| Start date | Site | Title | System |
---|
IR 05000400/2024001 | 5 May 2024 | Harris | Integrated Inspection Report 05000400/2024001 | Steam Generator Reactor Coolant System Service water Emergency Diesel Generator Auxiliary Feedwater HVAC Residual Heat Removal |
ML24107B130 | 26 April 2024 | | Accident Sequence Precursor Program 2023 Annual Report | Steam Generator Reactor Coolant System Feedwater Service water High Pressure Coolant Injection Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Reactor Core Isolation Cooling Core Spray Residual Heat Removal Automatic Depressurization System Residual Heat Removal Service Water Emergency Core Cooling System Decay Heat Removal Safety Relief Valve Main Steam |
ML24052A337 | 25 April 2024 | Rhode Island Atomic Energy Commission | Examination Report Letter No. 50-193/OL-24-01, Rhode Island Nuclear Science Center | Control Rod |
IR 05000336/2023004 | 14 February 2024 | Millstone | Integrated Inspection Report 05000336/2023004 and 05000423/2023004 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Auxiliary Feedwater Reactor Pressure Vessel Residual Heat Removal Main Steam Safety Valve Emergency Core Cooling System Decay Heat Removal Main Steam Line Main Steam Containment Spray |
2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | 11 January 2024 | Arkansas Nuclear | Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Control Room Emergency Ventilation Main Steam Line Main Steam Containment Spray |
NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems | 6 December 2023 | Hatch | Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems | Service water Reactor Protection System Primary containment Shutdown Cooling Core Spray Residual Heat Removal Residual Heat Removal Service Water Core Standby Cooling System Emergency Core Cooling System Decay Heat Removal Control Room Envelope |
ML23334A152 | 30 November 2023 | Millstone | Auxiliary Feedwater Control Valve Failure Resulting in a Condition Prohibited by Technical Specifications | Steam Generator Feedwater Auxiliary Feedwater Decay Heat Removal |
ML23275A122 | 2 October 2023 | Saint Lucie | Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Shield Building Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray Emergency Feedwater Actuation System |
ML23269A023 | 22 September 2023 | Arkansas Nuclear | NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions | Steam Generator Feedwater Service water Main Steam Isolation Valve Containment Spray |
ML23206A041 | 2 August 2023 | Hatch | SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 | Service water Primary containment Shutdown Cooling Core Spray Residual Heat Removal Service Water Core Standby Cooling System |
ML23193A879 | 28 June 2023 | Millstone | Technical Requirements Manual (Incorporated by Reference) Including Change No. 185 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Reactor Pressure Vessel Remote shutdown Emergency Core Cooling System Control Rod Main Steam Containment Spray |
ML23151A450 | 24 May 2023 | Turkey Point | Enclosure 2, Volume 12: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Control Room Emergency Filtration System Fuel Pool Cooling and Cleanup Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Main Steam Emergency Feedwater Actuation System |
2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | 5 April 2023 | Arkansas Nuclear | License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Main Turbine Shutdown Cooling HVAC Control Room Emergency Ventilation Main Steam Safety Valve Emergency Core Cooling System Decay Heat Removal Main Steam Line Containment Spray Emergency Feedwater System |
ML23095A019 | 4 April 2023 | Turkey Point | Enclosure 2 - ITS Section 3.7 Plant Systems, Revision 2, Volume 12 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Control Room Emergency Filtration System Fuel Pool Cooling and Cleanup Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Main Steam Emergency Feedwater Actuation System |
ML23095A008 | 4 April 2023 | Turkey Point | Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Shield Building Control Room Emergency Filtration System Fuel Pool Cooling and Cleanup Main Steam Safety Valve Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Control Rod Main Steam Containment Spray Emergency Feedwater Actuation System |
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes | 29 March 2023 | Hope Creek | Submittal of Hope Creek Generating Station Technical Specification Bases Changes | Reactor Coolant System Feedwater Secondary containment Service water High Pressure Coolant Injection Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Primary Containment Isolation System Reactor Core Isolation Cooling Primary containment Main Turbine Shutdown Cooling HVAC Reactor Pressure Vessel Core Spray Residual Heat Removal Reactor Water Cleanup Control Room Emergency Filtration System Automatic Depressurization System Standby Liquid Control Intermediate Range Monitor Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Rod Worth Minimizer Control rod blade Main Condenser Control Rod Main Steam Containment Spray Low Pressure Coolant Injection Main Turbine Bypass System |
