Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
ML080160401
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/16/2008
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To: Mckinney B
Susquehanna
Guzman R, NRR/DORL, 415-1030
Shared Package
ML080160366 List:
References
TAC MD6415
Download: ML080160401 (3)


Text

.,VIREGO eF l'All""*

US nNL lSl"'kl e*p'i l*RITl I

ATErDq INIP'FORM/IATIONK UNITED STATES X

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 16, 2008 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -

DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. McKinney:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Susquehanna Steam Electric Station, Units 1 and 2. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.

The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

IOFFICIAL= USE ON~LY BECURITY-JIELATED INFORMATION

OFFICIAL USE.ONLY - SE*URITY -RELATED INFOR.

"ATION W

B. The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1030.

Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

Compact Disk with Susquehanna Steam Electric Station, Units 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -

Security Related Information cc w/o enc: See next page OFFICIAL USE ONLY SECURITY RELATED INFORMATION '

OFFIIALU*EO,*LY ECURITY, RELATED INF-'OR"M Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Supervisor -

Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale 'Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803 OFFICIAL USE ONLY SECURITY RELATED INFORMATIO,-*N,,^4

Package/ML080160366; Non-Public Transmittal Letter:

ML072900434:

Enclosures:

ML071700534, ML071700536: Public Letter/ML080160401 OFFICE LPL1-1/PM LPLI-1/LA LPL1-1/BC NAME RGuzman SLittle MKowal DATE 1/16/08 1/16/08 1/16/08

....