Letter Sequence Request |
---|
EPID:L-2018-LRM-0033, Pre-Submittal Meeting for Full Implementation of Alternative Source Term (Open) |
|
MONTHYEARML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term Project stage: Request ML18215A3752018-08-21021 August 2018 Summary of Pre-Submittal Meeting with Union Electric Company to Discuss an Alternate Source Term License Amendment Request Project stage: Meeting 2018-06-14
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24157A0642024-06-13013 June 2024 Earls 2024 Workshop Presentation ULNRC-06767, Presentation Information for Planned Pre-Application Meeting2022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21211A0712021-07-30030 July 2021 Meeting Slides for Pre-submittal Teleconference to Discuss EP Revision LAR ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21050A2042021-03-31031 March 2021 March 2021 Meeting Slides ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0916002532009-06-0808 June 2009 Summary of Annual Performance Assessment Meeting with Amerenue for Callaway Plant ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0716000102007-06-0707 June 2007 Summary of Meeting with Union Electric Co Re Callaway Annual Performance Assessment ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0613001302006-05-0909 May 2006 Meeting Summary of 05/04/2006 end-of-cycle Performance Assessment ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0330402882003-10-30030 October 2003 Meeting Handout Materials Regarding STARS-IRAG/NRC Meeting to Discuss Topics Taken from the June 10.11, 2003, Workshop ML0319206482003-06-10010 June 2003 Meeting Handouts for STARS-IRAG/NRC Workshop to Discuss Selected Topics Listed in the Agenda Attached to Meeting Notice ML0310604602003-04-15015 April 2003 Meeting Handout to Discuss Licensee'S Program to Replace the Steam Generators at Callaway ML0231200242002-11-0707 November 2002 Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group ML0208705662002-04-15015 April 2002 Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars Activities ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2024-06-13
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24157A0642024-06-13013 June 2024 Earls 2024 Workshop Presentation ULNRC-06767, Presentation Information for Planned Pre-Application Meeting2022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21211A6012021-07-30030 July 2021 Annual Assessment Meeting (Public) ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML12096A3942012-03-14014 March 2012 Enclosure 5: Callaway Public Meeting Slides ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0611002222006-04-18018 April 2006 Summary of Meeting with Union Electric Company Regarding Callaway Plant, Which Discussed Recent Plant Performance and Various Topics ML0533202252005-12-0101 December 2005 Ri Schedule 05- Mcmurtray; Lessons Learned from Security-Based Table Top Drills ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0430903882004-11-0404 November 2004 Docket No. 50-483 - Licensee'S Slides for Meeting Held on November 4, 2004, to Discuss Its Application on the Steam Generators Replacement in Fall 2005 (Tac No. MC4437) ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0408501912004-03-23023 March 2004 Docket No. 50-483 - Slides from Meeting Held on March 23, 2004, to Discuss Licensee'S License Amendment Request Application Dated December 17, 2003 ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0316806062003-07-17017 July 2003 NRC Handout, Slides and Viewgraphs, 103 Pages, S107211 ML0211402982002-04-24024 April 2002 Annual Performance Assessment Meeting for Callaway Plant ML0206503632002-03-0606 March 2002 02-27-02 Callaway/Ameren Ue Meeting Summary 2024-06-13
[Table view] |
Text
Callaway Plant Pre-Submittal Meeting for Full Implementation of Alternative Source Term June 14, 2018 1
Implementation of AST at Callaway Introduction
- Callaway/Zachry Nuclear team
- Roger Wink - Callaway Manager Regulatory Affairs
- Tom Elwood - Callaway Supervisor Regulatory Affairs
- Brian Richardson - Callaway Supervisor Reactor Engineering and Safety Analysis
- Jim Little - Callaway Licensing Engineer
- Jonathan Cordz - Callaway Safety Analysis Engineer
- Jim Harrell - Director of Analysis Division of Zachry Nuclear Engineering, Inc.
- Roger Gorman - Principal Consultant at Zachry Nuclear Engineering, Inc.
June 14, 2018 2
Implementation of AST at Callaway Purpose of amendment request
- Generate margin for allowable unfiltered leakage for Control Room habitability
- Remove requirement for heaters associated with charcoal filters in Control Building pressurization
- Reduce electrical load on emergency buses
- Use lessons learned from inleakage measurement testing to improve alignment of RADTRAD-NAI model with system design and operation.
