ML062200297
ML062200297 | |
Person / Time | |
---|---|
Site: | Byron ![]() |
Issue date: | 08/03/2006 |
From: | Condra D Oak Ridge Institute for Science & Education |
To: | Snell W NRC/RGN-III/DNMS/DB |
References | |
FOIA/PA-2010-0209, RFTA 06-001 IR-06-004 | |
Download: ML062200297 (4) | |
Similar Documents at Byron | |
---|---|
Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024
[Table view]Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02 Category:Report MONTHYEARML23321A0452023-11-17017 November 2023
[Table view]EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood BW230054, Attachment 2: MDMP Deviation Form2023-11-17017 November 2023 Attachment 2: MDMP Deviation Form RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20195B1592020-07-10010 July 2020 Attachment 1 - Description and Assessment ML20195B1622020-06-30030 June 2020 Attachment 11 - SG-SGMP-17-25-NP, Revision 1, Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020 ML20195B1612020-06-25025 June 2020 Attachment 6 - Intertek Report No. Aim 200510800-2Q-1(NP), Byron Unit 2 Operational Assessment Addressing Deferment of B2R22 Steam Generator Tube Examinations to B2R23, April 2022 ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18192C1522018-07-18018 July 2018 Review of Fall 2017 Steam Generator Tube Inservice Inspection Report ML17355A5612017-12-21021 December 2017 Ltr. 12/21/17 Response to Disputed Non-Cited Violation Documented in Byron Station, Units 1 and 2 - Evaluations of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009 (DRS-N.Feliz-Adorno) ML17234A4782017-08-22022 August 2017 Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16344A0062016-12-0909 December 2016 10 CFR 72.48 Evaluation Summary of Biennial Report of Changes, Tests, or Experiments, Performed RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17360A1742016-10-0707 October 2016 Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary) ML16356A0202016-10-0707 October 2016 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-15015 July 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds2016-03-15015 March 2016 Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds RS-15-267, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-11-30030 November 2015 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-072, Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 542015-02-12012 February 2015 Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 54 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14128A5562014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14178B2222014-06-24024 June 2014 Technical Review of TIA 2013-02, Single Spurious Assumptions for Braidwood and Byron Stations Safe-Shutdown Methodology ML14085A5332014-05-29029 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses BYRON 2014-0040, Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill2014-03-27027 March 2014 Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill ML14079A4232014-03-12012 March 2014 Enclosure 1, Byron Nuclear Generating Station, Flood Hazard Reevaluation Report, Revision 0 ML14066A4792014-03-0404 March 2014 Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report2014-02-27027 February 2014 ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report BYRON 2014-0003, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-02-13013 February 2014 Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (Mur) Power Uprate ML13225A5952013-12-17017 December 2013 Interim Staff Evaluation Related to Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) 2023-09-29 Category:Miscellaneous MONTHYEARBW230054, Attachment 2: MDMP Deviation Form2023-11-17017 November 2023
[Table view]Attachment 2: MDMP Deviation Form ML23321A0452023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML18192C1522018-07-18018 July 2018 Review of Fall 2017 Steam Generator Tube Inservice Inspection Report ML17355A5612017-12-21021 December 2017 Ltr. 12/21/17 Response to Disputed Non-Cited Violation Documented in Byron Station, Units 1 and 2 - Evaluations of Changes, Tests, and Experiments Baseline Inspection Report 05000454/2017009; 05000455/2017009 (DRS-N.Feliz-Adorno) RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16344A0062016-12-0909 December 2016 10 CFR 72.48 Evaluation Summary of Biennial Report of Changes, Tests, or Experiments, Performed RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-088, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-15015 July 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-15-072, Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 542015-02-12012 February 2015 Comments on the Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 54 RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application ML14128A5562014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14085A5332014-05-29029 