ML100620914

From kanterella
Revision as of 21:18, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Report 22 - 2010001 Inspection/Activity Plan
ML100620914
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML100620907 List:
References
IR-10-001
Download: ML100620914 (2)


Text

Page 1 of 2 Surry 03/03/2010 07:19:04 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP 4 1 06/28/2010 07/02/2010 V23336 SURRY/JULY 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 07/12/2010 07/16/2010 IP 7111402 Alert and Notification System Evaluation 1, 2 07/12/2010 07/16/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 07/12/2010 07/16/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/12/2010 07/16/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/12/2010 07/16/2010 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 1 4 1 07/26/2010 07/30/2010 V23336 SURRY/JULY 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 1 08/02/2010 08/06/2010 V23336 SURRY/JULY 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 11/01/2010 11/05/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1, 2 11/01/2010 11/05/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/01/2010 11/05/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/01/2010 11/05/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/01/2010 11/05/2010 IP 71124.04 Occupational Dose Assessment 1, 2 11/01/2010 11/05/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/01/2010 11/05/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK2 2 1, 2 11/15/2010 11/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/15/2010 11/19/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/15/2010 11/19/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/15/2010 11/19/2010 IP 71124.04 Occupational Dose Assessment 1, 2 11/15/2010 11/19/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/15/2010 11/19/2010 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASIS INSPECTION 5 1, 2 01/10/2011 01/14/2011 IP 7111121 Component Design Bases Inspection 1, 2 01/31/2011 02/04/2011 IP 7111121 Component Design Bases Inspection 1, 2 02/14/2011 02/18/2011 IP 7111121 Component Design Bases Inspection 1, 2 02/28/2011 03/04/2011 IP 7111121 Component Design Bases Inspection TI-177 - TI-177 GASEOUS INTRUSION 3 1, 2 03/21/2011 03/25/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Surry 03/03/2010 07:19:04 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 04/25/2011 04/29/2011 IP 7111108P Inservice Inspection Activities - PWR PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 06/06/2011 06/10/2011 IP 71152B Identification and Resolution of Problems 1, 2 06/20/2011 06/24/2011 IP 71152B Identification and Resolution of Problems EB3HS - HEAT SINK 1 1, 2 06/13/2011 06/17/2011 IP 7111107T Heat Sink Performance PSB1-RP - RP PUBLIC RADIATION PROTECTION INSPT 4 1, 2 06/13/2011 06/17/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 06/13/2011 06/17/2011 IP 71124.04 Occupational Dose Assessment 1, 2 06/13/2011 06/17/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/13/2011 06/17/2011 IP 71124.07 Public Radiation Safety 1, 2 06/13/2011 06/17/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 06/13/2011 06/17/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure