Cyber Security Inspection Report 05000348/2019412 and 05000364/2019412
ML19288A279
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/11/2019
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Kharrl C
Southern Nuclear Operating Co
References
IR 2019412
Download: ML19288A279 (3)


Text

ber 11, 2019

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - CYBER SECURITY INSPECTION REPORT 05000348/2019412 AND 05000364/2019412

Dear Mr. Kharrl:

On August 29, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant and discussed the results of this inspection with Mr. Delson Erb and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Farley.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC Resident Inspector at Farley. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8 Enclosure:

As stated cc w/ encl: Distribution via LISTSERV ML19288A279 SUNSI Non-Sensitive Publicly Available Review Sensitive Non-Publicly Available OFFICE RII/DRS RII/DRS RII/DRS RII/DRP NSIR/CSB NSIR/CSB NAME S. Shaeffer D.Strickland L. Jones A. Blamey A. Konkal L. Pitzer DATE 10/ 11 /2019 10/10/2019 10/8/2019 10/ 10/2019 10/10 /2019 10/10/2019