Letter Sequence RAI |
---|
|
|
MONTHYEARULNRC-05804, Facility Operating License NPF-30 - Proposed Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, (License Amendment Request LDCN 09-0025)2011-06-30030 June 2011 Facility Operating License NPF-30 - Proposed Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, (License Amendment Request LDCN 09-0025) Project stage: Request ML1121505412011-08-0303 August 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.6.6, Containment Spray and Cooling Systems, Project stage: Acceptance Review ML12220A2112012-08-0909 August 2012 Request for Additional Information, License Amendment Request to Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems Project stage: RAI ULNRC-05904, Response to Request for Additional Information Pertaining to Revision of Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, LDCN 09-00252012-09-10010 September 2012 Response to Request for Additional Information Pertaining to Revision of Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, LDCN 09-0025 Project stage: Response to RAI ML12305A1952012-11-0505 November 2012 FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems Project stage: Withdrawal ML12305A1942012-11-0505 November 2012 Withdrawal of an Amendment Request Project stage: Withdrawal NRC-2012-0275, FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems2012-11-0505 November 2012 FRN, Withdrawal of an Amendment Request, Revise Surveillance Requirement 3.6.6.3 for Cooling Water Flow Rate in Technical Specification 3.6.6, Containment Spray and Cooling Systems Project stage: Withdrawal 2012-11-05
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23200A2982023-07-19019 July 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ML23163A1572023-06-0606 June 2023 In-service Inspection Request for Information ML23096A0072023-04-0505 April 2023 NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 ML23080A1382023-03-21021 March 2023 Notification of Inspection (NRC Inspection Report 05000483/2023003) and Request for Information ML23073A0262023-03-13013 March 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 ML23037A7092023-02-0606 February 2023 April 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23026A0212023-01-24024 January 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22269A4312022-09-26026 September 2022 November 2022 Emergency Preparedness Program Inspection - Request for Information ML22173A0562022-06-22022 June 2022 Information Request, Security IR 2022402 ML22167A0252022-06-15015 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 ML22157A0572022-06-0606 June 2022 Notification of NRC Design Bases Assurance Inspection (Programs) (05000483/2022013) and Request for Information ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22151A0512022-05-27027 May 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML21336A6392021-12-0202 December 2021 .05 Sec Doc Request ML21319A0062021-11-30030 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML21258A0382021-09-14014 September 2021 NRR E-mail Capture - Final - Request for Additional Information - Callaway, Unit 1 - LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors- EPID L-2020-LLA-023 ML21159A2352021-06-17017 June 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000483/2021003) and Request for Information ML21130A5882021-05-11011 May 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions to Adopt a Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004 02 ML21088A3872021-03-30030 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000483/2021002) and Request for Information ML21007A1622021-01-0606 January 2021 NRR E-mail Capture - Final - Request for Additional Information - (COVID-19) Callaway Plant, Unit 1 - Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs - EPID L-2021-LLE-0242 ML20203M3682020-07-21021 July 2020 NRR E-mail Capture - Draft Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request - Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and 5.3.1.2 - EPID L-2020-LLA-0046 ML20162A1882020-06-10010 June 2020 Request for Supporting Information for the Callaway SPRA Audit Review - Draft Supplement ML20280A5442020-03-25025 March 2020 Cwy 2020 PIR Request for Information ML20064B6582020-02-27027 February 2020 Second, Third, and Fourth Request for Information for Callaway Dba Teams Inspection 2020011 ML19317E6332019-11-13013 November 2019 Request for Supporting Information for the Callaway SPRA Audit Review ML19107A5152019-04-11011 April 2019 Cwy 2019410 RFI Cyber Security Gap ML19078A2932019-03-18018 March 2019 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2019010) and Request for Information ML19023A2032019-01-22022 January 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000483/2019001) and Request for Information ML19009A3442019-01-0909 January 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Plant Class 1E LAR, L-2018-LLA-0062 ML18355A4882018-12-20020 December 2018 NRR E-mail Capture - Formal Release of RAI Ref: Callaway Plant EAL Changes, L-2018-LLA-0239 ML18331A2052018-11-27027 November 2018 NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Relief Request EPID L-2018-LLR-0051 ML18025B4672018-01-24024 January 2018 NRR E-mail Capture - Request for Extension of Due Date for RAI