E-mail from D. Orr of NRC to D. Holody and M. Gray of NRC, Regarding Hub Visit
ML060660148
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 05/14/2004
From: Dan Orr
NRC Region 1
To: Mel Gray, Holody D
NRC Region 1
References
FOIA/PA-2005-0194
Download: ML060660148 (24)


Text

Visit Hub Vi-sit Page 1I Pniel Hlody I Q(:-niel Holody -Hub

- ,P~age001 Low- _ I I. A I From: Daniel Orr B To: Daniel Holody; Mel Gray Date: 5/14/04 2:34PM

Subject:

Hub Visit I made some changes to the schedule. Please see attached. I have also requested to PSEG the interviewees listed on the schedule. My thoughts on the individuals is that we have not fonnally sat down in interviews with the key individuals at the manager and senior manager level. I also believe that Mike Brothers has not yet had that opportunity with Hub. The last time we did this, nearly a year ago, the players were all different or in different roles. It is also important to hear what they have to say about progress towards improving the safety culture. My experience with Hub is to have an org chart available to him during the site visit pre brief and he requests lots of last minute changes. Then it is a scramble to PSEG to request the changes.

On the in-field interviews I was thinking that we could list 12 key plant functional groups that were outliers by the Synergy survey. The synopsis that Mel and I did several weeks ago, available on the g drive, could be used to identify those groups. Those twelve functional groups would be listed where I have inserted "Location."

For changes to the schedule, please continue to work off the g drive so that we all reference the correct rev.

Mel, I made the interview requests to Howard Berrick, would you please continue to work with him next week. I informed Howard that he should contact you on the interview schedule.

Thanks.

Dan 0 CC: George Malone; Marc Ferdas; Scott Barber

Page 1 I pDaniel Hood IDaniel Holody - Salem-HC-MillerVisit-52404.wpd Sae-CMillerVsist-52404.wpd Page 1 1 SALEM/HOPE CREEK SITE VISIT MONDAY (5124104)

Objective NRC Region I Senior Managers to review with Resident Inspectors current overall PSEG performance, particularly as it relates to safety culture, equipment reliability, and human performance. The site visit will also include in-field interviews with Hope Creek and Salem personnel and afternoon scheduled interviews with management and senior site leadership.

7:45 Hub/Randy/Dan Arrive 7:45 - 8:45 SCWE Update Resident Inspector Office Performance Themes - Recent Insights 8:45 - 11:30 Field Interviews HJM ARB DJH Location Location Location Location Location Location Location Location Location Location Location Location 11:30 - 12:30 Working Lunch/Caucus Resident Inspector Office 12:30 - 4:30 HJM ARB DJH (Location) (Location) (Location) 12:30-1:30 Neil Bergh Jim Hutton Carl Fricker 1:30-2:30 IAT Member (or Walsh)Greg Sosson Greg Halnon 2:30-3:30 John Carlin Pete Tocci Bill Campbell 3:30-4:30 Mike Brothers Len Rajkowski Abdy Khanpour 5:15 - 6:15 Hub & Randy debrief with Roy Anderson Location 6:15 Depart Site

survey review.wpd Page 1I Daniel Holody I DanilHooy - Synergy yergysrvyreiw9p Page 1 1

1. EXECUTIVE

SUMMARY

Background

PSEG percentile comparisons against 21 nuclear sites assessed within the last 2 years by Synergy.

PSEG commissioned Synergy in December 2003 to perform a Comprehensive Cultural' Assessment (CCA). The CCA was to assess and monitor attitudes, culture, and performance and establish a baseline going forward.

Initial Environmental Conditions

  • 3 week period to complete survey in December 2003.
  • March 2003 new president and CNO arrives. Old CNO had been in place for five years.
  • July - Sep 2003
  • Major restructuring from a horizontal to a more traditional vertical organization.

Roles and responsibilities of each VP changed.

