MONTHYEARML24304B0562024-10-30030 October 2024 Acceptance of LAR to Revise TS to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24284A2822024-10-0707 October 2024 Cover Email Re Monticello SLRA-3rd Round Request for Additional Information ML24254A3932024-08-26026 August 2024 SLRA - 2nd Round Request for Additional Information ML24239A3722024-08-26026 August 2024 SLRA - 2nd Round Request for Additional Information ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24131A0802024-05-10010 May 2024 Final RAI for LAR to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML24036A2462024-04-24024 April 2024 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for Monticello Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML24092A2152024-03-27027 March 2024 Email: Requests for Information to Support Deis ML24068A0612024-03-0707 March 2024 Extension of Audit for License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML24064A1802024-03-0404 March 2024 Acceptance of Relief Request RR-017, Inservice Inspection (ISI) Impracticality During the Fifth Ten-Year Interval ML24036A0932024-02-0202 February 2024 Acceptance of License Amendment Request to Revise TS 5.6.5 and Update PTLR Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data ML24022A0212024-01-20020 January 2024 NRR E-mail Capture - Monticello - Request for Additional Information ISI RR-002 Alternative to Use IWB-2500(f) ML23353A0742023-12-19019 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Proposed Alternative VR-09, Modifications to OMN-17 ML23348A3462023-12-14014 December 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of License Amendment Request to Revise TS 3.8.6, Battery Parameters, SR 3.8.6.6 ML23268A0292023-09-20020 September 2023 SLRA - Requests for Confirmation of Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23249A2092023-09-0606 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23237A4822023-08-25025 August 2023 SLRA - Request for Additional Information - Set 3 - Email from Marieliz Johnson to Shawn Hafen ML23228A1212023-08-16016 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request VR-11 for MO-2397 ML23227A2182023-08-15015 August 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Request RR-002 to Use IWB-2500(f) ML23219A1072023-08-0707 August 2023 SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Shawn Hafen ML23200A3502023-07-19019 July 2023 SLRA - Requests for Additional Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23172A1122023-06-21021 June 2023 SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Christopher Domingos ML23054A3322023-02-23023 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for ISI Program Code of Record ML23053A1362023-02-13013 February 2023 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Relief Request to Use Later Edition of ASME BPV Code, Section XI, for Cisi Program ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML23004A1982023-01-0404 January 2023 NRR E-mail Capture - Draft Request for Additional Information Monticello Nuclear Generating Plant Request Pr 08, HPCI Pump Quarterly Testing ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package ML22175A1602022-06-24024 June 2022 NRR E-mail Capture - RAI Monticello Fuel Oil Storage Tank Inspection ML22181A1962022-06-24024 June 2022 NRR E-mail Capture - Draft RAI Monticello Alternative VR-08 ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22123A2822022-05-0303 May 2022 NRR E-mail Capture - Request for Additional Information Monticello Alternative VR-10, EFCV Testing Frequency ML22101A0712022-04-11011 April 2022 NRR E-mail Capture - Monticello - Acceptance of Requested Licensing Action License Amendment Request to Revise TS 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency ML22089A1302022-03-30030 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Alternative Related Excess Flow Check Valve Testing Frequency ML22082A1812022-03-23023 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-08 Alternative to Adopt ASME OM Code Case OMN-28 ML22075A2612022-03-16016 March 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of VR-07 Alternative Related to MOV Testing Per ASME OM Code Case OMN-26 ML22067A2032022-03-0808 March 2022 Audit Plan to Support Review of an Amendment to Transition to Atrium 11 Fuel (Redacted) ML22011A0642022-01-11011 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Support Diesel Generator Fuel Oil Storage Tank Inspection ML22005A3612022-01-0505 January 2022 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pump Vibration Testing Per ASME OM Code Case OMN-22 ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21330A0382021-11-18018 November 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related RHR and RHRSW Pump Testing ML21286A7882021-10-0606 October 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Residual Heat Removal Heat Exchanger Flow Control Valve Stroke Timing ML21256A1892021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Testing the Control Rod Drive Scram Discharge Header Check Valves ML21256A1862021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to HPCI and RCIC Pump Testing ML21256A1882021-09-13013 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Vibration Testing Range for the Sblc Pumps ML21253A2002021-09-10010 September 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Relief Request Alternative Related to Pressure Isolation Valve Testing ML21252A0132021-08-31031 August 2021 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt Advanced Framatome Methodologies ML21130A3022021-05-0707 May 2021 Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System ML21110A7042021-04-20020 April 2021 Response: Monticello Nuclear Plant Outage - Covid Risk to On-Site Employees ML21084A2522021-03-24024 March 2021 NRR E-mail Capture - Revised Review Schedule for Monticello TSTF-505 (EPID L-20200LLA-0062) 2024-08-05
[Table view] |
From: Peter Tam To: Arias, Jesus; Loeffler, Rick; Salamon, Gabor Date: 07/11/2006 10:25:32 AM
Subject: Monticello; Draft RAI on Meterology for Full-Scope AST Application ( TAC
MC8971)
Jay, Rick:
Our reviewer for meterology has developed the following draft RAI questions. Can you discuss these with us in the conference call (about radiological consequences) today? Or would you like to schedule a difference call?
1. Section 4, Atmospheric Dispersion, of the March 7, 2006 NRC Regulatory Issue Summary 2006-04 (RIS 2006-04), Experience with Implementation of Alternative Source Terms, states that valid wind direction data in the ARCON96 format should range from 1E to
360E. Fields of nines (e.g., 999) should be used to indicate invalid or missing data. The staff notes that the Monticello hourly meteorological data for the 1998-2002 period generally contains fields of nines to indicate invalid data, but also has some zeros in the wind direction and wind speed fields. Are these data (i.e., the zeros) valid data? RIS 2006-04 further states that the jfds used as input to the PAVAN computer code should have a large number of wind speed categories at the lower wind speeds in order to produce the best results (e.g., Section
4.6 of NUREG/CR-2858, PAVAN: An Atmospheric Dispersion Program for Evaluating Design Basis Accidental Releases of Radioactive Materials from Nuclear Power Stations, suggests wind speed categories of calm, 0.5, 0.75,1.0, 1.25,1.5, 2.0, 3.0, 4.0, 5.0, 6.0, 8.0 and 10.0
meters per second). What is the wind speed and designation for calm (e.g., less than 0.5 meters per second based upon instrument thresholds)? The staff is attempting to generate a jfd using these categories and is attempting to input valid data only.
2. What wind speed values were used as an input to Midas to define the categories in the Monticello wind speed, wind direction and atmospheric stability joint frequency distributions (jfds) for both the Regulatory Guide 1.21 and non-Regulatory Guide 1.21 tables? For example, if two consecutive categories are defined as 4-7 miles per hour (mph) and 8-12 mph, what is the value defining the lower category (e.g., 7 mph, 7.5 mph, 8 mph)?
3. Please provide the calculations for the atmospheric dispersion factors (/Q values) used in the Monticello alternative source term license amendment request for new /Q values. Also, provide a site plan generally drawn to scale and showing true North, with postulated release/receptor pairs highlighted.
4. Which /Q values were used to model unfiltered inleakage into the control room?
5. Do the accident scenarios and generated /Q values model the limiting doses considering multiple release scenarios (e.g., including those due loss of offsite power or other single failure)?
6. When assessing meteorological factors that may affect secondary containment drawdown capability, is high wind speed, only, the limiting case (e.g., temperature is not a factor)?
This e-mail is intended solely to prepare you and others for the proposed conference call. It does not formally convey an NRC staff position, and it does not formally request for additional information.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
e-mail: pst@nrc.gov Tel.: 301-415-1451 CC: Brown, Leta; Forrest, Edwin; Hart, Michelle; Kotzalas, Margie; Tammara, Seshagiri Mail Envelope Properties
(44B3B4DC.A3C : 12 : 35330)
Subject: Monticello; Draft RAI on Meterology for Full-Scope AST Application (
TAC MC8971)
Creation Date 07/11/2006 10:25:32 AM
From: Peter Tam Created By: PST@nrc.gov Recipients Action Date & Time nmcco.com Transferred 07/11/2006 10:26:23 AM
Gabor.Salamon (Gabor Salamon)
Jesus.Arias (Jesus Arias)
Richard.Loeffler (Rick Loeffler)
nrc.gov OWGWPO01.HQGWDO01 Delivered 07/11/2006 10:25:40
AM
LAB2 CC (Leta Brown) Opened 07/11/2006 11:45:40
AM
nrc.gov OWGWPO02.HQGWDO01 Delivered 07/11/2006 10:25:41 AM
EBF CC (Edwin Forrest) Opened 07/11/2006 12:47:23 PM
nrc.gov OWGWPO04.HQGWDO01 Delivered 07/11/2006 10:25:40
AM
MLH3 CC (Michelle Hart) Opened 07/11/2006 11:50:57 AM
MXK5 CC (Margie Kotzalas) Opened 07/11/2006 12:42:08 PM
nrc.gov TWGWPO02.HQGWDO01 Delivered 07/11/2006 10:25:32 AM
SRT CC (Seshagiri Tammara) Opened 07/11/2006 11:56:50
AM
Post Office Delivered Route nmcco.com OWGWPO01.HQGWDO01 07/11/2006 10:25:40 AM
nrc.gov OWGWPO02.HQGWDO01 07/11/2006 10:25:41 AM
nrc.gov OWGWPO04.HQGWDO01 07/11/2006 10:25:40 AM
nrc.gov TWGWPO02.HQGWDO01 07/11/2006 10:25:32 AM
nrc.gov Files Size Date & Time MESSAGE 4455 07/11/2006 10:25:32 AM
Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed Subject: No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
|
---|
|
list | | | Topic |
---|