Response ML17304B1912017-10-31031 October 2017 NRR E-mail Capture - Requests for Additional Information Concerning Callaway License Amendment - Thermal Overload Protection ML17142A1352017-05-19019 May 2017 Notification of NRC Design Bases Assurance Inspection (05000483/2017007) and Initial Request for Information ML17115A0622017-04-25025 April 2017 NRR E-mail Capture - Requests for Additional Information -- Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report CAC MF8463 ML17038A2292017-02-0707 February 2017 NRR E-mail Capture - RAI Formal Release for Callaway SG Tube Inspection Report, MF8474 ML16111B3222016-04-20020 April 2016 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000483/2016007) and Request for Information ML15316A1532015-11-12012 November 2015 Request for Additional Information Email, Relief Request 13R-11 (Pressurizer Welds) from Code Case N-460 Requirements, Third 10-Year Inservice Inspection Interval ML15096A0942015-04-0606 April 2015 Notification of Inspection (NRC Inspection Report 05000483/2015003) and Request for Information ML14353A1172014-12-22022 December 2014 Request for Additional Information, Round 3, License Amendment Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML14294A7752014-10-28028 October 2014 Request for Additional Information, Round 2, License Amendment Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML14203A0632014-07-25025 July 2014 Request for Additional Information, Relief Request I3R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Rv ISI Frequency from 10 to 20 Years, Third 10-Year ISI Interval ML14178A8232014-07-0101 July 2014 Request for Additional Information, License Amendment Request to Revise Final Safety Analysis Report- Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ULNRC-06117, Callaway Plant, Unit 1, License Revewal Application, Request for Additional Information (RAI) Set 31 Responses2014-04-24024 April 2014 Callaway Plant, Unit 1, License Revewal Application, Request for Additional Information (RAI) Set 31 Responses 2024-03-07
[Table view] Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20230022024-02-21021 February 2024 Amended Integrated Inspection Report 05000483/2023002 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 2024-09-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1- REQUEST FOR ADDITIONAL INFORMATION RE: PROPOSED CHANGE TO TECHNICAL SPECIFICATION 3.6.6, "CONTAINMENT SPRAY AND COOLING SYSTEMS" (TAC NO. ME6645)
Dear Mr. Heflin:
By application dated June 30, 2011, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML111820367), Union Electric Company (the licensee) requested a license amendment for Callaway Plant, Unit 1, to revise Technical Specification (TS) 3.6.6, "Containment Spray and Cooling Systems," Surveillance Requirement (SR) 3.6.6.3 for verifying the minimum required containment cooling train cooling water flow rate.
The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to Mr. S. Maglio of your staff on August 7, 2012. Please provide a response to the questions by September 10, 2012.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of NRC staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at Fred, Lyon@nrc,gov.
Sincerely.
Carl F. Lyon, Project Manager*
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION PROPOSED CHANGE TO TECHNICAL SPECIFICATION 3.6.6, "CONTAINMENT SPRAY AND COOLING SYSTEMS' CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483
Background
By application dated June 30, 2011, to the U.S. Nuclear Regulatory Commission (NRC), Union Electric Company (the licensee) requested an amendment to revise Technical Specification (TS) 3.6.6, "Containment Spray and Cooling Systems," Surveillance Requirement (SR) 3.6.6.3 for verifying the minimum required containment cooling train cooling water flow rate. SR 3.6.6.3 requires verification that containment cooling train cooling water flow rate is ;?; 2200 gallons per minute (gpm). The TS Bases state, in part, that Verifying that each containment cooling train ESW [essential service water]
cooling rate flow is ;?; 2200 gpm provides assurance that the design flow rate assumed in the safety analysis will be achieved.
The Callaway Plant, Unit 1 Final Safety Analysis Report (FSAR) Section 6.2.2.2.1.1, "Safety Design Basis;' for the containment cooling system (CtCS) states, in part, that The CtCS, in conjunction with the CSS [containment spray system], is capable of removing sufficient heat energy and subsequent decay heat from the containment atmosphere following the LOCA [Ioss-of-coolant accident] or MSLB
[main steam line break] accident to maintain the containment pressure below design values.
The licensee is requesting a change to SR 3.6.6.3 from requiring a flow rate;?; 2200 gpm to that which is within limits:' The flow rate of 2200 gpm is one of the design inputs in the safety analysis mentioned above. The licensee proposes to change the TS Bases to read"within limits specified in plant flow balance procedures and calculations:'
Request The NRC staff has reviewed the information provided by the licensee in its letter dated June 30, 2011, and determined that additional information is necessary to complete the review of the amendment request. Please provide a response which addresses the following questions.