  • Plant managers identified.
  • All non-union employees go through selection/bidding process.
  • Approximately 100 non-union personnel laid off.
  • November 2003, PSEG announces craft downsizing and expects about 100 union workers let go.
  • December 2003, Synergy survey starts four days after completing a Salem Unit 2 45 day outage.
  • New site performance metrics not yet available to organization prior to survey.

Purpose Three categories.

  • Nuclear Safety Culture (NSC). Includes three sub-categories.
  • Nuclear Safety Cultural Values, Attitudes, Behaviors and Practices (NSC V,B&P) that have shaped and reinforced organization's capabilities, infrastructure, and environment for nuclear safety performance.
  • General Cultural Work Environment (GCWE). Assessment of general culture, environmental and programmatic areas that affect organizational performance and may have an inter-dependent relationship with NSC.
  • Leadership, Management and Supervision (LMS). Leadership behaviors and practices.

Business/Resource management behaviors and practices. Personnel management behaviors and practices.

Approach to Survey All PSEG and long-term contractors afforded opportunity to respond. CCA outputs are designed 1

I Daniel tiolody - Synergy survey review.wpa Page 2I Uanel-Iooy-snrysre eiwwarg to support future interactions between management and employees to jointly develop solutions for any identified needs for cultural or performance improvements.

Sources of Input 168 multiple choice questions.

NSC has 74 questions 45 for NSC V,B&P 19 for SCWE 10 for ECP GCWE has 41 questions, some similar with NSC LMS has 53 questions.

2 write in questions/responses available to all respondents.

Synergy notes that the write-in responses are useful in determining underlying reasons for lower rating provided by targeted functional organization outliers.

Multiple choice questions are generally designed as positive statements to which respondents provide rated degree of agreement or disagreement. Scale of 1 to 5 with 3 as the anchor or midpoint.

1 is inadequate or strongly disagree 2 is less than adequate or disagree 3 is adequate or generally agree 4 is very good or strongly agree 5 is excellent or fully agree.

Forty question sets for various sub-parts.

Synergy calculated a composite cultural indicator (CCI) for NSC, GCWE, or LMS, dimensions (such as SCWE under NSC), sub-dimensions (such as Indicators and Precursors of a Potential Chilled Work Environment under SCWE), and individual questions. The CCI was the mean of all numerical responses to a particular question or set of questions. CCI's were provided with numerous sorts by functional organization.

High percentage of negative responses provide an indication of stratification. Synergy graphically illustrated percentage of negative responses by black diamonds.

1 Black diamond for >10% in NSC or >20% in GCWE or LMS 2 Black diamonds for >15% in NSC or >30% in GCWE or LMS 3 Black diamonds for >20% in NSC or >40% in GCWE or LMS Negative responses were provided with each CCI.

Survey Participation 2

~-I Page 31 I Dnel Holod - Synergy survey _eviwHwp I Daniel Holody - Synergy survey review.wpd Page3

  • 2003 CCA survey response rate was 67.2% overall.
  • Industry average is 77% for Synergy surveys.
  • Functional organizations at <40% participation are considered low responding.
  • Organizational affiliation was 97% provided, which is consistent with Synergy's experience.
  • 36% survey respondents provided write-in responses, which is also consistent with Synergy's experience. The responses were generally constructive in nature, but not necessarily positive.
  • See section IlIl. for participation rates of various functional organizations.

Overall Conclusions Mean range label designations

< 2.50 significantly less than adequate 2.50 - 2.84 less than adequate 2.85 - 2.99 nominally less than adequate 3.00 - 3.15 nominally adequate 3.16 - 3.30 adequate 3.31 - 3.50 adequate to good 3.51 - 3.70 good 3.71 - 3.90 good to very good 3.91 - 4.20 very good 4.21 - 4.50 very good to excellent

> 4.50 excellent Synergy's Issue Identification Criteria Numerical thresholds represent industry standards as interpreted by Synergy. Synergy used the following thresholds for identifying whether a dimension, sub-dimension, or question response was outside "the norm."

