MONTHYEARCNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2021-08-0505 August 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) Project stage: Request ML21239A0712021-08-27027 August 2021 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2 Project stage: Acceptance Review ML21246A0532021-09-15015 September 2021 Regulatory Audit in Support of Review of the Application to Adopt Risk-Informed Extended Completion Times RITSTF Initiative 4B Project stage: Approval CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01)2021-11-29029 November 2021 Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) Project stage: Request ML21336A3942021-12-0101 December 2021 NRR E-mail Capture - Audit Questions for Sequoyah Units 1 and 2 - LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) Project stage: Approval ML22035A0182022-02-0303 February 2022 NRR E-mail Capture - Audit Questions (Eeb follow-up) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) Project stage: Approval ML22046A2742022-02-15015 February 2022 NRR E-mail Capture - Audit Question (Snsb 02) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) Project stage: Approval ML22125A1422022-03-22022 March 2022 1 and 2 - March 22, 2022 e-mail - Sequoyah TSTF-505 LAR Supplemental Information Project stage: Approval ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b Project stage: Other CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf Project stage: Supplement ML22118A3332022-04-28028 April 2022 Submittal of Sequoyah Nuclear Plant, Units 1 and 2 - Updated Final Safety Analysis Report Amendment 30 Project stage: Request CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) Project stage: Supplement ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 Project stage: RAI CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. Project stage: Response to RAI ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) Project stage: Other ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B Project stage: Approval ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B Project stage: Other 2022-03-22
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22095A0182022-04-0404 April 2022 NRR E-mail Capture - Sequoyah Nuclear Plant - Acceptance of Request for Alternative - Pressure Isolation Valve Leakage ISTC-3630 (L-2022-LLR-0034) ML22125A1422022-03-22022 March 2022 1 and 2 - March 22, 2022 e-mail - Sequoyah TSTF-505 LAR Supplemental Information ML22075A0942022-03-16016 March 2022 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Use of Fire and Seismic PRAs to Modify Approved 10 CFR 50.69 Categorization Process ML22046A2742022-02-15015 February 2022 NRR E-mail Capture - Audit Question (Snsb 02) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22047A0552022-02-15015 February 2022 Annual Water Withdrawal Report 2021 ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22035A0182022-02-0303 February 2022 NRR E-mail Capture - Audit Questions (Eeb follow-up) for Sequoyah Units 1 and 2 LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21347A9022021-12-13013 December 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Follow-up Report 2021 ML21336A3942021-12-0101 December 2021 NRR E-mail Capture - Audit Questions for Sequoyah Units 1 and 2 - LAR to Adopt TSTF-505, Revision 2 (L-2021-LLA-0145) ML21323A0432021-11-18018 November 2021 NRR E-mail Capture - Acceptance Review for Sequoyah Units 1 and 2 - LAR to Eliminate the High Negative Flux Rate Trip Requirement ML21252A2152021-09-0909 September 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 2 - Acceptance of Request for Alternative Inspection for Upper Head Injection J-groove Welds (L-2021-LLR-0059) ML21239A0712021-08-27027 August 2021 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2 ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 2024-01-31
[Table view] |
Text
From: Buckberg, Perry Sent: Thursday, February 3, 2022 2:22 PM To: Taylor, Andrew Charles Cc: Victor, William Ross
Subject:
SQN TSTF-505 Audit Questions - EEEB Follow-up - L-2021-LLA-0145 Attachments: Audit Questions - Sequoyah TSTF-505 EEEB 2-3-2022 L-2021-LLA-0145.pdf
- Andy, The September 15, 2021, Audit Plan (ML21246A053) includes that ..the NRC staff will provide the licensee with audit questions and audit-related requests so that the licensee can better prepare for audit discussions with NRC staff.
We discussed the initial staff questions (ML21336A394) and TVA responses during the January 25- 28, 2022, formal audit meeting Attached are NRC staff follow-up audit questions related to Electrical Engineering. Please post the responses to the Certrec Portal and we can discuss the status after staff review of the responses.
