear

  • CPT Open Circuits

- Followed PIRT recommendations

  • MHIF Analysis

- Followed NEI 00-01, Appendix B method Circuit Analysis Slide 13 of 14

Q ti

?

Questions ?