ML23058A454 | 16 March 2023 | Millstone | Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints | Steam Generator Reactor Coolant System Feedwater Emergency Diesel Generator Auxiliary Feedwater Shutdown Cooling Residual Heat Removal Remote shutdown Emergency Core Cooling System Main Steam |
IR 05000272/2022004 | 31 January 2023 | Salem | Integrated Inspection Report 05000272/2022004 and 05000311/2022004 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Auxiliary Feedwater Residual Heat Removal Main Condenser Control Rod |
ML22193A071 | 23 June 2022 | Millstone | Technical Requirements Manual | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Reactor Pressure Vessel Remote shutdown Emergency Core Cooling System Control Rod Main Steam Containment Spray |
W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. | 16 May 2022 | Waterford | Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Filtration System Main Steam Safety Valve Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Main Steam Containment Spray Emergency Feedwater System |
ML22103A171 | 13 April 2022 | Waterford | LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information | Steam Generator Feedwater Main Steam Isolation Valve HVAC Control Room Emergency Filtration System Containment Spray |
ML22096A221 | 6 April 2022 | Millstone | Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Steam Generator Reactor Coolant System Feedwater Emergency Diesel Generator Auxiliary Feedwater Residual Heat Removal Remote shutdown Emergency Core Cooling System Control Rod Main Steam |
ML22089A210 | 30 March 2022 | Turkey Point | Enclosure 2 - Volume 12, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems Revision 1 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Residual Heat Removal Control Room Emergency Ventilation Control Room Emergency Filtration System Fuel Pool Cooling and Cleanup Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Main Steam Emergency Feedwater Actuation System |
ML21348A713 | 14 March 2022 | Hope Creek | Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink | Secondary containment Service water Emergency Diesel Generator Residual Heat Removal |
ML22062B046 | 28 February 2022 | NS Savannah | Us Dept. of Transportation, Maritime Admin., Annual Report for CY202l, Revision 0. STS-217 | Steam Generator |
ML23086C062 | 28 February 2022 | Vallecitos Nuclear Center | Enclosure 1: GEH Supplemental Information for Ntr License Renewal Application | Control Rod |
ML22116A182 | 11 February 2022 | Salem | Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Auxiliary Feedwater Main Turbine Shutdown Cooling Residual Heat Removal Emergency Core Cooling System Main Steam Line Control Rod Containment Spray |
ML22032A269 | 28 January 2022 | Millstone | Technical Specification Bases Pages | Steam Generator Reactor Coolant System Feedwater Secondary containment Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Primary containment Shutdown Cooling Reactor Pressure Vessel Control Room Emergency Ventilation Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Control Rod Auxiliary Feed Water Main Steam Containment Spray |
ML21265A383 | 22 September 2021 | Turkey Point | Improved Technical Specifications Conversion, Volume 12, Revision 0, Section 3.7, Plant Systems | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Residual Heat Removal Control Room Emergency Ventilation Control Room Emergency Filtration System Fuel Pool Cooling and Cleanup Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Main Steam Emergency Feedwater Actuation System |
ML21265A297 | 15 September 2021 | Saint Lucie | Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Shield Building Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray Emergency Feedwater Actuation System |
ML21197A137 | 26 July 2021 | North Carolina State University | Office of Nuclear Reactor Regulation Regulatory Audit Topics Regarding the Reactor Description, Radiation Protection, and Accident Analysis Described in the Application for License Renewal License No. R-33 General Electric Hitachi Nuclear E | Control Rod |
ML21201A158 | 24 June 2021 | Millstone | 9 to Updated Final Safety Analysis Report, Technical Requirements Manual | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Reactor Pressure Vessel Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Control Rod Main Steam Containment Spray |
ML21167A327 | 16 June 2021 | Harris | 301 ADAMS 2A-2 | Steam Generator Feedwater HVAC Main Steam Line Main Steam Containment Spray |
W3F1-2021-0035, Technical Requirements Manual Update | 18 May 2021 | Waterford | Technical Requirements Manual Update | Reactor Coolant System Feedwater Emergency Diesel Generator Main Steam Isolation Valve Primary containment Main Transformer HVAC Main Steam Line |
LR-N21-0025, License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | 7 May 2021 | Hope Creek | License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink | Secondary containment Service water Emergency Diesel Generator Primary containment Residual Heat Removal Control Room Emergency Filtration System Circulating Water System Control Room Envelope Containment Spray |
ML21137A289 | 8 April 2021 | Arkansas Nuclear | 6_AN2-2021-03 Operating Test Comments (Final) | Steam Generator |
ML21137A288 | 8 April 2021 | Arkansas Nuclear | 5_AN2-2021-03 Draft Operating Test | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Primary containment Main Turbine Shutdown Cooling Main Steam Safety Valve Remote shutdown Main Steam Line Main Condenser Main Steam Containment Spray Emergency Feedwater System |
ML21134A242 | 8 April 2021 | Arkansas Nuclear | 9_AN2-2021-03 Final Operating Test | Steam Generator Reactor Coolant System Feedwater Service water Main Steam Isolation Valve Auxiliary Feedwater Primary containment Main Turbine Main Steam Safety Valve Remote shutdown Main Steam Line Main Condenser Main Steam Containment Spray Emergency Feedwater System |
ML21134A241 | 8 April 2021 | Arkansas Nuclear | 8_AN2-2021-03 Final Written Exam | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Primary containment Main Transformer Main Turbine Shutdown Cooling Safety Parameter Display System HVAC Reactor Pressure Vessel Core Spray Residual Heat Removal Stator Water Cooling Circulating Water System Main Steam Safety Valve Remote shutdown Stator Cooling Water Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray Extraction steam Emergency Feedwater System Emergency Feedwater Actuation System |
ML21047A314 | 2 April 2021 | Harris | Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Auxiliary Feedwater Main Transformer Emergency Core Cooling System Main Steam Line Control Rod Auxiliary Feed Water Containment Spray |
ML21067A665 | 18 March 2021 | NS Savannah | Ns Savannah LAR 18, Change to Ship Draft Monitoring Method, and Deletion of Redundant Tech Specs | |
ML21047A432 | 15 February 2021 | Millstone | Attachment 1: MPS2 Technical Specification Bases Pages | Steam Generator Reactor Coolant System Feedwater Secondary containment Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Primary containment Shutdown Cooling Reactor Pressure Vessel Control Room Emergency Ventilation Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Control Rod Auxiliary Feed Water Main Steam Containment Spray |
W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B | 8 February 2021 | Waterford | Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Emergency Core Cooling System Main Steam Line Control Room Envelope Main Steam Containment Spray Emergency Feedwater System |
ML21028A405 | 25 January 2021 | Harris | 301 ADAMS 2A-2 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Main Turbine Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Filtration System Remote shutdown Main Steam Line Main Condenser Control Rod Main Steam Containment Spray |
ML21028A339 | 25 January 2021 | Harris | 301 ADAMS 2A-1 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Auxiliary Feedwater Main Turbine Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Filtration System Remote shutdown Main Steam Line Main Condenser Control Rod Main Steam Containment Spray |
RA-20-0321, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Comple | 11 November 2020 | Harris | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completi | Steam Generator Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Decay Heat Removal Main Steam Line Safety Relief Valve Main Steam Containment Spray |
SBK-L-20132, Fourth Interval Inservice Testing (IST) Program | 21 October 2020 | Seabrook | Fourth Interval Inservice Testing (IST) Program | Steam Generator Reactor Coolant System Feedwater Service water High Pressure Coolant Injection Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Fuel Pool Cooling and Cleanup Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Main Steam Containment Spray Emergency Feedwater System |
ML20302A234 | 15 October 2020 | Millstone | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Main Turbine Shutdown Cooling Reactor Pressure Vessel Residual Heat Removal Circulating Water System Main Steam Safety Valve Steam Jet Air Ejector Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray |
ML20255A084 | 4 September 2020 | NS Savannah | Us Dept. of Transportation, Maritime Admin: Administrative Changes to Technical Specifications - License Amendment Request No. LAR 2020-01 | Control Rod |
ML20237F435 | 4 September 2020 | Oconee Harris | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Auxiliary Feedwater Residual Heat Removal Remote shutdown Emergency Core Cooling System Decay Heat Removal Containment Spray |
ML20282A534 | 29 July 2020 | South Texas | ST-2020-07 Final Op Test | Steam Generator Feedwater Auxiliary Feedwater Main Turbine HVAC Circulating Water System Stator Cooling Water Decay Heat Removal Main Steam Line Control Rod Main Steam Containment Spray |
ML20282A784 | 29 July 2020 | South Texas | ST-2020-07 Draft Op Test | Steam Generator Reactor Coolant System Feedwater Auxiliary Feedwater Main Turbine HVAC Fuel Pool Cooling and Cleanup Circulating Water System Stator Cooling Water Decay Heat Removal Main Steam Line Control Rod Main Steam Containment Spray |
ML23103A064 | 29 July 2020 | South Texas | ST-2020-07 Final Op Test | Steam Generator Reactor Coolant System Feedwater Auxiliary Feedwater Main Turbine HVAC Fuel Pool Cooling and Cleanup Circulating Water System Stator Cooling Water Decay Heat Removal Main Steam Line Control Rod Main Steam Containment Spray |
ML20209A358 | 22 June 2020 | Millstone | 8 to Updated Final Safety Analysis Report, Technical Requirement Manual | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Reactor Pressure Vessel Remote shutdown Emergency Core Cooling System Control Rod Main Steam Containment Spray |
ML20034F637 | 28 February 2020 | Limerick | Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Reactor Coolant System Feedwater Secondary containment Service water High Pressure Coolant Injection Reactor Protection System Emergency Diesel Generator Reactor Core Isolation Cooling Primary containment Shutdown Cooling Reactor Pressure Vessel Core Spray Residual Heat Removal Standby Gas Treatment System Automatic Depressurization System Standby Liquid Control Residual Heat Removal Service Water Core Standby Cooling System Spray Pond Emergency Core Cooling System Main Steam Line Safety Relief Valve Control Rod Containment Spray Low Pressure Coolant Injection Main Turbine Bypass System |
ML20063L287 | 26 February 2020 | Millstone | Technical Specification Bases Pages | Steam Generator Reactor Coolant System Feedwater Secondary containment Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Primary containment Main Turbine Shutdown Cooling Safety Parameter Display System Reactor Pressure Vessel Residual Heat Removal Control Room Emergency Ventilation Control Room Emergency Filtration System Circulating Water System Main Steam Safety Valve Remote shutdown Steam Jet Air Ejector Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Control Rod Auxiliary Feed Water Main Steam Containment Spray |
RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 6 February 2020 | Oconee Harris | Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Auxiliary Feedwater Residual Heat Removal Remote shutdown Emergency Core Cooling System Decay Heat Removal Containment Spray |
ML19224B705 | 12 August 2019 | Limerick | Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended... | Reactor Coolant System Feedwater Secondary containment Service water High Pressure Coolant Injection Reactor Protection System Emergency Diesel Generator Reactor Core Isolation Cooling Primary containment Main Turbine Shutdown Cooling Reactor Recirculation Pump HVAC Core Spray Reactor Water Cleanup Standby Gas Treatment System Standby Liquid Control Intermediate Range Monitor Residual Heat Removal Service Water Spray Pond Emergency Core Cooling System Decay Heat Removal Main Steam Line Main Condenser Control Rod Main Steam Containment Spray Low Pressure Coolant Injection Main Turbine Bypass System |
ML19192A031 | 10 July 2019 | Limerick | NRR E-mail Capture - LIMERICK-REQUEST for Additional Information: Risk Informed Completion Times TSTF-505, Revison 2, Provide RISK-INFORMED Completion Times - RITSTF Initiative 4B | Secondary containment Service water Primary containment Reactor Pressure Vessel Standby Gas Treatment System Standby Liquid Control Residual Heat Removal Service Water Safety Relief Valve Control Rod Containment Spray Main Turbine Bypass System |
ML19113A099 | 2 July 2019 | Saint Lucie | Issuance of Amendments Regarding Adoption of Risk-Informed Completion Times in Technical Specifications | Steam Generator Reactor Coolant System Feedwater Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling Control Room Emergency Ventilation Emergency Core Cooling System Main Steam Line Containment Spray |