ML073270504

From kanterella
Jump to navigation Jump to search

Unit Nos., 1 and 2 (HNP)- Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables Tac No. MD6415)
ML073270504
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/24/2007
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-1
To: Madison D
Southern Nuclear Operating Co
Martin R, NRR/DORL, 415-1493
Shared Package
ML072880542 List:
References
TAC MD6415
Download: ML073270504 (3)


Text

OFFICIAL USE ONLY - SECURITY. -REATB FIO mATIQ#q UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 24, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028, Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (HNP) -

DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD641 5)

Dear Mr. Madison:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for HNP. The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.

The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

11r" A11 A"EI 1"IA,* ,,

OffiCILf USE ONLY - SEeUR29 '-RELATEB Ne*DA D. Madison The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of FederalRegulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1493.

Sincerely, RSenior Project Manager Plant Licensing Branch I1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

Compact Disk with HNP SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only - Security Related Information cc w/o encl: See next page OFFICIAL USE ONLY SECURITY-RELATED ........... '1

Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:

Mr. Dennis R. Madison Chairman Vice President - Hatch Appling County Commissioners Edwin I. Hatch Nuclear County Courthouse 11028 Hatch Parkway North Baxley, GA 31513 Baxley, GA 31513 Mr. Jeffrey T. Gasser Laurence Bergen Executive Vice President Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc.

2100 E. Exchange Place P.O. Box 1295 P.O. Box 1349 Birmingham, AL 35201-1295 Tucker, GA 30085-1349 Mr. K. Rosanski Mr. R. D. Baker Resident Manager Manager - Licensing Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant P.O. Box 1295 P.O. Box 2010 Birmingham, AL 35201-1295 Baxley, GA 31515 Resident Inspector Plant Hatch 11030 Hatch Parkway N.

Baxley, GA 31531 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW.

Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216