Category:E-Mail
MONTHYEARML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) ML21140A3712021-05-19019 May 2021 FOF Discussion ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D 2024-01-18
[Table view] Category:Inspection Plan
MONTHYEARIR 05000338/20230052023-08-25025 August 2023 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338 2023005 and 05000339 2023005) IR 05000338/20220062023-03-0101 March 2023 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2022006 and 05000339/2022006 ML23046A1952023-02-15015 February 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000338/20220052022-08-30030 August 2022 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 Reports 05000338/2022005 and 05000339/2022005 IR 05000338/20210062022-03-0202 March 2022 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 (Reports No. 05000338/2021006 and 05000339/2021006) IR 05000338/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2021005 and 05000339/2021005) ML21165A1222021-06-14014 June 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML21154A0662021-06-0202 June 2021 Notification of North Anna Power Station, Units 1 & 2 - Design Bases Assurance Inspection (Team) U.S. Nuuclear Regulatory Commission Inspection Report 05000338/2021010 and 05000339/2021010 ML21145A0052021-05-25025 May 2021 2021003 North Anna Nuclear Power Station Document Request Letter ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 IR 05000338/20200062021-03-0303 March 2021 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 NRC Inspection Reports 05000338/2020006 and 05000339/2020006 ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information IR 05000338/20200052020-08-24024 August 2020 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2020005 and 05000339/2020005) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20182A0332020-06-30030 June 2020 Notification of Inspection and Request for Information ML20175A5532020-06-23023 June 2020 Emergency Preparedness Exercise Inspection Request for Information IR 05000338/20190062020-03-0303 March 2020 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2019006 and 05000339/2019006 ML19326C9882019-11-21021 November 2019 Requalification Program Inspection North Anna Power Station IR 05000338/20190052019-08-27027 August 2019 Updated Inspection Plan for North Anna Power Station, Units 1 and 2, NRC Report 05000338/2019005 and 05000339/2019005 ML19235A1992019-08-23023 August 2019 Baseline Inservice Inspection RFI IR 05000338/20180062019-03-0404 March 2019 Annual Assessment Letter for North Anna, Units 1 and 2; NRC Inspection Report 05000338/2018006 and 05000339/2018006 ML19030A6962019-01-29029 January 2019 ISI RFI IR 05000338/20180052018-08-23023 August 2018 Updated Inspection Plan for North Anna Power Station Units 1 and 2, NRC Report 05000338/2018005 and 05000339/2018005 ML18059A0942018-02-28028 February 2018 EOC Assessment Letter IR 05000338/20170052017-08-21021 August 2017 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 - Report 05000338/2017005 and 05000339/2017005 ML17156A0662017-06-0202 June 2017 Notification of Inspection and Request for Information IR 05000338/20160062017-03-0101 March 2017 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2016006 and 05000339/2016006 IR 05000338/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Report 05000338, 339/2016005 ML16222A9132016-08-0808 August 2016 Notification of Inspection and Request for Information IR 05000338/20150062016-03-0202 March 2016 Annual Assessment Letter for North Anna Power Station