Letter Sequence Other |
---|
|
Results
Other: ML072831379, ML072840198, ML072890288, ML072890317, ML072900004, ML072900007, ML072900020, ML072900021, ML072900038, ML072900044, ML072900063, ML072900289, ML072900331, ML072900461, ML072900532, ML072900579, ML072900609, ML072900624, ML072910033, ML072910077, ML072950052, ML072970494, ML072980010, ML072980072, ML072980136, ML072980359, ML073030007, ML073040068, ML073040346, ML073040543, ML073050568, ML073050679, ML073130005, ML073170326, ML073200882, ML073200913, ML073240388, ML073240903, ML073270501, ML073270504, ML073520054, ML080140323, ML080160401, ML080360631, ML080790473, ML080850090
|
MONTHYEARML0729000202007-10-13013 October 2007 Letter Transmitting Significance Determination Process, Rev. 2 Project stage: Other ML0729000442007-10-13013 October 2007 Letter Transmitting Significance Determination Process Risk-Informed Ltr Project stage: Other ML0728902882007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables (Tac No. MD6415) Project stage: Other ML0728903172007-10-18018 October 2007 (Public Version) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729000042007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000072007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729002892007-10-18018 October 2007 (Public)Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000632007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729000212007-10-18018 October 2007 (Public) Distribution of Rev 2 of the Nuclear Regulatory Commission'S Significance Determination Process Risk - Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac MD6415) Project stage: Other ML0729000382007-10-18018 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0728401982007-10-19019 October 2007 SDP Notebook Transmittal Letter (Public Version) Project stage: Other ML0729803592007-10-22022 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0728313792007-10-23023 October 2007 (Public Version) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732705042007-10-24024 October 2007 Unit Nos., 1 and 2 (HNP)- Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Tac No. MD6415) Project stage: Other ML0732705012007-10-25025 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 Project stage: Other ML0729800722007-10-26026 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730506792007-10-29029 October 2007 Unit No.1-Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Project stage: Other ML0730505682007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415) Public Letter Project stage: Other ML0730405432007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, & Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730403462007-10-29029 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730400682007-10-29029 October 2007 Public-Salem Nuclear Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station-Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Project stage: Other ML0729005792007-10-31031 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729100332007-10-31031 October 2007 Distribution of Revision of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729801362007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729100772007-10-31031 October 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729500522007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729800102007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729704942007-10-31031 October 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0730300072007-11-0202 November 2007 (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0729004612007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729006242007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729006092007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729005322007-11-0808 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0732409032007-11-15015 November 2007 Public--Millstone Power Station, Unit No. 3 - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732403882007-11-15015 November 2007 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0732009132007-11-19019 November 2007 Public - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0732008822007-11-19019 November 2007 Public - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0731300052007-12-12012 December 2007 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0731703262007-12-14014 December 2007 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved Tables Project stage: Other ML0735200542007-12-14014 December 2007 Distribution of Revision 2.1 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-solved Table Project stage: Other ML0801403232008-01-14014 January 2008 (Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0801604012008-01-16016 January 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0729003312008-02-15015 February 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) Project stage: Other ML0803606312008-02-26026 February 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0807904732008-04-0909 April 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Project stage: Other ML0808500902008-04-0909 April 2008 Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebook, and Accompanying Phase 2 Pre-Solved Tables (Public Version) Project stage: Other 2007-11-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
OFFICIAL USE ONLY SECURITY RELA.TED IHFORM.ATIOh
- 4. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 29, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generating Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348
SUBJECT:
LIMERICK GENERATING STATION, UNIT NOS. 1 AND 2 - DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)
Dear Mr. Crane:
In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Limerick Generating Station (LGS), Unit Nos. I and 2.
The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities. . ...
Revision 2 of the notebooks is accompanied' by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.
The enclosure transmitted herewith contains Security-Related information.
When separated from enclosure, this document is decontrolled.
eFrCAL US." OhNL' - SECURI'Y RELATED INFORMATION
Ofrle!lzl iSleN-- -l1 0*EG111ilY RE12ATEDr INlFODRMATIONl C. Crane The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1 ) of Title 10 of the Code of FederalRegulations since it contains security-related information.
If you have any questions, please contact me at (301) 415-2833.
Sincerely, Peter J. Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352, 50-353
Enclosure:
Compact Disk with LGS Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only-Security Related Information cc w/o encl: See next page OFFICIAL USE ONLY SECURITY RELATED INFORMNATION
Limerick Generating Station, Unit Nos. 1 and 2 cc (w/o encl):
Site Vice President Regional Administrator, Region I Limerick Generating Station U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC 475 Allendale Road P.O. Box 2300 King of Prussia, PA 19406 Sanatoga, PA 19464 Senior Resident Inspector Plant Manager U.S. Nuclear Regulatory Commission Limerick Generating Station Limerick Generating Station Exelon Generation Company, LLC P.O. Box 596 P.O. Box 2300 Pottstown, PA 19464 Sanatoga, PA 19464 Library Regulatory Assurance Manager - Limerick U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Region I P.O. Box 2300 475 Allendale Road Sanatoga, PA 19464 King of Prussia, PA 19406 Vice President - Operations, Mid-Atlantic Director, Bureau of Radiation Protection Exelon Generation Company, LLC Pennsylvania Dept. of Environmental 200 Exelon Way, KSA 3-N Protection Kennett Square, PA 19348 Rachel Carson State Office Building P.O. Box 8469 Vice President Harrisburg, PA 17105-8469 Licensing and Regulatory Affairs Exelon Generation Company, LLC Chairman 4300 Winfield Road Board of Supervisors of Limerick Township Warrenville, IL 60555 646 West Ridge Pike-Linfield, PA 19468 Director Licensing and Regulatory Affairs Dr. Judith Johnsrud Exelon Generation Company, LLC National Energy Committee 200 Exelon Way, KSA 3-E Sierra Club Kennett Square, PA 19348 433 Orlando Avenue State College, PA 16803 Manager Licensing Limerick Generating Station Associate General Counsel Exelon Generation Company, LLC Exelon Generating Company, LLC 200 Exelon Way, KSA 3-E 4300 Winfield Road Kennett Square, PA 19348 Warrenville, IL 60555 Correspondence Control Desk Mr. Christopher M.Crane Exelon Generation Company, LLC President & Chief Nuclear Officer P.O. Box 160 Exelon Generating Company, LLC Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL60555
C. Crane -2 The -information on the'enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of FederalRegulations since it contains security-related information.
If you have any questions, please contact me at (301) 415-2833.
Sincerely, Ira!
Peter J. Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352, 50-353
Enclosure:
Compact Disk with LGS Unit Nos. 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only-Security Related Information DISTRIBUTION (w/o encl):
Public LPL1-2 R/F RidsNrrDorlLpll-2 RidsNrrLAABaxter RidsNrrPMPBamford RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsRgnl MailCenter JWeibe, NRR MFranovich, NRR Accession Nos.: Package/ML072490372;Non-Public Letter/ML072490376; Public Letter/ML073040543 Encl./ML071700260, ML071700262 LPL1-2/PM LPL1-2/LA LPL1-2/BC Name PBamford ABaxter HChernoff Date 10/18/07 10/18/07 10/29/07 Official Record Copy OFFICIAL USE ONLY - SECURITY RELATED INFORMATION