ML071000363

From kanterella
Revision as of 03:18, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
04/24/2007 Notice of Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Susquehanna for Calendar Year 2006
ML071000363
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/10/2007
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML071000363 (4)


Text

April 10, 2007MN No. 07-019U.S. NUCLEAR REGULATORY COMMISSIONREGION INOTICE OF LICENSEE MEETINGLicensee:PPL Susquehanna, LLCFacility:Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos.: 50-387 and 50-388 Date/Time:April 24, 2007 at 2:30 p.m.

Location:Susquehanna Energy Information Center634 Salem Boulevard Berwick, PA 18603Purpose:The NRC requested an Annual Assessment Meeting with PPL to discussthe NRC's assessment of the safety performance of the Susquehanna Steam Electric Station for calendar year 2006. The NRC's assessment is documented in a letter dated March 2, 2007.Attendees*:NRC: P. Krohn, Chief, Projects Branch 4, Region IM. Gray, Chief, Technical Support and Assessment Branch, Region I A. Blamey, Senior Resident Inspector, Susquehanna F. Jaxheimer, Resident Inspector, SusquehannaLicensee:B. McKinney, Senior Vice President - Chief Nuclear OfficerR. Saccone, Vice President - Nuclear Operations G. Jones, Vice President - Special Projects and Extended Power Uprate R. Pagodin, General Manager - Nuclear Engineering T. Harpster, General Manager - Plant Support R. Smith, Manager - Site Preparedness and ResponsePublic Participation:This is a Category 1 Meeting. The public is invited to observe thismeeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.NRC's assessment letter can be found in ADAMS with Accession Number ML070610580. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html

.Additional information relative to the NRC's Annual Assessment process and the safetyperformance of Susquehanna Steam Electric Station can be found on the NRC's web site at:

2http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html .Meeting Contact:Paul G. Krohn, Chief, Projects Branch 4610-337-5120 E-mail: pgk1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in thismeeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by April 22, 2007.Approved By: /RA TCS FOR/ Paul G. Krohn, ChiefProjects Branch 4 Division of Reactor Projectscc w/encl:

R. A. Saccone, Vice President - Nuclear Operations T. L. Harpster, General Manager - Plant Support R. D. Pagodin, General Manager - Nuclear Engineering R. R. Sgarro, Manager - Nuclear Regulatory Affairs W. E. Morrissey, Supervisor, Nuclear Regulatory Affairs M. H. Crowthers, Supervising Engineer, Nuclear Regulatory Affairs S. Cook, Manager - Quality Assurance L. A. Ramos, Community Relations Manager, Susquehanna B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation Supervisor - Document Control Services R. W. Osborne, Allegheny Electric Cooperative, Inc.

Director - Bureau of Radiation Protection, PA Department of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee, Sierra Club E. Epstein, TMI-Alert (TMIA)

Correspondence Control Desk AgendaNRC's Annual Assessment Meeting Susquehanna Steam Elec tric Station April 24, 2007Introduction

..................................................NRC (3 minutes)Review of Reactor Oversight Process...............................NRC (5 minutes)National Summary of Plant Performance

............................NRC (7 minutes)Discussion of Susquehanna Performance

..........................NRC (15 minutes)PPL's Response and Remarks....................................PPL (30 minutes)Closing Remarks...............................................NRC (5 minutes)Short Break........................................................(5 minutes)

NRC to address public questions

................NRC/Members of the Public (as needed)

AgendaNRC's Annual Assessment MeetingSusquehanna Steam Electric StationApril 24, 2007Introduction ..............................................................................NRC (3 minutes)Review of Reactor Oversight Process...........................................................NRC (5 minutes)

National Summary of Plant Performance........................................................NRC (7 minutes)Discussion of Susquehanna Performance.......................................................NRC (15 minutes)PPL's Response and Remarks...............................................................PPL (30 minutes)Closing Remarks...........................................................................NRC (5 minutes)

Short Break...................................................................................(5 minutes)

NRC to address public questions ...........................................NRC/Members of the Public (as needed)Distribution w/encl: (VIA E-MAIL) Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO J. Lubinski, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, NRR P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP A. Blamey, DRP, Senior Resident Inspector F. Jaxheimer, DRP, Resident Inspector S. Farrell, Resident OA Region I Docket Room (w/concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I ReceptionistDocument Name: SUNSI Review Complete: TCS (Reviewer's Initials

)DOCUMENT NAME: C:\FileNet\ML071000363.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure

" N" = No copyOFFICERI/DRPRI/DRPRI/DRPNAMERFuhrmeister/TCS FORTSetzerPKrohn/TCS FORDATE04/10 /0704/10 /0704/10 /07OFFICIAL RECORD COPYML071000363