Units 1 and 2 - NRC Inspection Report 05000338/2015006 and 05000339/2015006 ML16013A0622016-01-12012 January 2016 North Anna Power Station, Unit 2 - Notification of Inspection and Request for Information IR 05000338/20150052015-09-0101 September 2015 Mid-Cycle Letter for North Anna Power Station, Units 1 and 2 - NRC Assessment Report 05000338/2015005 and 05000339/2015005 IR 05000338/20140012015-03-0404 March 2015 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2014001 and 05000339/2014001 ML14245A1902014-09-0202 September 2014 Mid-Cycle Ltr 2014 IR 05000338/20130012014-03-0404 March 2014 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2013001 and 05000339/2013001 ML14022A0412014-01-21021 January 2014 TI-182 Phase 2 RFI Final ML13246A1322013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000338/20120012013-03-0404 March 2013 Annual Assessment Letter North Anna, Units 1 and 2, 05000338/2012001 and 05000339/2012001 ML13032A5532013-02-0101 February 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML13037A1712013-02-0101 February 2013 Notification of Inspection and Request for Information ML12248A1102012-09-0404 September 2012 Mid Cycle Assessment Letter North Anna 2012 ML12235A2912012-08-17017 August 2012 IR 05000338-12-012, 05000339-12-012, on 10/28/2011, North Anna Power Station, Units 1 & 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206506412012-03-0505 March 2012 End of Cycle Assessment Report 22 ML1124400992011-09-0101 September 2011 Report 22, Inspection/Activity Plan ML1106303432011-03-0404 March 2011 Inspection/Activity Plan 03/01/2011 - 06/30/2012, EOC Report 22 ML1024402812010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan ML1006202772010-03-0303 March 2010 Inspection/Activity Plan Report 22 2010001 ML0924405332009-09-0101 September 2009 Inspection/Activity Plan 09/01/2009 - 12/31/2010 2023-08-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21028A3902021-01-29029 January 2021 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21012A3412021-01-22022 January 2021 Requests for Confirmation of Information for the Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information ML20316A0422020-11-10010 November 2020 NRR E-mail Capture - FW: Draft RAI for North Anna Unit 2 Steam Generator Tube Inspection Report (ML19179A075) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20125A0762020-05-0101 May 2020 NRR E-mail Capture - Draft RAI Related to Revised Reactor Vessel Material Surveillance Capsule Withdrawal Schedule Dominion Energy Virginia North Anna Power Station Units 1 and 2 (L-2020-LLL-0038) ML20113A5792020-04-21021 April 2020 NRR E-mail Capture - Draft RAI North Anna Fifth 10-year Interval Relief Request (L-2020-LLR-0023) ML19354B6142019-12-20020 December 2019 NRR E-mail Capture - Draft RAI for North Anna Relief Request P-9 ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19191A2512019-07-10010 July 2019 NRR E-mail Capture - Request for Additional Information Open Phase Condition LAR ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19108A1902019-04-18018 April 2019 Emergency Preparedness Program Inspection Request for Information ML19060A2432019-03-0101 March 2019 Related to License Amendment Request to Address Open Phase Conditions ML18337A1312018-11-29029 November 2018 NRR E-mail Capture - North Anna SPRA (Fukushima 50.54f) Audit Follow-Up Clarification Question on Plant Modifications 2023-09-14
[Table view] |
Text
ML20223A341 01234ÿ6778ÿ9 3 2ÿÿ88317ÿ983ÿ7 317
ÿ !ÿ"# !$%&'%( )*
+,-ÿ./01/2121ÿ3425ÿ67 819ÿ !ÿ:;(ÿ<!$%=;(&> ?@@(A%'?Bÿ"!$%=;(&> ?@@(A%'?*