- Thanks, Perry Buckberg Senior Project Manager / Agency 2.206 Petition Coordinator U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation office: (301)415-1383 perry.buckberg@nrc.gov Mail Stop O-8B1a, Washington, DC, 20555-0001
Hearing Identifier: NRR_DRMA Email Number: 1509 Mail Envelope Properties (BLAPR09MB74092D4C8A393F958A5C17F99A289)
Subject:
SQN TSTF-505 Audit Questions - EEEB Follow-up - L-2021-LLA-0145 Sent Date: 2/3/2022 2:21:46 PM Received Date: 2/3/2022 2:21:00 PM From: Buckberg, Perry Created By: Perry.Buckberg@nrc.gov Recipients:
"Victor, William Ross" <wrvictor@tva.gov>
Tracking Status: None "Taylor, Andrew Charles" <actaylor@tva.gov>
Tracking Status: None Post Office: BLAPR09MB7409.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 894 2/3/2022 2:21:00 PM Audit Questions - Sequoyah TSTF-505 EEEB 2-3-2022 L-2021-LLA-0145.pdf 129149 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
AUDIT QUESTIONS FOLLOW-UP - ELECTRICAL ENGINEERING TSTF-505, REVISION 2 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 By license amendment request (LAR) dated August 5, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21039A648, the Tennessee Valley Authority (TVA) requested changes to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specifications (TSs). The proposed changes would modify TS requirements to permit the use of Risk Informed Completion Times with the implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS)
Guidelines.
In preparation for virtual audit meeting held January 25-28, 2022, NRC Electrical Engineering staff requested (1) documentation - one line diagrams (AC distribution and safety-related AC and DC buses) and shared safety-related electrical loads between units; (2) an electrical presentation on normal and emergency lineups employing available offsite sources (Unit Station Service Transformers (USSTs) and Common Station Service Transformers (CSSTRs)) and onsite sources - Emergency Diesel Generators (EDGs); and (3) responses to ten Electrical Engineering audit questions (ADAMS Accession No. ML21336A394) directly related to changes to electrical TSs. TVA responded to the staff requests in part prior to and during the audit meeting. The NRC staff is requesting the information and clarifications identified below.
The staff noted that certain terms (load groups, divisions, trains, and channels) were not consistently used in the proposed LCO changes in the LAR. This is prevalent in LAR Table E1-1 columns 3 and 6 in applying those terms to both units combined. The staff is requesting the following information in relation to original documentation, presentation, and responses to audit question requests:
- 1. Documentation:
- a. Please provide the following on portal:
- i. Shutdown loads on each 6.9 kV and 480 V Shutdown Bus and Unit designator for each.
ii. Procedures to address loss of one and also two 6.9 kV Shutdown Board(s) (in one load group) and corresponding loss of affected 480 V Shutdown Boards.
iii. Procedures for partial LOOP either entire 161 kV switchyard or 500 kV switchyard.
iv. During audit, it was identified that some electrical one-line diagrams on portal were not accessible to EEEB staff with that access again requested.
- 2. Electrical Presentation by TVA on 01-26-22:
- a. Please provide the designated purpose of shutdown utility bus.
- b. Please indicate if for loss of main generator for either unit, the initial offsite source is through its main bank transformer and USST with alternate offsite source being the respective CSSTR and Start Buses.
- i. Please further indicate how transfers are made at CSSTRs, unit boards, and 6.9 kV shutdown boards either automatically or manually.
AUDIT QUESTIONS FOLLOW-UP - ELECTRICAL ENGINEERING TSTF-505, REVISION 2 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2
- c. Please indicate when and why FLEX 6.9 kV and 480 V diesels are used in regard to LCOs in TS Section 3.8 proposed for changes in the LAR.
- d. Please provide access to all slides used during Electrical Presentation
- 3. Audit Questions:
- a. Clarification
- i. Clarify the number of boards per train covered by TS 3.8.9.A, 3.8.9.B ii. TS LCO 3.8.7 require Train A and Train B inverters to be operable. Clarify the number of channels per train in column 3 and ensure consistency between column 3 and 6
- b. Please verify that each electrical LCO proposed for changes in the LAR, especially ones listed below, is in agreement with what is stated in LAR Table E1-1 and also verify that there is agreement between columns 3 and 6 for each of those LCOs in the table.
- i. Please determine if column 6 of LAR Table E1-1 for LCO 3.8.1.A should be revised to refer to minimum offsite sources for one load group (one offsite source per 6.9 kV shutdown board in a load group or some wording equivalent to that.
ii. Please determine if column 3 of LAR Table E1-1 for LCO 3.8.1.B should be revised to refer to load groups so there is consistency between columns 3 and 6.
iii. For LAR Table E1-1 for LCOs 3.8.4.A & B - please determine if the Design Success Criteria (DSC) should be revised to One DC train A (channels I and III) or Train B (channels II and IV)or something equivalent to that.
iv. For LAR Table E1-1 for LCOs 3.8.7.A - please determine if the DSC should be revised to Two inverters for channels (I and III or II and IV) for RPS and ESFAS initiation or something equivalent to that.
- v. For LAR Table E1-1 for LCOs 3.8.9.C - please determine if the DSC should be revised to indicate One train of vital DC electrical power distribution (two 125 V DC boards (I and III or II and IV) or something equivalent to that.