|
---|
Category:Meeting Agenda
MONTHYEARML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project PMNS20240996, Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate2024-08-0202 August 2024 Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate PMNS20240187, Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request to Change Surveillance Frequency from 18 Months to 24 Months2024-02-13013 February 2024 Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request to Change Surveillance Frequency from 18 Months to 24 Months PMNS20240186, Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request for Improved Technical Specification Conversion2024-02-13013 February 2024 Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request for Improved Technical Specification Conversion PMNS20231157, Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig2023-10-10010 October 2023 Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig PMNS20231042, Closed Meeting with PSEG Nuclear, LLC (PSEG) and Westinghouse Electric Company (Westinghouse) to Discuss Cobalt-60 Production at Salem Nuclear Generating Station (Salem)2023-09-14014 September 2023 Closed Meeting with PSEG Nuclear, LLC (PSEG) and Westinghouse Electric Company (Westinghouse) to Discuss Cobalt-60 Production at Salem Nuclear Generating Station (Salem) PMNS20230612, Pre-submittal Meeting with PSEG to Discuss the Amendment to Reduce Sites Exclusion Area Boundary2023-05-10010 May 2023 Pre-submittal Meeting with PSEG to Discuss the Amendment to Reduce Sites Exclusion Area Boundary ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) PMNS20221135, Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site2022-11-0303 November 2022 Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site PMNS20220509, Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss a License Amendment Request Regarding Emergency Diesel Generator Allowed Outage Time for Salem Nuclear Generating Station, Units 1 and 22022-05-10010 May 2022 Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss a License Amendment Request Regarding Emergency Diesel Generator Allowed Outage Time for Salem Nuclear Generating Station, Units 1 and 2 PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210302, Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Plans and Details of Upcoming License Amendment Request Regarding Changes to the Ultimate Heat Sink Technical Specifications for Hope Creek2021-03-17017 March 2021 Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Plans and Details of Upcoming License Amendment Request Regarding Changes to the Ultimate Heat Sink Technical Specifications for Hope Creek PMNS20210173, Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss Relief Requests to Adopt Code Cases N-878, N-879, and N-880 for Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 22021-02-18018 February 2021 Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss Relief Requests to Adopt Code Cases N-878, N-879, and N-880 for Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2 ML20287A2472020-10-13013 October 2020 Pre-submittal Teleconference Regarding Proposed Licensing Approach to Install the General Electric Numac Wide Range Neutron Monitoring System for Hope Creek Generating Station ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML15015A6772015-01-16016 January 2015 Forthcoming Closed Meeting with PSEG Nuclear, LLC, Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 ML13246A1232013-08-29029 August 2013 8/29/13 Ltr to Mr. Denight Participation in Commission Meeting on Flooding and Other Extreme Weather Events ML13233A1132013-08-22022 August 2013 Notice of Forthcoming Meeting with PSEG Nuclear, LLC Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 ML12314A1572012-11-14014 November 2012 Notice of Forthcoming Meeting with PSEG Nuclear, LLC, Regarding Final Supplemental Reponse to Generic Letter 2004-02 for Salem Generating Station, Units 1 and 2 ML12229A2402012-08-15015 August 2012 Closed Notice of Meeting for Salem and Hope Creek Nuclear Generating Station Scheduled for August 31, 2012 ML12013A1002012-01-13013 January 2012 Notice of Closed Meeting with PSEG Nuclear, LLC, Salem and Hope Creek, to Discuss a Potentially Greater than Green Security Related Finding ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1123511452011-08-24024 August 2011 Forthcoming