Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21028A3902021-01-29029 January 2021 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21012A3412021-01-22022 January 2021 Requests for Confirmation of Information for the Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information ML20316A0422020-11-10010 November 2020 NRR E-mail Capture - FW: Draft RAI for North Anna Unit 2 Steam Generator Tube Inspection Report (ML19179A075) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20125A0762020-05-0101 May 2020 NRR E-mail Capture - Draft RAI Related to Revised Reactor Vessel Material Surveillance Capsule Withdrawal Schedule Dominion Energy Virginia North Anna Power Station Units 1 and 2 (L-2020-LLL-0038) ML20113A5792020-04-21021 April 2020 NRR E-mail Capture - Draft RAI North Anna Fifth 10-year Interval Relief Request (L-2020-LLR-0023) ML19354B6142019-12-20020 December 2019 NRR E-mail Capture - Draft RAI for North Anna Relief Request P-9 ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19191A2512019-07-10010 July 2019 NRR E-mail Capture - Request for Additional Information Open Phase Condition LAR ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19108A1902019-04-18018 April 2019 Emergency Preparedness Program Inspection Request for Information ML19060A2432019-03-0101 March 2019 Related to License Amendment Request to Address Open Phase Conditions ML18337A1312018-11-29029 November 2018 NRR E-mail Capture - North Anna SPRA (Fukushima 50.54f) Audit Follow-Up Clarification Question on Plant Modifications 2023-09-14
[Table view] |
Text
January 20, 2006Virginia Electric and Power CompanyATTN:Mr. David A. ChristianSenior Vice President and Chief Nuclear OfficerInnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
NORTH ANNA POWER STATION, UNIT 1 - NOTIFICATION OF INSPECTIONAND REQUEST FOR INFORMATION
Dear Mr. Christian:
On or about March 20-31, 2006, the NRC will perform the baseline inservice inspection (NRCProcedure 71111.08) at the North Anna Power Station, Unit 1. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up to date, andcomplete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.We have discussed the schedule for these inspection activities with your staff and understandthat our regulatory contact for this inspection will be Jay Leberstein, of your organization. Ifthere are any questions about this inspection or the material requested, please contact the leadinspector Kim Van Doorn at (404) 562-4643 (pkv@nrc.gov).In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/Mark S. Lesser, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-338License No. NPF-4
Enclosure:
(See next page)
VEPCO2
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUESTcc w/encl:Chris L. Funderburk, Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail DistributionJack M. DavisSite Vice President North Anna Power Station Electronic Mail DistributionExecutive Vice PresidentOld Dominion Electric Cooperative Electronic Mail DistributionCounty AdministratorLouisa County
P. O. Box 160 Louisa, VA 23093Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Electronic Mail DistributionAttorney GeneralSupreme Court Building 900 East Main Street Richmond, VA 23219
_________________________OFFICERII:DRSRII:DRSRII:DRPSIGNATURE/RA//RA//RA/NAMEPVanDoorn:pmdMLesserKLandisDATE1/19/061/19/061/19/061/ /20061/ /20061/ /20061/ /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO INSERVICE INSPECTION DOCUMENT REQUESTInspection Dates:March 20-31, 2006 Inspection Procedures:IP 7111108 "Inservice Inspection Activities" Inspectors:Kim Van Doorn, (404) 562-4643 (pkv@nrc.gov)Alex Vargas, (404) 562-4657 (aav@nrc.gov)A.Information Requested for the In-Office Preparation WeekThe following information should be sent to the Region III office in hard copy (orelectronic format CD - preferred), in care of K. Van Doorn by February 22, 2006, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below andrequest a list of additional documents needed on-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. All information requests relate to Unit 1 unless otherwise stated. If you have any questions regarding this information, please contact the inspector as soon as possible.1)A detailed schedule of:a) Nondestructive examinations (NDE) planned for Class 1 & 2 systems andcontainment, performed as part of your ASME Code ISI Program during the scheduled inspection weeks. b) Vessel head examinations which fulfill NRC commitments made in response toNRC Bulletin 2002-02, NRC Order EA-03-009 or are voluntary.c) Steam Generator (SG) tube inspection and repair activities for the upcoming outage. d) Inspections of Alloy 82/182/600 locations2)A copy of the NDE procedures used to perform the examinations identified in A.1(including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of theASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers). 3)A copy of:a) ASME Section XI, Code Relief Requests applicable to the examinationsidentified in A(1).
