IR 05000285/2015405

From kanterella
Revision as of 09:32, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Material Control and Accounting Program Inspection Report 05000285/2015405
ML15182A323
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/01/2015
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Cortopassi L
Omaha Public Power District
L. Carson, II
References
IR 2015405
Download: ML15182A323 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION uly 1, 2015

SUBJECT:

FORT CALHOUN STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000285/2015405

Dear Mr. Cortopassi:

On May 1, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Fort Calhoun Station. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on May 1, 2015, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of the NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket: 50-285 License: DPR-40 Nonpublic Enclosure:

NRC Inspection Report FCS 05000285/2015405 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc: w/o enclosure:

Electronic Distribution for Fort Calhoun Station