MONTHYEARML11203A1132011-07-21021 July 2011 NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539) Project stage: Other ML11207A0532011-08-0909 August 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel. Project stage: Other ML11269A0532011-10-14014 October 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: RAI ML11320A0262011-12-27027 December 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12025A0272012-02-0808 February 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advance W17 High Thermal Performance Fuel (TAC Nos. ME6538 & ME6539) Project stage: RAI ML12088A1702012-03-23023 March 2012 Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1652012-04-26026 April 2012 Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 Project stage: Other ML12125A0282012-05-0202 May 2012 NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition Project stage: Other ML12086A3112012-05-0404 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis Project stage: Other ML12137A2972012-05-15015 May 2012 Response to NRC Fourth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12153A3772012-05-24024 May 2012 Response to NRC Fifth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12138A1582012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 Thermal Performance Fuel Project stage: Other ML12125A1892012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses Project stage: Other ML1218500092012-06-26026 June 2012 Response to NRC Sixth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12178A5642012-07-0505 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12185A0772012-07-0909 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12240A1992012-09-0606 September 2012 PI for Sequoyah 1 and 2- Permit Use of Advanced W17 Htp Fuel (TAC Nos. ME6538/6539) Project stage: Other ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) Project stage: Approval ML13037A1062013-01-31031 January 2013 10 CFR 50.46 - 30-Day Special Report for Sequoyah Nuclear Plant, Unit 2 Regarding Changes to the Calculated Peak Cladding Temperature Emergency Core Cooling System Evaluation Models Project stage: Other CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report2013-11-18018 November 2013 10 CFR 50.46 - Combined Annual and 30-Day Report Project stage: Other 2012-05-24
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22095A0182022-04-0404 April 2022 NRR E-mail Capture - Sequoyah Nuclear Plant - Acceptance of Request for Alternative - Pressure Isolation Valve Leakage ISTC-3630 (L-2022-LLR-0034) ML22125A1422022-03-22022 March 2022 1 and 2 - March 22, 2022 e-mail - Sequoyah TSTF-505 LAR Supplemental Information ML22075A0942022-03-16016 March 2022 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Use of Fire and Seismic PRAs to Modify Approved 10 CFR 50.69 Categorization Process ML22046A2742022-02-15015 February 2022 NRR E-mail Capture - Audit Question (Snsb 02) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22047A0552022-02-15015 February 2022 Annual Water Withdrawal Report 2021 ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22035A0182022-02-0303 February 2022 NRR E-mail Capture - Audit Questions (Eeb follow-up) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21347A9022021-12-13013 December 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Follow-up Report 2021 ML21336A3942021-12-0101 December 2021 NRR E-mail Capture - Audit Questions for Sequoyah Units 1 and 2 - LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML21323A0432021-11-18018 November 2021 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Eliminate the High Negative Flux Rate Trip Requirement ML21252A2152021-09-0909 September 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 2 - Acceptance of Request for Alternative Inspection for Upper Head Injection J-groove Welds (L-2021-LLR-0059) ML21239A0712021-08-27027 August 2021 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2 ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 2024-01-31
[Table view] |
Text
NRR-PMDAPEm Resource From: Green, Daniel [dgreen@tva.gov]
Sent: Thursday, July 21, 2011 3:16 PM To: Lingam, Siva
Subject:
RE: Sequoyah 1 & 2 - LAR Regarding AREVA Advanced W17 HTP Fuel (ME6538/6539)
Attachments: ANP-2986NP-Draft 003.pdf
- Siva, Per our discussion.
Dan Green.
From: Lingam, Siva [1]
Sent: Thursday, July 21, 2011 10:16 AM To: Green, Daniel Cc: Blumberg, Mark
Subject:
Sequoyah 1 & 2 - LAR Regarding AREVA Advanced W17 HTP Fuel (ME6538/6539)
Regarding the subject LAR, ANP-2986 (P), Revision 2, Section 5.2.2.27.3 states the environmental consequences (assumed to be compliance with 10 CFR 50.67 or 10 CFR Part 100 because of text in Section 5.2.2.27) are provided in Section 5.3. We are unable to locate any assessment of the LOCA consequences (doses) in Section 5.3. Please provide us the page of this assessment as early as possible.
Thank you.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL22)
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)
Location: O8D5; Mail Stop: O8G9a Telephone: 3014151564; Fax: 3014151222 Email address: siva.lingam@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 110 Mail Envelope Properties (613F05D32C47CA428E9F2E41630E450E19B8408F)
Subject:
RE: Sequoyah 1 & 2 - LAR Regarding AREVA Advanced W17 HTP Fuel (ME6538/6539)
Sent Date: 7/21/2011 3:16:25 PM Received Date: 7/21/2011 3:17:31 PM From: Green, Daniel Created By: dgreen@tva.gov Recipients:
"Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None Post Office: TVACOCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1019 7/21/2011 3:17:31 PM ANP-2986NP-Draft 003.pdf 527535 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
3 ANP-2986(NP)
Revision 002 Sequoyah HTP Fuel Transition Section 5.2 indicates that the implementation of Adv. W17 HTP fuel assemblies will not adversely affect the predicted results of a non-LOCA accident analyzed in the Sequoyah licensing basis. That is, all acceptance criteria for non-LOCA Condition II, III, and IV events continue to be met and the inputs regarding failed fuel fraction to the dose consequence analyses remain unchanged.
Many of the inputs used in dose consequence analyses - fractional fuel failure, primary to secondary leakage, iodine partitioning - are prescribed by the relevant regulatory guidelines and are independent of fuel type.
Plant-specific inputs such as containment parameters - volume, surface area, atmospheric leakage rates -
and engineered safeguard feature - containment spray, ice condensers, fans - capabilities in the reduction and/or removal of radionuclides are unaffected by the Adv. W17 HTP fuel.
