Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARLD-90-075, Forwards Amend H to CESSAR - Design Certification1990-10-0303 October 1990 Forwards Amend H to CESSAR - Design Certification LD-90-060, Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per1990-08-28028 August 1990 Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per LD-90-046, Forwards Addl Copies of Amend G to CESSAR-DC1990-07-12012 July 1990 Forwards Addl Copies of Amend G to CESSAR-DC ML20044A5531990-06-18018 June 1990 Advises That Licensee Will Submit Application for Final Design Approval & Design Certification of Process Inherent Ultimate Safety Reactor in FY92 & That Safe Integral Reactor Anticipated in FY93,in Addition to Sys 80+ Under Review ML20042E9001990-04-30030 April 1990 Forwards Amend G to CESSAR-design Certification,Per Draft Licensing Review Basis Document ML20006A7201990-01-0505 January 1990 Requests That Consolidated Financial Statements Submitted to NRC by 891121 Ltr Re Indirect Transfer of C-E Licenses Be Treated as Confidential,Per 10CFR2.790.Supporting Affidavit Encl ML20011D5151989-12-22022 December 1989 Forwards Amend F to C-E Std SAR - Design Certification (CESSAR-DC). ML19324B6811989-10-30030 October 1989 Forwards Response to Request for Addl Info Re C-E QA Program & CESSAR-DC,Chapter 17,proposed Rev to CESSAR-DC & Rev 5 to CENPD-210, QA Program:Description of Nuclear Power Businesses QA Program. LD-89-107, Forwards Addl Info Re CESSAR-DC Chapter 71989-09-28028 September 1989 Forwards Addl Info Re CESSAR-DC Chapter 7 LD-89-092, Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification1989-08-17017 August 1989 Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification LD-89-091, Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys1989-08-16016 August 1989 Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys ML20247P8071989-04-0404 April 1989 Forwards Ltr in Which Concerns for Potential Significant Deficiency Under 10CFR21 Expressed LD-89-035, Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR521989-03-30030 March 1989 Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52 LD-89-033, Forwards Design Certification Licensing Review Basis, for Review & Concurrence1989-03-30030 March 1989 Forwards Design Certification Licensing Review Basis, for Review & Concurrence LD-89-029, Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request1989-03-17017 March 1989 Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request LD-89-028, Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl1989-03-15015 March 1989 Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl ML17304B0511989-02-23023 February 1989 Requests That Sending of NRR Correspondence W/Util Re Plant to Recipient Continue,In Response to 890216 Ltr LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review1988-11-11011 November 1988 Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review LD-88-128, Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA1988-11-0404 November 1988 Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA LD-88-119, Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-11988-10-21021 October 1988 Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-1 LD-88-106, Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees1988-09-30030 September 1988 Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees LD-88-099, Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition1988-09-20020 September 1988 Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition LD-88-091, Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed1988-09-14014 September 1988 Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed LD-88-089, Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request1988-09-0909 September 1988 Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request LD-88-088, Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance1988-09-0909 September 1988 Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance LD-88-069, Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map1988-08-0202 August 1988 Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map ML20151Q8581988-08-0202 August 1988 Informs That Vendor Finalizing Review & Anticipates That Rev 5 to CENPD-210 Will Be Transmitted by Sept 1988.Road Map Will Also Be Submitted to Identify Remaining QA Questions LD-88-068, Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per1988-08-0101 August 1988 Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per LD-88-066, Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design1988-07-29029 July 1988 Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design ML20150E7261988-07-0101 July 1988 Forwards Flow Distribution & Tube Vibration:Evaluation of Sys 80 Steam Generator Tube Lane/Economizer Corner Region, in Support of C-E 870918 Request That Steam Generator Tube Vibration Issue Be Closed LD-88-047, Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl1988-06-30030 June 1988 Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl LD-88-046, Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch1988-06-30030 June 1988 Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch LD-88-042, Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted1988-06-17017 June 1988 Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted LD-88-039, Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request1988-06-0606 June 1988 Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request LD-88-038, Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days1988-06-0606 June 1988 Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days LD-88-034, Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits1988-05-25025 May 1988 Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits LD-88-033, Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses1988-05-25025 May 1988 Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses LD-88-026, Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested1988-04-11011 April 1988 Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested LD-88-021, Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes1988-03-22022 March 1988 Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes LD-88-019, Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl1988-03-18018 March 1988 Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl LD-88-020, Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl1988-03-18018 March 1988 Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl ML20149M6171988-02-16016 February 1988 Forwards Proprietary & Nonproprietary Base Line Level 1 PRA for Sys 80R NSSS Design, Per NRC Request.Proprietary Rept Withheld (Ref 10CFR2.790) LD-88-008, Forwards Proprietary Base Line Level 1 PRA for Sys 80r NSSS Design. Rept Presents Methodology & Results of Sys 80 PRA to Be Used for Evaluation of Design trade-offs for Sys 80+ Std Design1988-01-22022 January 1988 Forwards Proprietary Base Line Level 1 PRA for Sys 80r NSSS Design. Rept Presents Methodology & Results of Sys 80 PRA to Be Used for Evaluation of Design trade-offs for Sys 80+ Std Design ML20148D3241988-01-19019 January 1988 Forwards Input to Licensing Review Bases Document Being Developed for CESSAR - Design Certification Originally Transmitted on 870702.Encl C-E Sys 80+TM Std Design Design Certification Bases Addresses NRC 871207 Comments LD-87-068, Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested1987-11-30030 November 1987 Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested LD-87-054, Forwards Amend 12 to CESSAR Fsar,Modifying Sys 80R Design. Enhanced & Expanded Sys 80 Design Will Be Called Sys 80 Tm1987-09-18018 September 1987 Forwards Amend 12 to CESSAR Fsar,Modifying Sys 80R Design. Enhanced & Expanded Sys 80 Design Will Be Called Sys 80 Tm LD-87-051, Provides Design Info to Support Conclusion That Sys 80R in Compliance W/Atws Rule.Requests Closure of Issuance on CESSAR - F Docket.Response to NRC Evaluation of CEN-315,Sys 80R Encl1987-09-18018 September 1987 Provides Design Info to Support Conclusion That Sys 80R in Compliance W/Atws Rule.Requests Closure of Issuance on CESSAR - F Docket.Response to NRC Evaluation of CEN-315,Sys 80R Encl LD-87-056, Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request1987-09-18018 September 1987 Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request LD-87-053, Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes1987-09-18018 September 1987 Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes LD-87-050, Requests NRC Adoption of Proposed Docketing Process for Forthcoming Revs to C-E Std SAR1987-09-18018 September 1987 Requests NRC Adoption of Proposed Docketing Process for Forthcoming Revs to C-E Std SAR 1990-08-28
[Table view] |