Letter Sequence Other |
|---|
|
Results
Other: ML072831379, ML072840198, ML072890288, ML072890317, ML072900004, ML072900007, ML072900020, ML072900021, ML072900038, ML072900044, ML072900063, ML072900289, ML072900331, ML072900461, ML072900532, ML072900579, ML072900609, ML072900624, ML072910033, ML072910077, ML072950052, ML072970494, ML072980010, ML072980072, ML072980136, ML072980359, ML073030007, ML073040068, ML073040346, ML073040543, ML073050568, ML073050679, ML073130005, ML073170326, ML073200882, ML073200913, ML073240388, ML073240903, ML073270501, ML073270504, ML073520054, ML080140323, ML080160401, ML080240045, ML080360631, ML080790473, ML080850090
|
MONTHYEARML0729000442007-10-13013 October 2007 Letter Transmitting Significance Determination Process Risk-Informed Ltr Project stage: Other ML0729000202007-10-13013 October 2007 Letter Transmitting Significance Determination Process, Rev. 2 Project stage: Other ML0728903172007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729002892007-10-18018 October 2007 (Public)Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000632007-10-18018 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000382007-10-18018 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729000212007-10-18018 October 2007 (Public) Distribution of Rev 2 of the Nuclear Regulatory Commissions Significance Determination Process Risk - Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac MD6415) Project stage: Other ML0729000072007-10-18018 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000042007-10-18018 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0728902882007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables (Tac No. MD6415) Project stage: Other ML0728401982007-10-19019 October 2007 SDP Notebook Transmittal Letter (Public Version) Project stage: Other ML0729803592007-10-22022 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0728313792007-10-23023 October 2007 (Public Version) - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732705042007-10-24024 October 2007 Unit Nos., 1 and 2 (HNP)- Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Tac No. MD6415) Project stage: Other ML0732705012007-10-25025 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 Project stage: Other ML0729800722007-10-26026 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730405432007-10-29029 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, & Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730400682007-10-29029 October 2007 Public-Salem Nuclear Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station-Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Project stage: Other ML0730403462007-10-29029 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730505682007-10-29029 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Letter Project stage: Other ML0730506792007-10-29029 October 2007 Unit No.1-Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Project stage: Other ML0729100332007-10-31031 October 2007 Distribution of Revision of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729005792007-10-31031 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729801362007-10-31031 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729800102007-10-31031 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729704942007-10-31031 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729500522007-10-31031 October 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729100772007-10-31031 October 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730300072007-11-0202 November 2007 (Public) Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729006242007-11-0808 November 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729006092007-11-0808 November 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729005322007-11-0808 November 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729004612007-11-0808 November 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732403882007-11-15015 November 2007 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732409032007-11-15015 November 2007 Public--Millstone Power Station, Unit No. 3 - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732008822007-11-19019 November 2007 Public - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0732009132007-11-19019 November 2007 Public - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0731300052007-12-12012 December 2007 (Public Letter) - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0731703262007-12-14014 December 2007 (Public Letter) - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0735200542007-12-14014 December 2007 Distribution of Revision 2.1 of the NRCs Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-solved Table Project stage: Other ML0801403232008-01-14014 January 2008 (Public Letter) - Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0801604012008-01-16016 January 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0802400452008-01-31031 January 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks and Phase 2 Pre-Solved Tables Project stage: Other ML0729003312008-02-15015 February 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0803606312008-02-26026 February 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0807904732008-04-0909 April 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0808500902008-04-0909 April 2008 Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-Solved Tables (Public Version) Project stage: Other 2007-11-15
[Table View] |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION October 31, 2007 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - DISTRIBUTION OF REVISION 2 OF THE NRCS SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)
Dear Mr. Balduzzi:
In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for James A. FitzPatrick Nuclear Power Plant. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, Significance Determination Process, Appendix A, Determining the Significance of Reactor Inspection Findings for At-Power Situations. SECY-99-007A, Recommendations for Reactor Oversight Process Improvements, sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, Reactor Oversight Process Basis Document. NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.
Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.
The enclosure transmitted herewith contains Security-Related information.
When separated from enclosure, this document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION M.
The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.
If you have any questions, please contact me at (301) 415-2901.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosure:
Compact Disk with James A. FitzPatrick Nuclear Power Plant SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only - Security Related Information cc w/o encl: See next page
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION M.
The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.
If you have any questions, please contact me at (301) 415-2901.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333
Enclosure:
Compact Disk with James A. FitzPatrick Nuclear Power Plant SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only - Security Related Information cc w/o encl: See next page DISTRIBUTION: w/o encl PUBLIC RidsNrrDorlLpl1-1 RidsNrrLASLittle LPLI-1 R/F RidsNrrPMJBoska RidsNrrPMJWiebe DWoodyatt MFranovich Accession Number: ML072910033 Package: ML072910041 OFFICE LPL1-1 LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME DWoodyatt JBoska SLittle MKowal DATE 10/18/07 10/18/07 10/18/07 10/31/07 OFFICIAL RECORD COPY
FitzPatrick Nuclear Power Plant cc:
Mr. Michael R. Kansler President & CEO / CNO Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Kevin J. Mulligan General Manager, Plant Operations Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. James Costedio Manager, Licensing Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
FitzPatrick Nuclear Power Plant cc:
Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Michael Balboni Deputy Secretary for Public Safety State Capitol, Room 229 Albany, NY 12224 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. John P. Spath New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306 Mr. John Doering BWR SRC Consultant P.O. Box 189 Parker Ford, PA 19457