Nuclear Safety Culture (NSC): Dimension, sub-dimension, or question with a mean value rating

< 3.50 or a negative response pocket > 10/15%

General Culture and Work Environment (GCWE): Dimension, sub-dimension, or question with a mean value rating < 3.50 LMS Behaviors and Practices: Dimension, sub-dimension, or question with a mean value rating

< 3.15 Significant recurring themes from write-in comments.

Significant deviations from industry norms.

Industry norms verses PSEG results by dimension:

3

.

- Synergy survey review.wpd Page 41 I

L --Daniel Holody

.......... - - ~- 11111 1 . .

1. Nuclear Safety Culture CCI industry norm = 4.00 PSEG = 3.73 "Good to Very Good" 1j percentile
2. NSVB&P Dimension of NSC:

industry norm = 3.88 PSEG = 3.54 "Good" 11'1 percentile

3. Overall SCWE Dimension of NSC:

industry norm = 4.40 PSEG = 4.31 "Very Good to Excellent" 11h percentile

4. SCWE sub-dimension - indicators and precursors:

industry norm = 4.28 PSEG = 4.17 'Very Good" 16'h percentile

5. SCWE sub-dimension - demonstrated willingness to act:

industry norm = 4.5 PSEG = 4.45 'Very Good to Excellent" 16th percentile

6. ECP Dimension of No industry norm = 3.57 PSEG = 3.41 "Adequate to Good" 16"h percentile
7. GCWS CCI industry norm = 3.5 PSEG = 3.4 "Adequate to Good" 26"h percentile
8. LMS CCI industry norm = 3.35 PSEG = 3.32 "Adequate to Good" 3 3rd percentile
9. CAP Effectiveness: (identified as "other" dimension, not with the major three NSC, GCWS, LMS)

Industry norm = 3.68 PSEG = 3.24 11"a percentile 4

I Daniel Holody - Synergy survey review.wpd Page 5 1 an s Overall Conclusion for Nuclear Safety Culture Employee concerns regarding plant equipment and material condition as manifested by longstanding or recurrent equipment problems, work- arounds, and compensatory measures resulted in lower ratings in several NS VB&P sub-dimensions. Employee ratings of CAP were particularly low. This is S;ynergy's

  1. 1 major key issue and opportunity for improvement at PSEG. This key issue shows itself in any number of concerned areas identified by the CCA.
  • Several, seven, individual functional organizations provided significantly lower ratings of one or more key attributes of SCWE. The negative response rate listed is for the Indicators and Precursors of a Potential Chilled Work Environment CCI. Priority level 2 or 3 was determined based on a composite review of all the SCWE results.
  • 3 were priority level 2 (potential need for remedial action in near term).

-Facilities - yard/nuclear workers 19% Negative response rate

-Salem Rad Pro 21%

-Hope Creek Chemistry 19%

  • 4 were priority level 3 (potential need for further evaluation of underlying causes).

-Work control - on-line/cycle 24% Negative response rate

-Salem Chemistry 20%

-Hope Creek Shift Ops 18%

-Salem Mech Maint 21%

  • Employee confidence in the ECP is need of improvement. Particular functional organizations with overall ECP CCI is listed.

Salem Chemistry 2.74 HC Shift Ops 2.63 On-line/cycle maintenance 2.83 Salem Rad Pro 2.92 Salem Mech Maintenance 2.81 HC Chemistry 2.80 HC Mech Maintenance 3.00 Salem 12 hr/WIN 3.17 Salem Shift Ops 3.12 HC 12 Hr/WIN 3.10 Other Training 3.18 HC Electrical/l&C 3.01 Salem Other Maintenance 3.17 Overall Conclusions for GCWE

  • Employee concerns regarding plant equipment and material condition as manifested by long-standing or recurrent equipment problems, work-arounds, and compensatory measures affected ratings in several GCWE dimensions including aHigh Standards and 'Conduct of Work."