Meeting with PSEG Nuclear LLC (PSEG) to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1111703172011-04-27027 April 2011 Notice of Public Meeting - Salem Nuclear Generating Station and Hope Creek Generating Station ML1029500062010-10-28028 October 2010 11/17/10 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Hope Creek Generating Station and Salem Nuclear Generating Station Units 1 and 2 ML1022305122010-08-18018 August 2010 08/04/10 Summary of Telephone Conference Call Held on Between NRC and PSEG Nuclear, LLC, Concerning Drais Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1015405252010-06-0808 June 2010 Notice of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 ML1012412182010-05-0606 May 2010 Public Meeting with Salem-Hope Creek to Discuss PSEG Nuclear, Llc'S Plans for Movement of Spent Fuel from Salem Nuclear Generating Station to the Independent Spent Fuel Storage Installation That It Shares with Hope Creek Generating Station ML1008103452010-03-22022 March 2010 Notice of Public Meeting: Annual Assessment Meeting with PSEG ML1003411882010-02-17017 February 2010 Notice of Forthcoming Meeting with PSEG Nuclear LLC (PSEG) Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0934405582009-12-10010 December 2009 Notice of Closed Meeting with PSEG Nuclear LLC (PSEG) to Discuss Exemption from Schedular Requirements of 10 CFR 73.55 for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0928706352009-10-23023 October 2009 11/05/2009 Notice of Meeting to Discuss License Renewal Process and Environmental Scoping for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station, License Renewal Application Review ML0910703162009-04-16016 April 2009 NRC Meeting with PSEG Nuclear (Salem & Hope Creek) on May 5, 2009 ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0726402342007-10-0101 October 2007 Notice of Closed Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station ML0724203702007-09-24024 September 2007 Summary of Meeting with PSEG Nuclear LLC Regarding an Application for an Extended Power Uprate for the Hope Creek Generating Station Regarding Steam Dryer Analysis ML0719905282007-08-13013 August 2007 Summary of the June 28, 2007, Meeting with PSEG Nuclear, LLC, Regarding an Application for an Extended Power Uprate for the Hope Creek Generating Station Regarding Dryer Analysis Acceptance Criteria ML0721803862007-08-0606 August 2007 Notice of Forthcoming Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station ML0717804562007-06-27027 June 2007 Notice of Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station, to Discuss Acceptance Criteria for Boiling-Water Reactor Steam Dryer Predictive Load Under Power Uprate ML0712405052007-05-15015 May 2007 Summary of Meeting with PSEG Nuclear LLC, Regarding Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at the Hope Creek Generating Station (Hope Creek) ML0710105422007-04-13013 April 2007 Notice of Forthcoming Meeting with PSEG Nuclear LLC to Discuss Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at Hope Creek ML0709505272007-04-0505 April 2007 Notice of Annual Assessment Meeting with PSEG Nuclear LLC Management to Discuss the Nrc'S Assessment of the Safety Performance at the Salem and Hope Creek Generating Stations for Calendar Year 2006 ML0704602562007-02-15015 February 2007 3/02/07, Notice of Meeting with PSEG Nuclear, LLC, to Discuss Technical Aspects of the Licensee'S Application for an Extended Power Uprate (EPU) at the Hope Creek ML0631001592006-11-0808 November 2006 11/13-14/2006 Revised Notice of Forthcoming Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek ML0630301362006-10-30030 October 2006 11/13-14/2006 Notice of Meeting with PSEG Nuclear LLC Regarding Application for Extended Power Uprate for Hope Creek Generating Station ML0617900252006-07-0505 July 2006 Forthcoming Meeting with PSEG Nuclear LLC Regarding Planned Application for Extended Power Uprate for Hope Creek Generating Station ML0613904192006-05-22022 May 2006 Notice of Meeting with PSEG Nuclear LLC, Regarding Salem Nuclear Generating Station Service Water System ML0613901092006-05-11011 May 2006 Cancellation of Public Meeting with PSEG Nuclear LLC, Regarding Salem Nuclear Generating Station Service Water System and Compliance with Generic Letter 2004-02 ML0612904982006-05-11011 May 2006 Notice of Forthcoming Meeting with PSEG Nuclear LLC, Regarding Salem Nuclear Generating Station Service Water System and Compliance with Generic Letter 2004-02 2024-08-20
