Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415)
ML072900331
Person / Time
Site: Beaver Valley
Issue date: 02/15/2008
From: Nadiyah Morgan
NRC/NRR/ADRO/DORL/LPLI-1
To: Sena P
FirstEnergy Nuclear Operating Co
Morgan Nadiyah, NRR/Dorl, 415-1016
Shared Package
ML072900325 List:
References
TAC MD6415
Download: ML072900331 (3)


Text

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION February 15, 2008

Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 - DISTRIBUTION OF REVISION 2 OF THE NUCLEAR REGULATORY COMMISSION'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Sena:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding SDP detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disks, containing the above documents, are provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609. The enclosure transmitted herewith contains Security-Related information. When separated from enclosure, this document is decontrolled.

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION P. P. Sena III

The information on the enclosed compact disks are designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1016.

Sincerely,

/RA/ Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

Compact Disks with Beaver Valley Power Station, Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only - Security Related Information

cc w/o encls: See next page OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION P. P. Sena III The information on the enclosed compact disks are designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1016.

Sincerely,

/RA/ Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

Compact Disks with Beaver Valley Power Station, Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only - Security Related Information cc w/o encls: See next page

DISTRIBUTION: w/o encls PUBLIC RidsNrrDorlLpl1-1 RidsNrrLASLittle LPLI-1 R/F NMorgan RidsNrrPMJWiebe DWoodyatt MFranovich DWerkheiser, R1 RidsOgcRp RidsRgn1MailCenter RidsAcrsAcnwMailCenter Accession Number:ML072900331 PKG:ML072900325 OFFICE LPL1-1 LPL1-1/PM LPL1-1/LA LPL1-1/BC

NAME DWoodyatt NMorgan SLittle MKowal DATE 10/ 23 /07 10/ 23 /07 10/ 22 /07 2/15/07 OFFICIAL RECORD COPY Beaver Valley Power Station, Unit Nos. 1 and 2 cc: w/o Enclosures

Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308

Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company 76 South Main Street Mail Stop A-GO-14 Akron, Ohio 44308

Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305

Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573

Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr. Harrisburg, PA 17110-9364

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc: w/o Enclosures Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469

Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077