5ÿ;$$;',?$Cÿ<D3ÿB E6:Fÿ2121G110ÿ#HIJ6==)>%=>KL MNOP
ÿ RSTÿNUTÿVTSWXNUYÿSZ[X\ÿS]^_[`aSYPÿbNUÿcX\\ÿOSÿd_SÿVTXZ[TbÿVNXdÿNeÿ^N`d[^dÿeNTÿd_SÿUV^NZXaÿf[gX[dXN`
h[eSdbÿiYVS^dXN`ÿ[dÿjNTd_ÿk``[ÿXÿhSVdSZOSTlÿÿkdd[^_SgÿXYÿd_SÿiXdX[\ÿfSmUSYdÿeNTÿieNTZ[dXN`lÿÿn_S TSmUSYdÿX^\UgSYÿd_SÿgN^UZS`dYÿeNTÿiYVS^dXN`ÿRTN^SgUTSYÿoiRYpÿqrrstlurPÿqrrstluvPÿqrrstlutP qrrstluwÿoT[gÿ_[x[TgYPÿ[XTONT`SPÿN^^UV[dXN`[\ÿgNYSPÿyÿXYdTUZS`dYpPÿ[`gÿd_Sÿ[VV\X^[O\SÿVNTdXN`YÿNe qrrwrÿoRizpl
ÿ kdÿd_XYÿVNXdÿiÿgNÿNdÿ{`NcÿS][^d\bÿ_NcÿXdÿcX\\ÿS`gÿUVÿcNT{XaÿNUdPÿOUdÿd_SÿXYVS^dXN`ÿcX\\ÿZNYdÿ\X{S\b X^\UgSÿYNZSÿeNTZÿNeÿ_bOTXgÿlN`}YXdSlÿ[`gÿlTSZNdSlÿXYVS^dXN`lÿÿhX^SÿdcNÿNeÿd_SÿeNUTÿiRYÿTSmUXTSÿ[ÿ\[TaS
`UZOSTÿNeÿN`}YXdSÿc[\{ÿgNc`Yÿ[`gÿNOYSTW[dXN`[\ÿY[ZV\SYPÿ[dÿ\S[YdÿdcNÿNeÿd_Sÿd_TSSÿ[YYXa`SgÿXYVS^dNTY cX\\ÿVTNO[O\bÿSSgÿdNÿOSÿN`}YXdSÿd_SÿS`dXTSÿcSS{ÿNeÿ~?rt}~?r?sulÿÿn_SÿcSS{YÿOSeNTSÿ[`gÿ[edSTÿcX\\ÿOS UYSgÿdNÿ^NZV\SdSÿTSZNdSÿO[YS\XSÿXYVS^dXN`ÿ[^dXWXdXSYlÿ
ÿ hX^Sÿd_SÿdTS`gÿXÿzi}r~ÿ^[YSYÿ^NU\gÿ[eeS^dÿdT[WS\ÿ[`gÿ[^^SYYXOX\XdbÿdNÿd_SÿYXdSÿOSdcSS`ÿNcÿ[`g hSVdSZOSTPÿV\S[YSÿ{SSVÿUYÿXeNTZSgÿNeÿ[`bÿ[gWSTYSÿ\N^[\ÿzi}r~ÿdTS`gYPÿ[`gÿXeÿd_STSÿ[TSÿ[`b
^_[`aSYÿXÿYXdSÿ[^^SYYÿTSmUXTSZS`dYl
ÿ R\S[YSÿ\SdÿZSÿ{`NcÿXeÿbNUÿ_[WSÿ[`bÿmUSYdXN`Yl
ÿ fSa[TgYP
ÿ MNO
ÿ
ÿÿÿÿ hjf?f}ii?fh?Mv
[TmUXYÿ`SÿnNcSTPÿhUXdSÿrsuu stwÿRS[^_dTSSÿS`dSTÿkWS`USPÿj kd\[`d[Pÿkÿvuvuv}rswq otutpÿ~~q}twuÿ?ÿfNOSTdlS\\`ST`T^laNW
North Anna Power Station Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2020003 During the week of September 14 - 18, 2020, the NRC will perform a baseline Radiation Safety Inspection at the North Anna Power Station (NRC Inspection Procedures 71124.01, 71124.03, 71124.04, 71124.05, and 71151).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 4, 2020.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Engineering Branch 3 Branch Chief, Binoy Desai, at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading- rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational and Public Radiation Safety Cornerstones Inspection Dates: September 14 - 18,02 Documents Due to Region II by: September 4, 2020 Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.03 In-plant Airborne Radioactivity Control and Mitigation IP 71124.04 Occupational Dose Assessment IP 71124.05 Radiation Monitoring Instrumentation IP 71151 Performance Indicator Verification Lead Inspector and Mailing Address:
Robert Kellner U.S. Nuclear Regulatory Commission Senior Health Physicist Region II US NRC Region II ATTN: Robert Kellner (404) 997-4508 245 Peachtree Center Ave., N.E Robert.Kellner@nrc.gov Suite 1200 Atlanta, GA 30303 Note: The current version of these documents is expected unless specified otherwise. Secure file server access (Certrec, SharePoint, etc.), or electronic media (CD/DVD), is preferred. To the extent possible, please organize the information as it is arranged below. Experience has shown that poorly organized files can lead to a less efficient inspection and places additional burden on licensee staff. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector. To the extent possible, please organize the information as it is arranged below. Pay attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Documentation for these inspection procedures, are requested from April 1, 2018 to present, unless otherwise specified. Pay attention to the date ranges for the items requested as they may change from item to item. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review. The NRC requests that these documents be provided to the inspectors no later than September 4, 2020.
