IR 05000373/2011007

From kanterella
Revision as of 07:13, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373-11-007 & 05000374-11-007)
ML12065A031
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/05/2012
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
References
IR-11-007
Download: ML12065A031 (6)


Text

NITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (REPORT 05000373/2011007 AND 05000374/2011007)

Dear Mr. Pacilio:

On February 14, 2012, the NRC completed its end-of-cycle performance review of LaSalle County Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, LaSalle County Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the ROP baseline, an inspection is planned using Independent Spent Fuel Storage Installation (ISFSI) Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9618 with any questions you have regarding this letter.

Sincerely,

/RA/

Michael A. Kunowski, Branch Chief Branch 5 Division of Reactor Projects Docket Nos. 50-373 and 50-374 License Nos. NPF-11 and NPF-18 Enclosure: LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServe