ML17289A311

From kanterella
Revision as of 13:06, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discusses Arrangements for Mgt Meeting During First Quarter 1992 Prior to Start of Annual Outage
ML17289A311
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/28/1992
From: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-92-023, GO2-92-23, NUDOCS 9202110045
Download: ML17289A311 (3)


Text

ACCELERATED D+"IUBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9202110045 DOC.DATE: 92/01/28 NOTARIZED: NO DOCKET g FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILXATION MAZUR,D.W. Washington Public Power Supply System RECIP.NAME RECIPXENT AFFXLIATION MARTIN,J-B. Region 5 (Post 820201)

SUBJECT:

Discusses arrangements for mgt meeting during first quarter 1992 prior to start of annual outage.

DISTRIBUTION CODE: IE45D TITLE: Summary NOTES:

COPIES RECEIVED:LTR j ENCL of Significant Meeting with Licensee (Part 0 SIZE:

50) S RECXPIENT COPIES RECXPXENT COPIES ID CODE/NAME LTTR ENCL SD CODE/NAME LTTR ENCL PD5 LA ENG,P.L.

AEOD/DOA 'NTERNAL:

1 AEOD/DSP/TPAB 1 DEDRO 1 NRR/DLPQ/LPEB10 1 D NRR/DREP/PEPB9D 1 NRR/PMAS/ILRB12 1 BSTRACT 1 OGC/ROED 1 S REG EIL 02 1 RES/DSIR/EIB 1 FILE 01 1 EXTERNAL: NRC PDR NSIC D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPXES REQUXRED: LTTR 15 ENCL

RECF i'/EI3 C

WASH@NSN'UBLIC POWER SUPPLY SYSTEM P.O. Bo0)i(8 ffQOOQGeQQ PaQ5igton Way ~ Richland, Washington 99352 January 28, 1992 G02-92-023 Docket No. 50-397 Mr. J.B. Martin Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Martin:

SUBJECT:

WNP-2, OPERATING LICENSE NPF-21, MANAGEMENTMEETING SCHEDULE Following the Management meeting held in your office on December 20, 1991, we discussed the need to schedule Management meetings on ~ regular basis durirlg.the coniing'ear. In'. the our'goal:has been to schedule Management meetings on a quarterly basis to pr'ovide an 'ast, opportunity for both of us to assess progress 'an'd make sure that the right is'sues are being addressed. In fact, the meeting held on December 20 was initially scheduled for March 19, 1991, and was overtaken by events related to the Operator Requalification Program.

I have requested that Mr. Sorensen, of my staff, begin now to work with Mr. Zimmerman, of your office, to.establish a meeting date during the first quarter of 1992, prior to the start of our annual outage. 'I: am:aware that you 'have-tentatively'cheduled 'a Systematic 'Ass'essment of Licensee'Performance (SALP) meeting for February 20, 1992. I prefer that the Management meeting be conducted on a date other than the SALP meeting date, so we do not run into the same problems as on December 20.

In addition, I have requested that Mr. Sorensen work with Mr. Zimmerman to arrange a meeting which would include senior management from the other licensees in Region V as well as you and your staff for the purpose of jointly discussing recent events within the region. It is my understanding that this has been discussed and Mr. Zimmerman is working on available dates and meeting topics.

9202110045 920128 PDR ADOCK 05000397

Mr. J.B. Martin Page 2 January g8, 1992 MANAGEMENTMEETING SCHI<'.DULE, I appreciate the interest which you take in the operation of WNP-2 and look forward to the opportunity to share our accomplishments with you throughout the year.

Very truly yours, D.. M ur Managing Director (Mail Drop 387)

GCS:sn CC: PL Eng, NRC NS Reynolds, %8cS Document Contol Desk, NRC DL williams, BPA (399)

NRC Site Inspector (901A)