Letter Sequence Other |
---|
|
Results
Other: ML072831379, ML072840198, ML072890288, ML072890317, ML072900004, ML072900007, ML072900020, ML072900021, ML072900038, ML072900044, ML072900063, ML072900289, ML072900331, ML072900461, ML072900532, ML072900579, ML072900609, ML072900624, ML072910033, ML072910077, ML072950052, ML072970494, ML072980010, ML072980072, ML072980136, ML072980359, ML073030007, ML073040068, ML073040346, ML073040543, ML073050568, ML073050679, ML073130005, ML073170326, ML073200882, ML073200913, ML073240388, ML073240903, ML073270501, ML073270504, ML073520054, ML080140323, ML080160401, ML080360631, ML080790473, ML080850090
|
MONTHYEARML0729000202007-10-13013 October 2007 Letter Transmitting Significance Determination Process, Rev. 2 Project stage: Other ML0729000442007-10-13013 October 2007 Letter Transmitting Significance Determination Process Risk-Informed Ltr Project stage: Other ML0728902882007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables (Tac No. MD6415) Project stage: Other ML0728903172007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729000042007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000072007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729002892007-10-18018 October 2007 (Public)Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000632007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000212007-10-18018 October 2007 (Public) Distribution of Rev 2 of the Nuclear Regulatory Commission'S Significance Determination Process Risk - Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac MD6415) Project stage: Other ML0729000382007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0728401982007-10-19019 October 2007 SDP Notebook Transmittal Letter (Public Version) Project stage: Other ML0729803592007-10-22022 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0728313792007-10-23023 October 2007 (Public Version) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732705042007-10-24024 October 2007 Unit Nos., 1 and 2 (HNP)- Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Tac No. MD6415) Project stage: Other ML0732705012007-10-25025 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 Project stage: Other ML0729800722007-10-26026 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730506792007-10-29029 October 2007 Unit No.1-Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Project stage: Other ML0730505682007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Letter Project stage: Other ML0730405432007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, & Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730403462007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730400682007-10-29029 October 2007 Public-Salem Nuclear Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station-Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Project stage: Other ML0729005792007-10-31031 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729100332007-10-31031 October 2007 Distribution of Revision of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729801362007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729100772007-10-31031 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729500522007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729800102007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729704942007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730300072007-11-0202 November 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729004612007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729006242007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729006092007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729005322007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0732409032007-11-15015 November 2007 Public--Millstone Power Station, Unit No. 3 - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732403882007-11-15015 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732009132007-11-19019 November 2007 Public - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0732008822007-11-19019 November 2007 Public - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0731300052007-12-12012 December 2007 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0731703262007-12-14014 December 2007 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0735200542007-12-14014 December 2007 Distribution of Revision 2.1 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-solved Table Project stage: Other ML0801403232008-01-14014 January 2008 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0801604012008-01-16016 January 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729003312008-02-15015 February 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0803606312008-02-26026 February 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0807904732008-04-0909 April 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0808500902008-04-0909 April 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-Solved Tables (Public Version) Project stage: Other 2007-11-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
.,VIREGO eF l'All""* nNL USlSl"'kl ! - e*p'i l*RITl -- I ATErDq INIP'FORM/IATIONK UNITED STATES X NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 16, 2008 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)
Dear Mr. McKinney:
In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Susquehanna Steam Electric Station, Units 1 and 2. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.
Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.
The enclosure transmitted herewith contains Security-Related information.
When separated from enclosure, this document is decontrolled.
IOFFICIAL= USE ON~LY BECURITY-JIELATED INFORMATION
OFFICIAL USE.ONLY - SE*URITY -RELATED INFOR. "ATIONW B. T. McKinney The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of FederalRegulationssince it contains security-related information.
If you have any questions, please contact me at (301) 415-1030.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
Compact Disk with Susquehanna Steam Electric Station, Units 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -
Security Related Information cc w/o enc: See next page OFFICIAL USE ONLY SECURITY RELATED INFORMATION '
OFFIIALU*EO,*LY ECURITY, RELATED INF-'OR"M Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Cornelius J. Gannon Bryan A. Snapp, Esq Vice President - Nuclear Operations Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor - Pennsylvania Department of Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC Rachel Carson State Office Building 769 Salem Blvd., NUCSA4 P.O. Box 8469 Berwick, PA 18603-0467 Harrisburg, PA 17105-8469 Michael H. Crowthers Senior Resident Inspector Supervising Engineer U.S. Nuclear Regulatory Commission Nuclear Regulatory Affairs P.O. Box 35, NUCSA4 PPL Susquehanna, LLC Berwick, PA 18603-0035 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Ronald E. Smith 475 Allendale 'Road General Manager - Site Preparedness King of Prussia, PA 19406 and Services PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSA4 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2 National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue Luis A. Ramos State College, PA 16803 Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 OFFICIAL USE ONLY SECURITY RELATED INFORMATIO,-*N,,^4
Package/ML080160366; Non-Public Transmittal Letter:
ML072900434:
Enclosures:
ML071700534, ML071700536: Public Letter/ML080160401 OFFICE LPL1-1/PM LPLI-1/LA LPL1-1/BC NAME RGuzman SLittle MKowal DATE 1/16/08 1/16/08 1/16/08 ..
..