Balance-of-Plant Branch (SBPB) Questions
- 1. Please describe the methodology of the safety analysis where 2200 gpm was determined to provide assurance that the safety functions of the containment cooling Enclosure
- 2 system will be performed and provide all the design inputs and design assumptions of that safety analysis.
- 2. Please describe the methodology of the safety analysis where the "within limits" flow rate will be determined to provide assurance that the safety functions of the containment cooling system will be performed and provide all the design inputs and design assumptions of that safety analysis.
- 3. Please identify and justify any differences in design input, design assumptions, and methodology between 1 and 2 above.
- 4. Please explain what criteria will be used to specify a change to the flow rate is "within limits" and how those criteria will be obtained.
S. Please confirm that the procedure for determining that a flow rate value must be changed and the steps to implement the change are documented in a controlled procedure.
Technical Specifications Branch (STSB) Questions
- 1. The CtCS satisfies Criterion 3 of paragraph SO.36(c)(2}(ii) of Title 10 of the Code of Federal Regulations (10 CFR) for inclusion in the TSs. SRs, in accordance with 10 CFR SO.36(c}(3), must be included that assure that the necessary quality of the system is maintained and that the limiting condition for operation (lCO) will be met.
SR 3.6.6.3, as currently structured in the TSs, provides assurance that the design flow rate necessary to provide the heat removal capability assumed in the safety analyses will be achieved and that the lCO is met. Removing the design flow rate from SR 3.6.6.3, as proposed, will create an SR that provides no assurance that the design flow rate assumed in the safety analyses will be achieved, since neither the surveillance acceptance criteria nor the methodology for determining the acceptance criteria are included in the TSs. Please state how the proposed new SR 3.6.6.3 would meet the regulatory requirements of 10 CFR SO.36(c){3).
- 2. Please describe the Callaway program for complying with the guidance of NRC Generic letter 89-13, "Service Water Problems Affecting Safety Related Equipment," dated July 18, 1989 (ADAMS Accession No. Ml0311S0348), and any changes to this program necessary to be consistent with the proposed deletion of the numerical value of the emergency service water system flow rate from the Callaway TSs.
- 3. Please discuss any changes to plant operation or procedures necessary to comply with the guidance of NRC Generic letter 96-06, "Assurance of Equipment Operability and Containment Integrity during Design-Basis Accident Conditions," dated September 30, 1996 (ADAMS Accession No. Ml03111 0021). Discuss why the possibility of problems such as water hammer and two-phase flow will not be increased by this change. Please clarify if water hammer and two-phase flow are part of the consideration in changing the service water flow rate.
August 9,2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 SUB..JECT: CALLAWAY PLANT, UNIT 1- REQUEST FOR ADDITIONAL INFORMATION RE: PROPOSED CHANGE TO TECHNICAL SPECIFICATION 3.6.6, "CONTAINMENT SPRAY AND COOLING SYSTEMS" (TAC NO. ME6645)
Dear Mr. Heflin:
By application dated June 30,2011, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession No. ML111820367), Union Electric Company (the licensee) requested a license amendment for Callaway Plant, Unit 1, to revise Technical Specification (TS) 3.6.6, "Containment Spray and Cooling Systems," Surveillance Requirement (SR) 3.6.6.3 for verifying the minimum required containment cooling train cooling water flow rate.
The NRC staff has reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were provided to Mr. S. Maglio of your staff on August 7,2012. Please provide a response to the questions by September 10, 2012.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of NRC staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at Fred.Lyon@nrc.gov.
Sincerely, IRA by KKalyanam fori Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDssScvb Resource RidsRgn4MailCenter Resource LPLIV Reading RidsNrrDssStsb Resource MHamm, NRR/DSS/STSB RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource GPurciarello, NRR/DSS/SBPB RidsNrrDorlLpl4 Resource RidsNrrPMCallaway Resource ASaliman, NRR/DSS/SCVB RidsNrrDssSbpb Resource RidsOgcRp Resource ADAMS Accession No.: ML12220A211 *email. dated August 3, 20 2 OFFICE NRRlLPL4/PM NRRlLPL4/LA DSS/STSB/BC DS SIS BPB/BC NRRlLPL4/BC NRRlLPL4/PM FLyon NAME FLyon JBurkhardt RElliott* GCasto* MMarkley (KKalyanam for)
DATE 8/8112 8/8/12 8/3/12 8/3/12 8/9/12 8/9/12 OFFICIAL RECORD COpy