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240996, Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate2024-08-0202 August 2024 Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate ML24109A0412024-04-18018 April 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL & Sus PMNS20240187, Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request to Change Surveillance Frequency from 18 Months to 24 Months2024-02-13013 February 2024 Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request to Change Surveillance Frequency from 18 Months to 24 Months PMNS20240186, Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request for Improved Technical Specification Conversion2024-02-13013 February 2024 Meeting with PSEG Nuclear LLC to Discuss a Proposed Hope Creek Generating Station License Amendment Request for Improved Technical Specification Conversion PMNS20231157, Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig2023-10-10010 October 2023 Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig PMNS20231042, Closed Meeting with PSEG Nuclear, LLC (PSEG) and Westinghouse Electric Company (Westinghouse) to Discuss Cobalt-60 Production at Salem Nuclear Generating Station (Salem)2023-09-14014 September 2023 Closed Meeting with PSEG Nuclear, LLC (PSEG) and Westinghouse Electric Company (Westinghouse) to Discuss Cobalt-60 Production at Salem Nuclear Generating Station (Salem) PMNS20230612, Pre-submittal Meeting with PSEG to Discuss the Amendment to Reduce Sites Exclusion Area Boundary2023-05-10010 May 2023 Pre-submittal Meeting with PSEG to Discuss the Amendment to Reduce Sites Exclusion Area Boundary ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20221135, Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site2022-11-0303 November 2022 Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20220509, Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss a License Amendment Request Regarding Emergency Diesel Generator Allowed Outage Time for Salem Nuclear Generating Station, Units 1 and 22022-05-10010 May 2022 Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss a License Amendment Request Regarding Emergency Diesel Generator Allowed Outage Time for Salem Nuclear Generating Station, Units 1 and 2 PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210302, Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Plans and Details of Upcoming License Amendment Request Regarding Changes to the Ultimate Heat Sink Technical Specifications for Hope Creek2021-03-17017 March 2021 Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Plans and Details of Upcoming License Amendment Request Regarding Changes to the Ultimate Heat Sink Technical Specifications for Hope Creek PMNS20210173, Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss Relief Requests to Adopt Code Cases N-878, N-879, and N-880 for Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 22021-02-18018 February 2021 Pre-Submittal Meeting with PSEG Nuclear, LLC to Discuss Relief Requests to Adopt Code Cases N-878, N-879, and N-880 for Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2 ML20287A2472020-10-13013 October 2020 Pre-submittal Teleconference Regarding Proposed Licensing Approach to Install the General Electric Numac Wide Range Neutron Monitoring System for Hope Creek Generating Station ML20140A2762020-05-19019 May 2020 June 10, 2020: Notice of Public Meeting for Salem Generating Station Units No. 1 and 2 and Hope Creek Generating Station ML19084A1102019-03-25025 March 2019 April 10, 2019 Public Meeting Notice for Salem Nuclear Generating Station, Units 1 and 2; Hope Creek Generating Station ML18134A1982018-05-14014 May 2018 5/30/18: Notice of Public Meeting for Salem Nuclear Generating Station, Units 1 and 2; Hope Creek Generating Station ML17076A0562017-03-17017 March 2017 3/28/2017 - Notice of Category 3 Public Annual Assessment Meeting - Salem Nuclear Generating Station Units 1 and 2; Hope Creek Generating Station for 2016 ML16068A3692016-03-0808 March 2016 Notice of Annual Assessment Meeting - Salem Nuclear Generating Station & Hope Creek Generating Station, on March 30, 2016 ML15069A4882015-03-10010 March 2015 March 25, 2015, Notice of Open House Meeting with Salem and Hope