Atmospheric dispersion factors used in environmental consequence analysis is estimated specifically for the plant, is based on local weather information, and is not affected by Adv. W17 HTP fuel.
All of these arguments, taken together, justify the implementation of Adv. W17 HTP Fuel at Sequoyah with respect to existing licensing basis environmental consequence analyses. Continued compliance with the acceptance criteria for the dose events - 10CFR100 offsite dose limits and 10CFR50 General Design Criteria 19 control room habitability requirements are assured.
5.2.2.27.1 Environmental Consequences of a Postulated Loss of A.C. Power to the Plant Auxiliaries (UFSAR 15.5.1)
The fuel cladding damage is not expected following a loss of A.C. power to the plant auxiliaries. The postulated accidents involving release of steam from the secondary system will not result in a release of radioactivity unless there is leakage from the RCS to the secondary system in the steam generator. The primary-to-secondary leak rate primary coolant activity, iodine activity in the secondary side liquid, and iodine partition factor are set by Technical Specification limits and are not affected by fuel design. Also, the steam release to cool the plant is not affected by the fuel design. Since all parameters affecting this event for environmental consequences are not adversely affected by the Adv. W17 HTP fuel, the results of the existing analysis are applicable to the Adv. W17 HTP fuel.
5.2.2.27.2 Environmental Consequences of a Postulated Waste Gas Decay Tank Rupture (UFSAR 15.5.2)
The analysis of this event is performed based on Regulatory Guide 1.24, 1972. The parameters used for the analysis are not affected by the fuel design. The tank activity assumed at the event initiation is conservatively determined based on the reactor coolant system volume. The RCS volume is unaffected by the Adv. W17 HTP fuel, and the assumed tank activity remains bounding. Therefore, an environmental consequences analysis of a postulated waste gas decay tank rupture is not required for the Adv. W17 HTP fuel.
5.2.2.27.3 Environmental Consequences of a Loss of Coolant Accident (UFSAR 15.5.3) The analysis of this event is performed based on Regulatory Guide 1.4.
The parameters used in the environmental consequence analysis are This event is evaluated in Section 5.3 of this document. not affected by the Adv. W17 HTP fuel. The results of the existing analysis remain applicable.
5.2.2.27.4 Environmental Consequences of a Postulated Steam Line Break (UFSAR 15.5.4)
The fuel cladding damage is not expected following a steam line break. The postulated accidents involving release of steam from the secondary system will not result in a release of radioactivity unless there is leakage from the RCS to the secondary system in the steam generator. The primary-to-Page 129 of 144
3 ANP-2986(NP)
Revision 002 Sequoyah HTP Fuel Transition secondary leak rate primary coolant activity, iodine activity in the secondary side liquid, and iodine partition factor are set by Technical Specification limits and are not affected by fuel design. Also, the amount of steam released as a result of a steam line break is not affected by fuel design. The environmental consequences of a steam line break are not adversely affected by the Adv. W17 HTP fuel.
The results of the existing analysis remain applicable.
5.2.2.27.5 Environmental Consequences of a Postulated Steam Generator Tube Rupture (UFSAR 15.5.5)
The fuel cladding damage is not expected following a steam generator tube rupture. The postulated accidents involving release of steam from the secondary system will not result in a release of radioactivity unless there is leakage from the RCS to the secondary system in the steam generator. A conservative analysis of the postulated steam generator tube rupture assumes the loss of offsite power and hence involves the release of steam from the secondary system. A conservative analysis of the potential offsite doses resulting from this accident assuming steam generator leakage prior to the postulated accident for a time sufficient to establish equilibrium specific activity levels in the secondary system. The primary-to-secondary leak rate primary coolant activity, iodine activity in the secondary side liquid, and iodine partition factor are set by Technical Specification limits and are not affected by fuel design. Also, the amount of steam released to cool the plant is not affected by fuel design. The environmental consequences of a steam generator tube rupture are not adversely affected by the Adv. W17 HTP fuel.
The results of the existing analysis remain applicable.
5.2.2.27.6 Environmental Consequences of a Postulated Fuel Handling Accident (UFSAR 15.5.6)
All the parameters used in the environmental consequence analysis are not adversely affected by the Adv. W17 HTP fuel. The key parameters for this event are not impacted by the introduction of Adv. W17 HTP fuel. The fuel rod and fuel pellet materials and design are similar to the current Mark-BW fuel. The fuel burnup limits are also similar to the current Mark-BW fuel. The analyses of the consequences of the event in UFSAR Section 15.5.6 remain applicable. This event is evaluated each cycle as part of the reload licensing process to ensure that the analysis of record remains bounding.
5.2.2.27.7 Environmental Consequences of a Postulated Rod Ejection Accident (UFSAR 15.5.7)
The consequences of a postulated rod ejection accident are bounded by the results of the loss of coolant accident analysis evaluated in Section 5.3. 5.2.2.27.3 5.2.2.28 Event Disposition for Containment Response (UFSAR § 6.2.1.3.3. 6.2.1.3.4, 6.2.1.3.11) 5.2.2.28.1 Event Description The Containment Structure encloses the primary and secondary plant and is the final barrier against the release of significant amounts of radioactive fission products in the event of an accident. The Containment Structure must be capable of withstanding the pressure and temperature conditions resulting from a postulated LOCA or MSLB accident. While other events, such as a feedwater line break also discharge mass and energy to Containment, the LOCA and MSLB have been confirmed to be the two most severe inside containment events with respect to maximizing the peak containment pressure and temperature.
5.2.2.28.2 Key Parameters The key parameters for the containment response are those related to the LOCA and MSLB design basis events.