5

-

I aie old Syerg isure-eve Page b I I Daniel Holody Synergy survey revlew.wpd

-

Page 61

  • GCWE areas with lowest ratings:

Effectiveness of Work Management (particularly in the area of Maintenance Planning and Scheduling Process) 2.53 General Communications 2.83 Change Management 2.87 Performance Recognition 2.87 Performance Appraisal 3.07 CCls <3.15 indicate a need for improvement.

CCIs <3.00 indicate a significant need for improvement Overall Conclusions LMS

  • LMS CCI was 3.32, 33rd percentile. Consists of:

Leadership Business and Practices, 3.19, 11th percentile Business/Resources Management Behaviors and Practices, 3.18, 11th percentile Personnel Management Behaviors and Practices, 3.51, 44th percentile

  • Employee concerns regarding plant equipment and material conditions as manifested by long-standing and recurrent equipment problems, work- arounds, and compensatory measures affected ratings In several LMS sub -dimensions, including Confidence in Management,, Management of Resources, and Management of Systems and Prccesses.'
  • Additional LMS areas with low ratings include:

Effectiveness of Leadership in Establishing and Implementing Strategies; and Plans and in Providing Clear Direction for Organizational Issues Effectiveness of Management Change 6

I Daniel Holody - synergy survey review.wpa Frage 7 o_

.e.I..... suvyrvewwarg II. ASSESSMENT METHODOLOGY

  • Generally the respondents completed the questionnaire anonymously during group meetings. However, opportunities were available at the individuals discretion.
  • Trends. First CCA survey provided by Synergy. Trend limited to seven survey questions that request responses based on "today" and "a year ago."
  • Percentile was calculated based on 21 Synergy site surveys performed within the last 2 years.
  • Survey and questionnaire and associated write-in comments were complimentary in establishing a high degree of confidence that important issues were identified as these apply to PSEG Nuclear-wide and to specific PSEG Nuclear major organizations and sub-organizations. The information obtained has been integrated in the development of key findings, opportunities for improvement and conclusions.

7

IDLaniel H010ody - Synergy survey review.wpa Page Es rage bi I Uaniel 1-lolody Synergy survey review.wpa

- - .. .--'--.-----..,

III. SURVEY PARTICIPATION Site Ops 60% 877/1464 Engineering and Tech Support 81% 309/381 Nuclear Assessment 96% 63/66 Business Support Organization 59% 89/151 CNO Staff and Support 80% 12/15 Composite 67.2%(Industry norm 77%) 1395/2077 PSEG Employees 72.3%

PSEG Contractors 26.0%

PSEG Union 55.6%

Organizational affiliation provided by 97% (Consistent with Industry norm)

Write-in comments provided by 36% (Consistent with Industry norm)

Low responding organizations (Defined as less than 40% participation)

Other Facilities 18%

Other Station Support 21%

HC Electrical/I&C 26%

Salem Mechanical Maintenance 26%

Salem 12Hr/WIN 29%

Salem Electrical/I&C 32%

Salem Other Operations 36%

HC Other Operations 37%

Security 37%

Supply Chain Organizations 38%

Reason for lower participation is not clearly identified.

8

survey review.wpa synergy survey HOIOdY - Synergy rage I uaniel IFL.Daniel Holody -

review.wpa Page 9I

. .. ... _..._..._ _.._._.....

IV. KEY NSC RESULTS NS V,B&P

  • Six sub-dimensions Nuclear Safety Is Our Top Priority 3.59 Operational Nuclear Safety 3.63 Identification of Potential Nuclear Safety Issues 3.62 Timely Resolution of Identified NS Issues 3.35 Effective Resolution of Identified NS Issues 3.27 Continuous Improvement of NS Performance 3.71 CCls <3.50 indicate a need for improvement.

CCIs <3.30 indicate a significant need for improvement

  • Employee concerns regarding plant equipment and material condition as manifested by longstanding or recurrent equipment problems, work- arounds, and compensatory measures resulted in lower ratings In several NS V,B&P sub-dimensions. Employee ratings of CAP were particularly low.

