ML17334B288

From kanterella
Revision as of 12:34, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec 4.1.1.5,reducing Temp from 551 F to 545 F When Reactor Coolant Sys Average Temp Must Be Monitored Every 30 Minutes
ML17334B288
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/30/1988
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334B287 List:
References
AEP:NRC:1067A, NUDOCS 8901120449
Download: ML17334B288 (3)


Text

ATTACHMENT 2 TO AEP:NRC:1067A PROPOSED REVISED TECHNICAL SPECIFICATION PAGE 8901120449 0 PDR AGOCK P

REACTIVITY CONTROL SYSTEMS MINIMUM TEMPERATURE FOR CRITICALITY LIMITING CONDITION FOR OPERATION 3.1.1.5 The Reactor Coolant System lowest operating loop temperature (Tavg) shall be > 541 F when the reactor is critical.

APPLICABILITY: Modes 1 and 2*

ACTION:

With a Reactor Coolant System operating loop temperature (Tavg) < 541 0 F, restore (Tavg) to within its limit within 15 minutes or be in HOT STANDBY within the next 15 minutes.

SURVEILLANCE RE UIREMENTS 4.1.1.5 The Reactor Coolant System temperature (Tavg) shall be determined to be > 541 F:

a. Within 15 minutes prior to achieving reactor criticality, and
b. A least once per 30 minutes when the reactor is critical and the Reactor Coolant System Tavg is less than 545 F or when the low Tavg alarm is inoperable.
  • See Special Test Exception 3.10.3

¹With K > 1.0.

D. C. COOK - UNIT 1 3/4 1-6 AMENDMENT NO.

~. pc v