RIS 2006-02, Good Practices for Licensee Performance During the Emergency Preparedness Component of Force-On-Force Exercises | 23 February 2006 | Backfit | RIS 2006-02, Good Practices For Licensee Performance During The Emergency Preparedness Component of Force-On-Force Exercises | 23 February 2006 | Backfit | RIS 2006-04, Draft RAI on Meteorology for Full-Scope AST Application | 11 July 2006 | | RIS 2006-07, Proposed Changes to the Safety System Unavailability Performance Indicators | 12 June 2006 | Enforcement Discretion Significance Determination Process Backfit | RIS 2006-08, Publicly Available Cover Letters for Security-Related Inspection Reports | 12 June 2006 | Significance Determination Process Backfit | RIS 2006-08, Publicly Available Cover Letters For Security-Related Inspection Reports | 12 June 2006 | | RIS 2006-09, Nrc'S Procedures for Review of Decommissioning Funding Assurance Reports | 21 June 2006 | Backfit | RIS 2006-09, Nrc'S Procedures For Review of Decommissioning Funding Assurance Reports | 21 June 2006 | | RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions | 30 June 2006 | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Exemption Request Fire Protection Program Backfit Manual Operator Action | RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions | 30 June 2006 | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Exemption Request Fire Protection Program | RIS 2006-12, Us Nuclear Regulatory Commission. NRC Regulatory Issue Summary 2006-12; Endorsement of Nuclear Energy Institute Guidance Enhancements to Emergency Preparedness Programs for Hostile Action. | 19 July 2006 | Safe Shutdown Safeguards Contingency Plan Backfit | RIS 2006-12, Endorsing NEI White Paper, Enhancements to Emergency Preparedness Programs for Hostile Action | 19 July 2006 | Safeguards Contingency Plan Backfit | RIS 2006-13, NRC000046-NRC Regulatory Issue Summary 2006-13, Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture. | 31 July 2006 | Fitness for Duty Temporary Modification Backfit | RIS 2006-13, 2006/07/31-Intervenor-Exhibit 10-Information On The Changes Made To The Reactor Oversight Process To More Fully Address Safety Culture, Regulatory Issue Summary 2006-13, U.S. NRC | 31 July 2006 | Fitness for Duty Backfit | RIS 2006-13, Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture | 31 July 2006 | Fitness for Duty Backfit | RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (c) (2) | 22 September 2006 | Enforcement Discretion Backfit | RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (C) (2) | 22 September 2006 | Enforcement Discretion Backfit | RIS 2006-15, Withdrawn NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations | 14 August 2006 | Generic Fundamentals Examination Backfit | RIS 2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specification, with Respect to Limiting Safety System Settings (LSSS) During Periodic Testing and Calibration of Instrument Channels | 24 August 2006 | Functionality Assessment Backfit Operability Assessment | RIS 2006-18, Wits200500191/Wits200500192/Wits2005193 - NRC Regulatory Issue Summary 2006-18 Requesting Exemption From the Public Dose Limits for Certain Caregivers of Hospital Patients | 31 August 2006 | Exemption Request | RIS 2006-18, WITS200500191/WITS200500192/WITS2005193 - NRC Regulatory Issue Summary 2006-18 Requesting Exemption from the Public Dose Limits for Certain Caregivers of Hospital Patients | 31 August 2006 | Enforcement Discretion Exemption Request | RIS 2006-19, Availability of Guidance on Radioactive Seed Localization. | 14 September 2006 | Backfit | RIS 2006-20, Guidance for Receiving Enforcement Discretion When Concentrating Uranium at Community Water Systems | 14 December 2011 | Enforcement Discretion Pandemic Backfit | RIS 2006-20, Enclosure 2 - List of Recently Issued Generic Communication | 14 September 2006 | | RIS 2006-21, Improving Response Capabilities Through the Use of an Incident Response Electronic Library | 28 September 2006 | Reactor Vessel Water Level Severe Accident Management Guideline Backfit Siren | RIS 2006-22, Lessons Learned from Recent 10 CFR Part 72 Dry Cask Storage Campaign | 15 November 2006 | Safe Shutdown Exemption Request Control of Heavy Loads Fuel cladding Backfit | RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (VAC) Systems Housed in Emergency Diesel Generator (EDG) Rooms | 6 December 2006 | | RIS 2006-23, Post-Tornado Operability of Ventilating and Air-Conditioning (Vac) Systems Housed in Emergency Diesel Generator (EDG) Rooms | 6 December 2006 | Earthquake Backfit | RIS 2006-25, Requirements for the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 Ad 32.51a | 7 December 2006 | Tritium Exit Sign | RIS 2006-25, Requirements For the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 Ad 32.51A | 7 December 2006 | Tritium Exit Sign | RIS 2006-26, SECY-06-0248 Enclosure 2 - Regulatory Issue Summary 2006-26, Training and Experience and Grandfather Provisions for Authorized Medical Physicists Under 10 CFR Part 35 | 7 December 2006 | | RIS 2006-26, Training and Experience and Grandfather Provisions for Authorized Medical Physicists Under 10 CFR 35 | 7 December 2006 | Enforcement Discretion | RIS 2006-27, Availability of NRC 313A Series of Forms and Guidance for Their Completion | 27 June 2007 | Brachytherapy TheraSphere |
|
---|