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses ML14066A4792014-03-0404 March 2014 Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event ML13225A5952013-12-17017 December 2013 Interim Staff Evaluation Related to Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) ML13182A0312013-07-0303 July 2013 Transmittal of Final Byron Station, Unit 2, Accident Sequence Precursor Analysis IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-162, Company, LLCs 180-Day Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Company, LLCs 180-Day Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12341A1622012-11-0707 November 2012 Byron Generation Station, Unit 1, 12Q0108.20-R-002 Rev. 1, Seismic Walkdown Checklist (Swc). Part 2 of 2 RS-12-161, Byron Generation Station, Unit 1, 12Q0108.20-R-002 Rev. 1, Seismic Walkdown Checklist (Swc). Part 2 of 22012-11-0707 November 2012 Byron Generation Station, Unit 1, 12Q0108.20-R-002 Rev. 1, Seismic Walkdown Checklist (Swc). Part 2 of 2 RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 1 of 32012-11-0707 November 2012 Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 1 of 3 RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 32012-11-0707 November 2012 Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3 RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 32012-11-0707 November 2012 Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3 RS-12-161, Q0108.20-R-002, Rev. 1, Seismic Walkdown Checklist (Swc). Part 1 of 22012-11-0707 November 2012 Q0108.20-R-002, Rev. 1, Seismic Walkdown Checklist (Swc). Part 1 of 2 ML12341A1662012-11-0707 November 2012 Enclosure 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Byron Station, Unit 2, Report No: 12Q0108.20-R-002, Revision 1 ML12341A1652012-11-0707 November 2012 Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3 ML12341A1642012-11-0707 November 2012 Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3 ML12341A1612012-11-0707 November 2012 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Byron Station, Unit 1, Report No. 12Q0108.20-R-001, Revision 1 2023-11-17 |
Text
OAK RlDDE INSTITUTE FOR SCIENCE AND EDUCATION August 3,2006 Mr. William h e l l U S Nuclear Regulatory Commission Region 111 2443 Warrenville Road Lisle, IL 60532-4351
SUBJECT:
ANALYTICAL RESULTS FOR SIX WATER SAMPLES IN BATCH FIVE FROM THE VICINITY OF THE BYRON GENERATING STATION, BYRON, ILLINOIS
[INSPECTION REPORT NO. 050-00454/2006-0041 (RFTA NO.06-001)
Dear Mr. Snek The Oak Ridge Institute for Science and Education (ORISE) received Batch Five, consisting of SIX water samples on July 17,2006 that were collected in the vicinity of the Byron Generating Station in Byron, Illinois. The samples were analyzed for tritium to a minimum detectable concentration of 180 pCi/L using a liquid scintillation analyzer. The chain-of-custody identified one water sample to be analyzed by gamma spectroscopy (GS). 'l'he sample identifications and collection data are presented in Table 1. The GS data are presented in Table
- 2. The tritium data are presented in Table 3. The pertinent procedure references are provided in the specific tables.
ORISE's Quality Control (QC) requirements were met for these analyses. 'l'he QC files are available for your review upon request.
My contact information is listed below. You may also contact Wade Ivey at 865.576.9184 with any questions or comments.
Sincerely,
. -
Dale Condra, Manager Laboratory RDC:WPI:db Enclosures C: B. Watson, NMSS/DWMEP/DD/SP 7E18 E. Abelquist, ORISE E. Knox-Davin, NRC/NMSS/TWFN 8A23 S. IGrk, ORISE G. Bonano, NRC Region 111 File 1689 I
~~
Distribution approval and concurrence : Initials ,
Techmcal hlanagement Team Member 1x52 A Quality Manager A T P Voice: 865.241.3242 Fax: 865.241.3248 &mall: CondraD@orau.gov RECEfVED AUG 0 8 2006
TABLE 1 ORISE Sample N R C Region 111 Collection Collection ID Sample ID Date Time 1689W0074 BY-06-5-01 7/13/06 8 5 5 AM 1689W0075 BY-06-5-02 7/13/06 9:14 AM 1689W0076 BY-06-5-03 7/13/06 9:25 AM 1689W0077 BY-06-5-04 7/13/06 9:40 AM 1689W0078 BY-06-5-05 7/13/06 9:53 AM 1689WOO79 BY-06-5-06 7/13/06 10:09 AM Byron Generating Station projecVl689 Data Tablesl2006-08-03Data Tables B a s h Five
TABLE 2 NRC Region I11 Radionuclide Concentrations(pCi/L)
ORISE Sample ID Sample ID CO-58 CO-60 cs-134 Cs-137 1689W0078 BY-06-5-05 0.2 t 2.$ 1.6 k 3.1 0.0 2 3.3 -0.2 i 2.9 Byron Generating Station project11689 Data Tabled2006-08-03 Data Tables Balch Five
TABLE 3 ORISE Sample N R C Region 111 Tritium Concentrations, TPUs, ID Sample ID and MDCs' @Ci/L) 1689W0074 BY-06-5-01 60
- loob (180) 1689W0075 BY-06-5-02 20 t 100 (180) -
1689W0076 BY-06-5-03 60 ? 100 (1 80) 1689W0077 BY-06-5-04 60 i- 100 (180) 1689W0078 BY-06-5-05 50 t 100 (180) 1689W0079 BY-06-5-06 20
- 100 (1 80)
Byron Generating Station projectil689 Data Tablesl2006-08-03 Data Tables Batch Five