ML072900331

From kanterella
Jump to navigation Jump to search

Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415)
ML072900331
Person / Time
Site: Beaver Valley
Issue date: 02/15/2008
From: Nadiyah Morgan
NRC/NRR/ADRO/DORL/LPLI-1
To: Sena P
FirstEnergy Nuclear Operating Co
Morgan Nadiyah, NRR/Dorl, 415-1016
Shared Package
ML072900325 List:
References
TAC MD6415
Download: ML072900331 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION February 15, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -

DISTRIBUTION OF REVISION 2 OF THE NUCLEAR REGULATORY COMMISSIONS SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Sena:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding SDP detailed in Inspection Manual Chapter 0609, Significance Determination Process, Appendix A, Determining the Significance of Reactor Inspection Findings for At-Power Situations. SECY-99-007A, Recommendations for Reactor Oversight Process Improvements, sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, Reactor Oversight Process Basis Document. NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disks, containing the above documents, are provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.

The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION P. P. Sena III The information on the enclosed compact disks are designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1016.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

Compact Disks with Beaver Valley Power Station, Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -

Security Related Information cc w/o encls: See next page OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION P. P. Sena III The information on the enclosed compact disks are designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1016.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

Compact Disks with Beaver Valley Power Station, Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -

Security Related Information cc w/o encls: See next page DISTRIBUTION: w/o encls PUBLIC RidsNrrDorlLpl1-1 RidsNrrLASLittle LPLI-1 R/F NMorgan RidsNrrPMJWiebe DWoodyatt MFranovich DWerkheiser, R1 RidsOgcRp RidsRgn1MailCenter RidsAcrsAcnwMailCenter Accession Number:ML072900331 PKG:ML072900325 OFFICE LPL1-1 LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME DWoodyatt NMorgan SLittle MKowal DATE 10/ 23 /07 10/ 23 /07 10/ 22 /07 2/15/07 OFFICIAL RECORD COPY OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Beaver Valley Power Station, Unit Nos. 1 and 2 cc: w/o Enclosures Joseph J. Hagan Peter P. Sena III President and Chief Nuclear Officer Site Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SEB1 Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 James H. Lash Senior Vice President of Operations Director, Fleet Regulatory Affairs and Chief Operating Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Mail Stop A-GO-14 76 South Main Street 76 South Main Street Akron, Ohio 44308 Akron, OH 44308 Manager, Site Regulatory Compliance Danny L. Pace FirstEnergy Nuclear Operating Company Senior Vice President, Fleet Engineering Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-A Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Richard Anderson Jeannie M. Rinckel Vice President, Nuclear Support Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company 76 South Main Street Mail Stop A-GO-14 Mail Stop A-GO-14 76 South Main Street Akron, Ohio 44308 Akron, OH 44308 Commissioner James R. Lewis David W. Jenkins, Attorney West Virginia Division of Labor FirstEnergy Corporation 749-B, Building No. 6 Mail Stop A-GO-15 Capitol Complex 76 South Main Street Charleston, WV 25305 Akron, OH 44308 Director, Utilities Department Manager, Fleet Licensing Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Mail Stop A-GO-2 Columbus, OH 43266-0573 76 South Main Street Akron, OH 44308 Director, Pennsylvania Emergency Management Agency Ohio EPA-DERR 2605 Interstate Dr.

ATTN: Zack A. Clayton Harrisburg, PA 17110-9364 P.O. Box 1049 Columbus, OH 43266-0149

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc: w/o Enclosures Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077