June 14, 2018 3
Implementation of AST at Callaway Purpose of pre-application review meeting
- Provide overview to NRC
- Promote common understanding
- Obtain feedback from NRC prior to formal submittal June 14, 2018 4
Implementation of AST at Callaway Callaway Plant
Description:
- Westinghouse 4-loop
- 17x17 fuel assembly
- Original Westinghouse Model F Steam Generators replaced with Framatome 73/19T design
- Original SNUPPS design is shared with Wolf Creek, but
- Meteorological data is site specific
- Evolutionary differences have developed with time/age, e.g.,
- TSP for control of sump pH (instead of NaOH)
- Different replacement steam generators
- Callaway has already implemented Dose Equivalent I-131 and Xe-133 in Tech Spec Definitions
- Replacement Reactor Vessel Head installed at Callaway June 14, 2018 5
Scope of work Full scope implementation in accordance with Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors
- with no changes to:
- Radioactive Waste Gas Decay Tank Failure (FSAR section 15.7.1)
- Radioactive Liquid Waste System Leak or Failure (FSAR section 15.7.2)
- Postulated Radioactive Release Due to Liquid Tank Failures (section 2.4.13 of the Site Addendum)
- Environmental Qualification of equipment
June 14, 2018 6
Scope of work (continued)
Events in Regulatory Guide 1.183 appendices plus
- Loss of Non-emergency AC Power (aka, Loss of Offsite Power) in FSAR section 15.2.6
- Letdown Line Rupture in FSAR section 15.6.2 Locations include
- Exclusion Area Boundary (EAB),
- Low Population Zone (LPZ),
- Control Room, and
- Technical Support Center June 14, 2018 7
Scope of work (continued)
Source terms
- Core inventory
- Calculated using ORIGEN-S computer code
- Gap fraction
- In accordance with Footnote 11 provisions for high burnup fuel
- Primary coolant concentrations scaled to Dose Equivalent Iodine and Xenon limits in Tech Specs
- Release of contaminated steam to atmosphere
- For cooldown to conditions to start RHR system for non-LOCA events New site-specific meteorological data
- Years of data analyzed include 2013 to 2016
- On an hourly and in a joint frequency distribution (jfd) basis
- Met data recovery rate was well over 90% for each year
- Data screened and validated with METD-NAI_R2 in accordance with Reg. Guide 1.23, Onsite Meteorological Programs, Rev. 1 June 14, 2018 8
Scope of work (conclusion)
New calculation of X/Q dispersion factors
- Based on new meteorological data
- Consistent with Reg. Guides 1.145 and 1.194 Detailed calculation of post-LOCA sump pH
- Original conclusion associated with switch from NaOH to Trisodium Phosphate (TSP) baskets remains valid.
- Equilibrium sump pH is greater than or equal to 7.1 June 14, 2018 9
Key features Computer Codes
- RADTRAD-NAI
- Input format is not directly compatible with other versions of RADTRAD
- Compartment volume is allowed to be variable with time
- ORIGEN-S
- Fission product inventory in core
- 107 different isotopes are included in source term used by RADTRAD-NAI
- PAVAN-NAI and ARCON96-NAI
- Dispersion factors for offsite and onsite locations
- Consistent with Reg. Guides 1.145 and 1.194
- RETRAN-3D
- Amount of contaminated steam released to atmosphere
- For cooldown to RHR conditions for non-LOCA events
- Flashing fraction for SG tube leakage when top of tube bundle is uncovered
- Break flow and flashing fraction for SG tube rupture event
- MicroShield
- Shine (gamma) dose to control room operators for LOCA June 14, 2018 10
Key features (continued)
Very few Technical Specification changes
- Dose Equivalent iodine and xenon already incorporated (having replaced E-bar) in definitions
- Federal Guidance Report No. 11 and No. 12 already in definitions
- Remove requirement for heaters for charcoal filter in Control Building/Room pressurization
- AST analysis is very conservative in not crediting charcoal filtration in Control Building/Room pressurization
- HEPA filters are not affected and so continue to be credited in Control Building pressurization
- Control Room recirculation is a separate function and its charcoal filtration is retained
- Refine definition of Control Room and Control Building envelope
- Add Equipment Room Envelope/Boundary as new term(s)
- To be established and defined in the Control Room Envelope Habitability Program referenced in Tech. Spec. 5.5.17.
June 14, 2018 11
Key features (continued)
Analysis changes to Current Licensing Basis include:
- More detailed model of Control Room and Control Building
- The Callaway Control Room ventilation system is linked to an unusual extent with associated ventilation in the Control Building that (partially) surrounds it.
- Provides better alignment with system design and operation
- Increased limits on unfiltered inleakage for Control Room habitability
- Trade-off between unfiltered inleakage to the Control Room vs.
inleakage via the Control Building to the Control Room.
June 14, 2018 12
Key features (continued)
Analysis changes to Current Licensing Basis (continued):
- Increased gap fraction for high burnup fuel
- Dose analysis supports currently established limits regarding the number of assemblies and fuel rods that achieve burnup >54 GWD/MTU.
- RETRAN-3D is used to estimate amount of contaminated steam released
- During cooldown to RHR entry conditions for non-LOCA events with Loss of offsite power assumption preventing steam dump to condenser
- replacing manual/hand or spreadsheet calculations
- Track SG secondary side collapsed water level and flashing fraction with RETRAN-3D June 14, 2018 13
Key features (conclusion)
Analysis changes to Current Licensing Basis (conclusion):
- New X/Q dispersion factors
- Switch to TEDE dose
- while FGR No. 11 and No. 12 are already in Technical Specification definitions for dose conversion factors, the basis for results presented in FSAR Chapter 15 changes from thyroid and whole body basis to TEDE June 14, 2018 14
Implementation of AST at Callaway Outline of License Amendment Request package
- 1. Evaluation of the Proposed Changes Attachment A - conformance with Reg. Guide 1.183 Attachment B Reg. Guide 1.145 Attachment C Reg. Guide 1.194 Attachment D RIS 2006-04 Attachment E RIS 2001-19
- 2. Technical Specification Markups
- 3. Technical Specification Bases Page Markups
- 4. FSAR Markups
- 5. Retyped document pages showing changes
Tech. Specs, Tech Spec Bases, and FSAR June 14, 2018 15
Implementation of AST at Callaway Schedule
- Planned submittal date July 23, 2018 June 14, 2018 16
Implementation of AST at Callaway Questions(?)
Any feedback from NRC regarding
- Scope of submittal,
- LAR contents, or
- Regulatory expectations?
Closing Remarks June 14, 2018 17