DETAILED ANALYSIS OF THE SCWE SCWE, Two Sub-Dimensions:

Indicators and Precursors of a Potentially Chilled Work Environment Demonstrated Willingness to Take Appropriate Action

-Willingness to Inform/Document Rating

-Willingness to Escalate Rating Criteria for SCWE Light Green Yellow Red Overall SCWE <4.00 >3.80 <3.60

>10% negative >15% negative SCWE l&P N/A <3.70 <3.50

>15% negative >20% negative Willingness to N/A <4.25 <4.00 Inform/Document >5% negative >10% negative Willingness to N/A <3.90 <3.70 Escalate >10% negative >15% negative 9

Synergy survey review.wpd Page lOt a~ne Holody I Daniel ooy-Snerysuvyriew

-

Page10 Highlights

  • 20% Negative responses were provided for having known someone that had a negative reactions from management for having raised a concern.

-Industry median - 14%

  • 15% Negative responses were provided for having a concern about receiving a negative reaction from management.

-Industry median - 12%

  • 14% of survey respondents indicate that concerns about being viewed as uncooperative, as a complainer or as a source who is resistant to change were having an adverse impact on their willingness to identify/pursue resolution of potential nuclear safety issue.

- Industry median - 12%

- 1 organization up to 39%, 5 organizations > 25%

  • 8% in past year, received negative reaction for nuclear safety issue.

- Industry median - 5.6%

- I organization at 27%

- 9 organizations >25%

Supervisors and management in my functional organization value workers who identify and pursue resolution of potential nuclear safety issues.

- 3.79 CCI mean response

- industry median = 4.02

- organization lowest was 3.17

- 12 organizations <3.60 10

I Da-niel Holody - Synergy survey review.wpd Page 11 I

_ I Table 13.1 - Functional Oroanizations With Low SCWE Ratinas Organization Overall SCWE Overall I&P Willingness to Willingness to Rating Rating Inform! Escalatel Rating Document

____ ____ ___ _ _Rating Facilities - Yard/ (Yellow) (Yellow) (Red) (Yellow)

Nuclear Worker 3.79 3.67' 3.96 3.77 13% negative 19%xi negative 6%negative 11% negative Salem Rad Pro (Red) (Red) (Yellow) (Red) 3.83 3.66 4.12 3.65 16% negative 21%0, negative 8% negative 22% negative Work Control - (Light Green) (Yellow) (Yellow)

Online/Cycle 3.98 3.99 4.04 3.82 Maintenance 12% negative HC Shift 4.01 (Yellow) (Yellow)

Operations 10% negative 3.69 3.82 18%X) negative 8% negative Salem (Yellow) (Red) __

Mechanical 4.01 3.72 Maintenance 11 % negative 21 %X, negative HC Chemistry (Yellow) (Yellow) (Yellow) (Red) 4.03 3.82 4.33 3.94 190% negative 8% negative 21% negative ETS - Fuels/!___ (Yellow)

Reactor Eng. 3.88 11 % negative Facilities - __ _ (Yellow)

House/Custodial 3.88 4% negative HC Other Ops. ___ __ (Yellow) 4.00 14% negative Salem Other ___ (Yellow)

Maintenance 4.11 11 % negative ETS - Programs __ _ (Yellow) 4.06 14% negative 11

I Daniel Holodv - Synergy survey review.WPCd Danie elwwdPg Page ~12Iaoov-Sn It should be noted that there are several, seven individual functional organizations that provided significantly lower ratings cf one or more key attributes of SCWE.

  • 3 were priority level 2 (potential need for remedial action in near term).

-Facilities - yard/nuclear workers

-Salem Rad Pro

-Hope Creek Chemistry

  • 4 were priority level 3 (potential need for further evaluation of underlying causes).

-Work control - on-line/cycle

-Hope Creek Shift Ops

-Salem Mech Maint ECP Three sub-dimensions:

Acceptable Alternative Path CCI 3.51 Overall Confidence Rating CCI 3.27 Bases for Confidence CCI 3.43

  • It should be noted that employee confidence in the ECP needs improvement.