Creek Generating Stations LR-N15-0016, Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-062015-01-21021 January 2015 Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-06 ML15015A6772015-01-16016 January 2015 Forthcoming Closed Meeting with PSEG Nuclear, LLC, Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 ML14338A3732014-12-0404 December 2014 Plan for Site Visits DLR 2015 ML14070A4702014-03-11011 March 2014 2014 Salem & Hope Creek Annual Assessment Meeting Notice & Open House, March 27, 2014 ML13233A1132013-08-22022 August 2013 Notice of Forthcoming Meeting with PSEG Nuclear, LLC Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 ML13073A2012013-03-14014 March 2013 Notice of Public Meeting to Discuss Nrc'S Assessment of Safety Performance at Salem Nuclear Generating Station and Hope Creek Generating Station for 2012 ML12314A1572012-11-14014 November 2012 Notice of Forthcoming Meeting with PSEG Nuclear, LLC, Regarding Final Supplemental Reponse to Generic Letter 2004-02 for Salem Generating Station, Units 1 and 2 ML12229A2402012-08-15015 August 2012 Closed Notice of Meeting for Salem and Hope Creek Nuclear Generating Station Scheduled for August 31, 2012 ML12124A0492012-05-0303 May 2012 Update - 2012 Salem & Hope Creek Open House and Public Meeting Notice No. 12-012, for May 15, 2012 ML12103A0382012-04-12012 April 2012 5/15/2012 - Salem and Hope Creek Generating Stations - Notice of Public Meeting with PSEG Nuclear LLC ML12013A1002012-01-13013 January 2012 Notice of Closed Meeting with PSEG Nuclear, LLC, Salem and Hope Creek, to Discuss a Potentially Greater than Green Security Related Finding ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1123511452011-08-24024 August 2011 Forthcoming Meeting with PSEG Nuclear LLC (PSEG) to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1111703172011-04-27027 April 2011 Notice of Public Meeting - Salem Nuclear Generating Station and Hope Creek Generating Station ML1112200122011-04-20020 April 2011 05/12-14/2011 - Meeting (583rd) of the Advisory Committee on Reactor Safeguards - Federal Register Notice ML1029500062010-10-28028 October 2010 11/17/10 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Hope Creek Generating Station and Salem Nuclear Generating Station Units 1 and 2 ML1015405252010-06-0808 June 2010 Notice of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 ML1012412182010-05-0606 May 2010 Public Meeting with Salem-Hope Creek to Discuss PSEG Nuclear, Llc'S Plans for Movement of Spent Fuel from Salem Nuclear Generating Station to the Independent Spent Fuel Storage Installation That It Shares with Hope Creek Generating Station ML1008103452010-03-22022 March 2010 Notice of Public Meeting: Annual Assessment Meeting with PSEG ML1003411882010-02-17017 February 2010 Notice of Forthcoming Meeting with PSEG Nuclear LLC (PSEG) Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0934405582009-12-10010 December 2009 Notice of Closed Meeting with PSEG Nuclear LLC (PSEG) to Discuss Exemption from Schedular Requirements of 10 CFR 73.55 for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0928706352009-10-23023 October 2009 11/05/2009 Notice of Meeting to Discuss License Renewal Process and Environmental Scoping for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station, License Renewal Application Review ML0910703162009-04-16016 April 2009 NRC Meeting with PSEG Nuclear (Salem & Hope Creek) on May 5, 2009 ML0903708282009-02-10010 February 2009 03/16/2009 Forthcoming Meeting to Discuss the Scheduled Submittal of License Renewal Application for Salem and Hope Creek, PSEG Nuclear, LLC ML0900800732009-01-0808 January 2009 Notice of Meeting with PSEG to Discuss Issues Associated with the Yellow Performance Indicator (PI) for the Salem Unit 1 Emergency AC Power System That Occurred in the Fourth Quarter of 2007 ML0810210522008-04-11011 April 2008 Notice of Meeting with PSEG Nuclear Llc., to Discuss Safety Performance at Salem and Hope Creek for Calendar Year 2007 ML0726402342007-10-0101 October 2007 Notice of Closed Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station 2024-08-02
[Table view] |
Text
MN No.07-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 5, 2007 Licensee: PSEG Nuclear LLC Facility: Salem and Hope Creek Generating Stations Docket Nos: 50-272, 50-311, 50-354 Date/Time: April 23, 2007 at 7:00 p.m.