Miscellaneous
- 1. Plant Management, Radiation Protection, and Chemistry organizational charts
- 2. List of primary contacts for each inspection area w/phone numbers
- 3. Corrective Action Program (CAP) procedure(s)
- 4. List of radiation protection procedures, including title and number
- 5. Most recent 10 CFR 61 analysis for the DAW waste stream
- 6. Outage schedule, including work activities to be conducted during the week of the inspection (e.g. Gantt chart or similar list)
Page 2 of 6
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last inspected August 2019)
- 1. List of outage & active Radiation Work Permits (RWPs) including dose and dose rate limits).
- 2. Procedures related to RP controls (e.g. posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, ISFSI Controls, etc.)
- 3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow-up, etc.)
- 4. Most recent sealed source inventory record
- 5. Last two survey records of the ISFSI
- 6. ISFSI perimeter TLD results for the 3 most recent monitoring periods.
- 7. Copies of the As Low As Reasonably Achievable (ALARA) planning and post job reviews conducted for the last two ISFSI campaigns.
- 8. All self-assessments or audits covering radiological hazard assessment and exposure controls and HP controls since August 1, 2019 (if none, then provide the two most recent).
- 9. Corrective Action Program (CAP) documents (CR, NRC, AR, etc.) related to RP controls (e.g., radworker error, HP technician error, posting issues, radioactive source controls, HRA/LHRA/VHRA issues, survey problems, etc.) generated since August 1, 2019. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last inspected April 2018)
- 1. Procedures related to airborne monitoring and control (e.g. use of purge systems, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of CAMs, air sampling guidance, Alpha air sampling, etc.), as applicable
- 2. Procedures related to the use of respiratory protection devices, (e.g. SCBA, TEDE-ALARA guidance, PAPRs, storage, maintenance, training, QA, fit-testing, etc.)
- 3. Copy of the last 2 grade D air testing certificates for each supplied air system and SCBA filling station
- 4. Documentation of the last 2 surveillances performed on SCBAs available for emergency use, and negative pressure respirators designated as in storage but available for use.
- 5. Two most recent surveillances that verify the flow rates for the following ventilation systems:
a) Auxiliary Building Ventilation System b) Decontamination and Waste Solidification Building Ventilation c) Fuel Handling Building Exhaust System
- 6. Two most recent HEPA filter DOP and charcoal test results for the following ventilation systems:
a) Main Control Room and Emergency Switchgear Room Emergency Ventilation System (MCR/ESGR) b) Auxiliary Building Ventilation System
- 7. Most recent audit or self-assessment covering airborne controls and respiratory protection
- 8. List of CRs related to airborne monitoring and respiratory protection since April 1, 2018.
This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
- 9. Available for onsite review during inspection a) Inventory, inspection and maintenance records for respiratory protection devices and SCBA equipment b) Training records, including fit tests, for SCBA qualified individuals Page 3 of 6
c) List of all licensed operators qualified to wear an SCBA d) List of site ERO personnel qualified to wear an SCBA e) List of all RP personnel qualified to wear an SCBA f) Training/qualification certificates for all onsite and/or vendor personnel qualified to repair SCBA that performed maintenance or repairs from April 1, 2018 to present.
71124.04 - Occupational Dose Assessment (Last inspected April 2018)
- 1. Procedures related to occupational dose assessment (e.g. dosimetry issuance and use, unusual dosimetry occurrences, multi-badging/extremity dosimetry/badge relocation, Effective Dose Equivalent, personnel contamination events, storage/care of personal dosimeters, in-vivo and in-vitro internal dose assessment, skin dose assessment, QC for whole body counter, use of passive monitoring if applicable, declared pregnant workers)
- 2. NVLAP accreditation documentation for 2018, 2019, and the current dosimetry used by the site
- 3. List of all positive whole body counts, in vitro, or air sampling analyses which resulted in a CEDE equal to or exceeding 10 millirem since April 1, 2018. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection]
- 4. List of all Level III personnel contamination events identified since April 1, 2018. [Note:
only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection.]