Particularly the case for:

Salem Chemistry 2.74 HC Shift Ops 2.63 On-line/cycle maintenance 2.83 Salem Rad Pro 2.92 Salem Mech Maintenance 2.81 HC Chemistry 2.80 HC Mech Maintenance 2.81 Salem 12 hr/WIN 2.80 Salem Shift Ops 3.12 HC 12 Hr/WIN 3.10 Other Training 3.18 HC Electrical/l&C 3.01 Salem Other Maintenance 3.17 NSC Areas of Relative Strength

  • For NS V,B&P, Nuclear safety is the first and overriding priority at our site. CCI 4.09/Negative RR 4%

Four other similar questions were considered relative strengths and included:

At our site, we conduct operations, maintenance and modifications in accordance with the design bases. 3.91/ Negative response rate 2%

Lack of prior responsiveness by my supervisor is not having an adverse impact on my willingness to identify and pursue resolution of potential nuclear safety issues or concems. 3.86/Negative response rate 8%. NRC comment: interesting to note that as a relative strength, this question also identified weak outliers.

12

review.wpd survey review.wpd Page 131 I Daniel Holody Synergy survey Dane Hly-Syneg

- Page 131

  • For SCWE, If I identified a potential nuclear safety issue or concern (including a degraded condition that could adversely affect nuclear safety) I would inform my supervision and or document the issue or concem. 4.55/Negative response rate 0.8%

NRC comment: interesting to note that this may have been the question with the least negative response rate. This was validated on some level but not total certainty.

  • Two other similar questions were considered relative strengths.

NSC Areas of Relative Weakness For NS V,B&P, I am confident that the CAP will ensure that potential nuclear safety problems are addressed in a timely manner. CCI 2.95/Negative RR 31%

  • Nine other similar questions responded at less than 3.30 CCI, significant need for improvement.
  • Eleven other similar questions responded at less than 3.50 CCI, need for improvement.

For ECP, I am confident that issues or concerns reported through the ECP will be appropriately resolved. CCI 3.26, Negative RR 22%.

  • Two other similar questions responded at less than 3.30 CCI, significant need for improvement.
  • Four other similar questions responded at less than 3.50 CCI, need for improvernent.
  • For SCWE related survey questions at <3.80 (note the higher threshold) and/or negative response rates at >10%:

SEE DETAILED ANALYSIS OF SCWE UNDER SECTION IV ON PAGE 4.

13

uanie uvyrviwwrg 214,1

_ooy-snrg I Djaniel Holody - synergy survey review.wpa Page 141 V. KEY GCWE RESULTS 13 Sub-dimensions, 1 below 3.15 CCI, indicating a need for improvement Performance Appraisal 3 below 3.00 CCI, indicating a need for significant improvement.

General Communications Change Management Performance Recognition GCWE Areas of Relative Weakness

  • Within my functional area, we have an effective work management process. CCI 2.53/Negative RR 51%. Interesting to note that this was the area or question that received the highest negative response rate for the entire survey.
  • Seven other questions responded al: less than 3.00 CCI.
  • Five other questions responded at less than 3.15 CCI.

14

Paae 151 LaideMl noiuuy

  • I uriii survey rvIew.wpu synergy survey r1oloy -- yrirgy review.wpu Pame 15 1 VI. KEY LMS B&P RESULTS LMS CCI 3.32/33rd percentile.

3 Sub-dimensions, includes 14 areas LB&P CCI 3.19/11th percentile Business/Resources Management B&P CCI 3.18/11th percentile Personnel Management Behaviors and Practices CCI 3.51/44th percentile 2 Areas needing improvement, CCI1:3.15 Manage Resources (CCI 3.09)

Manage Systems and Processes (CCI 3.02) 1 Area needing significant improvement, CCI<3.00 Manage Change (CCI 2.95)

LMS Areas of Relative Weakness

  • Our site management team is sufflciently visible and accessible to employees. CCI 2.72/Negative RR 41 %.
  • Eight other questions and focused on senior site management responded at less than 3.00 CCI.
  • Eight other questions and focused on supervision and management responded at less than 3.15 CCI.