2b) Correspondence with the NRC related to NRC Bulletin 2002-01 relative to thegeneral boric acid inspection program and any additional response(s) to RAI requests regarding the boric acid inspection program.4)A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,visual (VT-1, VT-2, VT-3)) which have identified recordable indications on Code Class 1
& 2 systems since the beginning of the last refueling outage. Also, identify the NDEexaminations with recorded indications in the vessel head penetration nozzles which have been accepted for continued service.5)List with short description of the welds in Code Class 1 and 2 systems whic h have beenfabricated due to component repair/replacement activities since the beginning of the last refueling outage or planned during the upcoming outage and identify the system, weldnumber and reference applicable documentation.6)If reactor vessel weld examinations required by the ASME Code are scheduled to occurduring the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination.7)List with description of ISI and SG related issues (e.g. list based upon data basesearches using key words related to piping or SG tube degradation such as cracks, wear,thinning, leakage, rust, corrosion, boric acid or errors in piping/SG tube examinations)entered into your corrective action system since the beginning of the last refueling outage(both Units).8)Copy of any 10 CFR Part 21 reports applicable to your structures systems orcomponents within the scope of Section XI of the ASME Code that have been identifiedsince the beginning of the last refueling outage.9)Copy of SG history documentation given to vendors performing eddy current (ET)testing of the SGs during the upcoming outage.10)Copy of procedure containing screening criteria used for selecting tubes for in-situpressure testing and the procedure to be used for in-situ pressure testing.11)Copy of previous outage SG tube operational assessment completed following ET of theSGs.12)Copy of the document defining the planned ET scope for the SGs and the scopeexpansion criteria which will be used. Also, identify and describe any deviations in thisscope or expansion criteria from the EPRI Guidelines. 13)Copy of the document describing the ET probe types, and ET acquisition equipment tobe used, including which areas of the SG (e.g., top of tube sheet, U-bends) each probe will be used in. Also, provide your response letter(s) to Generic Letters 95-03, 95-05,97-05, 97-06 and 04-01.
314)Identify and quantify any SG tube leakage experienced during the previous operatingcycle. Also provide documentation identifying which SG was leaking and correctiveactions completed or planned for this condition.15)Identify what standards or requirements will be used to evaluate indications identifiedduring NDE examinations of the reactor vessel head or pressurizer. (e.g. the specific industry or procedural standards which will be used to evaluate potential leakageindications. Including any plans to use chemical testing of leakage related deposits with applicable acceptance standards/criteria (e.g. 4 to 1 boron to lithium ratio, isotopic (CS 137/134 ratio) type analysis to date deposits).16)If available electronically, please also provide a copy of your most current revision of the ISI Program Manual and Plan for this Interval. Can be provided during the first on site day if not available electronically. 17)List of any temporary non-code repairs in service.
18)List of known locations that have pin-hole leaks, ASME Class 1, 2, 3.
19)Please provide names and numbers for the following program leads:ISI contacts (Examination, planning)Containment Exams Snubbers and Supports Repair and Replacement program manager Site Welding Engineer Licensing contacts20)Copy of the plant procedures used to perform inspections to identify reactor coolantsystem leaks or boric acid deposits and the procedures for resolution of leaks or boricacid deposits.21)Documentation of corrective action initiated and completed to address weaknesses inthe boric acid inspection process resulting from the NRC Finding identified during thelast Unit 2 outage involving a failure to identify locations of boric acid leakage. B.Information to be provided on-site to the inspector (March 20, 2006):
1)For welds selected by the inspector from A.5 above (this selection will be provi ded bythe inspector after review of the list), provide copies of the following documents:a)Document of the weld number and location (e.g., system, train, branch);b)Document with a detail of the weld construction; c)Applicable Code Edition and Addenda for weldment; d)Applicable Code Edition and Addenda for welding procedures; e)Applicable weld procedures (WPS) used to fabricate the welds; f)Copies of procedure qualification records (PQRs) supporting the WPS onselected welds; 4g)Copies of mechanical test reports identified in the PQRs above;h)Copies of the nonconformance reports for the selected welds; i)Radiographs of the selected welds and access to equipment to allow viewingradiographs; andj)Copies of the preservice examination records for the selected welds.2)For the ISI related corrective action issues selected by the inspector from A.7 above,which will be provided by the inspector later, provide a copy of the corrective actionsand supporting documentation.3)For the nondestructive examination reports with relevant indications on Code Class 1 &2 systems selected by the inspector from A.4 above and provided later, provide a copyof the examination records and associated corrective action documents.4)Provide access to NDE personnel qualification and certification records. Also provideaccess to the qualification and certification procedure(s) used to qualify these personnel. 5)Updated schedules for item A.1 (including schedule showing contingency repair plans ifavailable).6)Provide access to information regarding possible repair processes (including drawings)for use on the vessel head nozzles and identify the repair procedures to be used. Also include access to any documented NRC reviews/evaluation/approval of these repairprocesses.7)Provide a copy of the EPRI Technique Specification Sheets which support qualificationof the ET probes to be used during the upcoming SG tube inspections.8)Provide a copy of the guidance to be followed if a loose part or foreign material isidentified in the SGs.9)Copy of document describing actions to be taken if a new SG tube degradationmechanism is identified.10)Identify the types of SG tube repair processes which will be implemented for defectiveSG tubes (including any NRC reviews/evaluation/approval of this repair process). Provide the flaw depth sizing criteria to be applied for ET indications identified in the SG tubes.11)Ready access to the Editions of the ASME Code (Sections V, IX and XI) applicable tothe inservice inspection program and the repair/replacement program. Ready access to the EPRI and industry standards referenced in the procedures used to perform the SG tube eddy current examination. (e.g. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location).
5Inspector Contact Information:K. Van Doorn, Senior Reactor Inspector(404) 562-4643, pkv@nrc.govMailing AddressUS NRC Region 2Attn: Kim Van Doorn 61 Forsyth Street, SW Atlanta, GA 30303 Suite 24T144