Location: Holiday Inn Select Bridgeport One Pureland Drive Interstate 295 at Exit 10 Swedesboro, NJ 08085 856-467-3322
Purpose:
The NRC requested an Annual Assessment Meeting with PSEG management to discuss the NRCs assessment of the safety performance at the Salem and Hope Creek Generating Stations for calendar year 2006. The NRCs assessment is documented in a letter dated March 2, 2007.
NRC Attendees: D. Lew, Director, Division of Reactor Projects (DRP), Region I A. Burritt, Chief, Projects Branch 3, DRP G. Malone, Senior Resident Inspector, Hope Creek T. Wingfield, Resident Inspector, Hope Creek D. Schroeder, Senior Resident Inspector, Salem H. Balian, Resident Inspector, Salem C. Khan, Senior Project Engineer, DRP S. McCarver, Project Engineer, DRP R. Ennis, Project Manager, NRR PSEG Attendees: W. Levis, Senior Vice President and Chief Nuclear Officer T. Joyce, Site Vice President, Salem G. Barnes, Site Vice President, Hope Creek D. Winchester, Nuclear Oversight Vice President R. Braun, Vice President Operations Support Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting. After the business portions, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Salem and Hope Creeks performance and the role of the agency in ensuring safe plant operations.
2 The NRCs assessment letters for Salem and Hope Creek can be located in ADAMS with accession numbers ML070610586 and ML070610567, respectively. This meeting notice, with the attached meeting agenda, can also be located in ADAMS with accession number ML070950527. ADAMS is accessible at: http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs Annual Assessment process and the safety performance of Salem and Hope Creek can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Meeting
Contact:
Arthur Burritt, Chief, Projects Branch 3 610-337-5069 E-mail: alb1@nrc.gov
- Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by other NRC personnel at this meeting should be made known by April 18, 2007, via telephone to the NRC meeting contact.
Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.
Approved by: \RA\
Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects
3 Distribution:
cc w/encl:
G. Barnes, Site Vice President T. Joyce, Site Vice President - Salem D. Winchester, Vice President - Nuclear Assessments W. F. Sperry, Director of Finance M. Massaro, Hope Creek Plant Manager C. J. Fricker, Salem Plant Manager J. J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania L. A. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director of Radiation Protection and Release Prevention, State of New Jersey K. Tosch, Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., Administrator, Interagency Programs, DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance
Agenda NRCs Annual Assessment Meeting Salem and Hope Creek Generating Stations April 23, 2007 Introductions and Opening Remarks............................................................ NRC (3 minutes)
Review of Reactor Oversight Process ......................................................... NRC (5 minutes)
National Summary of Plant Performance .................................................... NRC (7 minutes)
Discussion of Salem Performance .............................................................. NRC (15 minutes)
Discussion of Hope Creek Performance ..................................................... NRC (15 minutes)
PSEG Response and Remarks................................................................. PSEG (25 minutes)
NRC Closing Remarks .................................................................................. NRC (5 minutes)
Break..................................................................................................................... (5 minutes)
NRC to address public questions..................................................... NRC / Public (as needed)
5 Distribution w/encl: (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)
Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA M. Dapas, DRA A. Burritt, DRP B. Welling, DRP G. Malone, DRP, Senior Resident Inspector T. Wingfield, DRP, Resident Inspector D. Schroeder, Senior Resident Inspector H. Balian, Resident Inspector K. Venuto, DRP, Resident OA J. Lamb, RI OEDO J. Lubinski, NRR H. Chernoff, NRR R. Ennis, PM, NRR J. Shea, NRR Region I Docket Room (with concurrences)
ROPreports@nrc.gov (All Inspection Reports)
R. Shane, OCA G. Matakas, ORA PMNS Region I Docket Room (with concurrences)
SUNSI Review Complete: ___ALB___ (Reviewers Initials)
Accession Number: ML 070950527 DOCUMENT NAME: C:\FileNet\ML070950527.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/PAO NAME CKhan ABurritt DScrenci DATE 04/05/07 04/05/07 04/05/07 OFFICIAL RECORD COPY