15

Page 16 Ij D'aniel Holody - Synergy Dapiel Holody - survey review.wpd Sy'nergy survey review.wpd Pag'e 1610 VII. FUNCTIONAL ORGANIZATION ANALYSIS Functional Organizations with Relatively High Ratings for NSC, NSVB&P, SCWE, and/or ECP (High ratings = >3.92 NSC overall, >3.72 NSVB&P, >4.53 SCWE, and >3.59 ECP)

Engineering Services/Document Control Human Resources CNO Staff and Support IT Other Nuclear Assessment Financial Field Engineering Salem Other Operations Security (Overall NSC, and ECP only)

Learning Services ET&S Projects Nuclear Licensing Technical Training HC System Engineering EP Station Support QA (Only for SCWE)

Refuel Outage (Only for ECP)

Fire Protection (Only for ECP)

Maintenance Planning (Only for ECP)

Functional Organizations with Relatively Low Ratings for NSC, NSVB&P, SCWE, and/or ECP (Low Ratings =<3.54 overall NSC, <3.36 NSVB&P, <4.10 SCWE, and <3.18 ECP)

Overall NSC CCI Salem Chemistry 3.20 HC Shift Operations 3.27 On-Line/Cycle Maintenance 3.28 Salem Rad Pro 3.28 Salem Mechanical Maintenance 3.29 HC Chemistry 3.34 HC Mechanical Maintenance 3.42 Salem 12Hr/WIN 3.45 Yard/Nuclear Worker 3.52 Salem Shift Operations 3.53 HC 12 Hr/WIN 3.54 HC Rad Pro (Only for NSVB&P)

Other Training Organization (Only for NSVB&P and ECP)

Warehouse (Only for SCWE)

HC Electrical/l&C Maintenance (Only for SCWE and ECP)

SMART/Custodial/HVAC (Only for SCWE)

Salem Other Maintenance (Only for ECP) 16

uanieZ 00oy - bynergy survey

_: revaew.wpa _ g_ 17 age 17

W.= e..-..I-1 Daqniel tiolodly - Synergy survey review.wpa . _- Page 18 I

'l. .........

.. .I... . - . ..........

-. - . ....

Functional Organizations with Relatively Low Ratings for GCWE and IMS Interesting enough, both high and low rating organizations for GCWE and LMS almost identically lineup with the orders for NSC high or low as appropriate, NRC observation.

18

survey review.wpa synergy survey rage 'i'i IDaniel Holody - Synergy I Daniel HoloaY -

review-wpa Page 19I VIII. PSEG NUCLEAR "TARGETED" ORGANIZATIONS BASED ON 2003 CCA RESULTS.

Synergy provides a 2-step methodology.

1)Recommended investigative or remedial actions to address a targeted organization's failure to meet industry norm of acceptability.

2)Suggested actions to seek continued improvement in a targeted organization that meets industry norm but is a relative outlier with respect to PSEG Nuclear's general performance norms.

Relative priorities are also identified.

Synergy used:

1)low absolute or relative NSC, SCVVE, GCWE or LMS ratings.

2)High absolute or relative negative response rates.

Results All but one targeted organization (supply chain) are part of the site operations organization.

Also almost all of Salem Plant Manager and Hope Creek Plant Manager are targeted.

Industry Norms Criteria by NSC Priority I or GCWE Priority 1 Salem Chemistry HC Shift Operations Online/Cycle Maintenance Salem Rad Pro Salem Mechanical Maintenance Hope Creek Chemistry Salem 12 hr/Win Industry Norms Criteria by LMS Priority 1 HC Operations HC Mechanical Maintenance Salem Plant Manager Ops (Ops, chem, and RP)

Salem Maintenance Salem Shift Ops HC 12Hr/WIN HC Maintenance PSEG Norms Criteria HC Plant Manager Organizations (Ops, chern, and RP)

Yard/Nuclear Workers Salem Shift Operations HC Maintenance 19

F. V_

I i

Daniel Holody

_-

- byriergy survey review.wpa

-

P~age 20 II IX. OPPORTUNITIES FOR IMPROVEMENT

  • The major key issue and opportunity for improvement is:

Plant equipment and the material condition of the plants are perceived to be In a degraded condition as manifested by long-standing or recurring equipment problems, work-arounds, and compensatory measures. This situation is perceived to be worsening.