- 5. Most recent neutron characterization (including the ISFSI area)
- 6. Most recent alpha characterization
- 7. Last 18 months of area TLD results for general plant areas (not REMP TLDs)
- 8. Copies of current WBC libraries (e.g. routine, medical, investigative, etc.)
- 9. Most recent audit or self-assessment of the dosimetry program and/or the most recent audit of the lab that processes site dosimetry
- 10. List of CRs generated since April 1, 2018 for internal or external dosimetry issues/events. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
71124.05 - Radiation Monitoring Instrumentation (Last inspected April 2018)
- 1. Radiation Protection and Maintenance procedures/guidance documents, as applicable, for the following:
a) Calibration and functional test/source checks of portable radiation detection instruments b) Calibration and functional tests of small article monitor, personnel contamination monitor, portal monitor, counting room equipment, electronic alarming dosimeters, whole body counting equipment, and continuous air monitors c) Collection and analysis of high-range, post-accident effluent samples d) Determination of set-points for area radiation monitor, CAM, PCM, PM, and SAM equipment used for area and personnel monitoring equipment e) QA program (inter-laboratory comparison program) for count room instruments
- 2. The last 2 calibration records for each of the following instruments:
a) U-2 Containment High-Range Radiation Monitors (CHRRMS) b) Main Control Room (1-RM-RMS-157) c) Condenser Air Ejector Monitors (1-SV-RM-121) d) Main Steam Line Radiation Monitors (2-MS-RM-270 and 273)
Page 4 of 6
e) Liquid Waste Effluent Monitor (1-LW-RM-110,111) f) Process Vent (1-GW-RM-178-1) [Normal-Range Noble Gas Effluent Monitor]
g) Process Vent (1-GW-RM-178-2) [High Range Noble Gas Effluent Monitor]
- 3. Documentation showing traceability to NIST and/or the primary calibration for the radioactive sources used to calibrate the instruments in item in item 2 above.
- 4. Chart or procedure listing EALs associated with radiation monitors
- 5. Emergency plan documents identifying which radiation monitors are used to determine emergency action levels (EALs).
- 6. Provide a current list of in service (available for use) SAMs, PCMs, PMs, air samplers, continuous air monitors (CAMs), portable radiation detection instruments, counting room (RP and Chemistry), and Whole Body Counters. [Note: The list will be used to select monitors for evaluation during the onsite inspection.)
- 7. Most recent test record of the instrument calibrator (e.g. Shepherd validation testing/dose rate curves).
- 8. Design documents and/or calculations showing how the alarm setpoints for the following instruments are determined:
a) PCMs and PMs at the RCA and Protected Area exit points b) CAMs
- 9. Results of the Inter-Laboratory Comparison Program for 2018 and 2019.
- 10. Most recent Radiation Monitoring System engineering performance review/evaluation or system health report, if applicable.
- 11. Most recent audit or self-assessment covering RP instruments (portables, RCA exit point, WBC, count room). Include any reviews conducted of vendor facilities, as applicable.
- 12. List of CAP documents (CR, NRC, AR, etc.) related to portable instruments, area monitors, CAMs, RCA release point monitors, WBCs, and count room instruments generated since April 1, 2018. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.
71151 - Performance Indicator Verification (Occupational and Public Cornerstones)
(Last inspected March 2019)
- 1. Procedure(s) for gathering and reporting PI data
- 2. List of all CRs related to effluent dose/ODCM issues since March 1, 2019. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
- 3. List of all CRs related to LHRA/VHRA issues or significant (>100 mrem) unintended doses since March 1, 2019. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
- 4. Most recent gaseous and liquid effluent evaluation of dose to the public (year-to-date doses).
- 5. List of electronic dosimeter alarms since March 1, 2019 (dose and dose rate.
Assistance Requested During On-Site Inspection
- Identification of radiological work activities available during the inspection week for observation, including notification of pre-job briefings, notification of risk significant work activities, and location of audio/visual surveillance for remote job coverage.
- Health physics assistance in plant walk-downs and information concerning job coverage of ongoing activities to assess access controls.
Page 5 of 6
Inspector Contact Information: Mailing Address:
Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 6 of 6