Six sub-issues:

  • Management commitment to resources
  • Improving CAP effectiveness
  • Improving effectiveness of maintenance planning and scheduling processes
  • Improving effectiveness of engineering work management and control
  • Improving effectiveness of the maintenance organizations
  • Establishing increased individual ownership
  • Other priority level I opportunities for improvement include:
  • Increased emphasis on senior management expectations with respect to receptivity and sensitivity to nuclear safety concerns.
  • Improve management communications on bases of key operational decisions
  • Establish and communicate an enduing vision for PSEG Nuclear
  • Establish a more effective and productive relationship between management and union
  • Effectively implement defined strategies and plans to attain organizational vision over time
  • Establish an organizational philosophy that emphasizes and support doing things right for the right reasons and right the first time
  • Ensure management responsiveness to the results and obtain employee feedback obtained from this survey/assessment
  • Priority level 2 opportunities:

12 including: Take actions to improve employee confidence in the ECP, particularly in those organizations that provided low ratings.

  • 6 Priority level 3 opportunities.
  • Priority level 4 opportunity:

Improve the effectiveness of line organization self-assessment activities. Ensure that value is place on substance rather than form.

  • Major key Issue is believed to also be driving lower survey numbers In a number of topical areas.

20

IlDaniel Holody - Synergy survey review.wpa Page 21 I I Du Low ratings of trust and confidence in senior management. Many employees believe that senior management is not sufficiently committed to effectively resolving long-standing equipment problems or to investing in the long-term future of the plants.

CAP. Many employees believe that the CAP is ineffective or broken based on the results that it is (or is not) producing, particularly equipment problems. Also a concern that the current low level of confidence in CAP may be having some degree of adverse impact on individual willingness to continue to use thi system.

Maintenance work planning and schedule process. Not producing results, especially equipment problems and to a lesser extent implementation of the PM program.

Adverse Impacts of workload. Ineffective prioritization and management by "due date" or "schedule adherence" is adversely affecting ability to carry out their work effectively. Some indicate a "vicious cycle" syndrome exists. Failure to fix first time results in emergent/recurrent problems that then affects ability to effectively resolve the problems currently on their platter.

Low ratings of business management skill, behaviors, and practices. Many feel focus is on processes versus whether or not process being implemented in a manner to achieve results.

Effectiveness of Maintenance Organization. In summary, maintenance personnel are genuinely concerned about the effectiveness of their organizations performance and have offered suggestions for improvement.

Ownership of identified problems with plant equipment. Many feel that increase individual ownership and accountability is a key ingredient to ensuring success.

Related Nuclear Safety Values, B&P. Many employees correlate the current situation (i.e. with respect to timely and effective resolution of equipment problems and maintenance of plant material condition) with a reduction in the organization's respect for Nuclear Safety as its Top Priority.

21

j Davniel Holody - Synergy survey review.wpa Page 22 2 I

_

Da.e.o.d yerg .. survey.e.....g X. OTHER

  • Worst area by negative response rate (51.07%) was: Within my functional organization we have an effective work management process.
  • Best area by negative response rate (0.8%) was: If I identified a potential nuclear safety issue or concern (including a degraded condition that could adversely affect nuclear safety) I would inform my supervisor, and /or document the issue or concern. This is a NRC observation that was not explicitly described as the area with the least negative response rate by Synergy.
  • PSEG respondent write-in comments only included a single reference by one individual to a plant event for a SCWE issue. This is a Synergy outlier for plants that have! similar large negative pockets for SCWE concerns.

22