ML080790473

From kanterella
Jump to navigation Jump to search

Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
ML080790473
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 04/09/2008
From: Stang J
NRC/NRR/ADRO/DORL/LPLII-1
To: Brandi Hamilton
Duke Power Co
Stang, JF, NRR/DORL/LPD II-1, 415-1345
Shared Package
ML080790463 List:
References
TAC MD6415
Download: ML080790473 (3)


Text

-OfflCcAL USE N=LY - SE.CURI,'-RELATED. INFORMATiON 5 UNITED STATES NUCLEAR REGULATORY COMMISSION

-WASHINGTON, D.C. 20555-0001 April 9, 2008 Mr. Bruce H. Hamilton Vice President McGbir6e- Nu-clear Station.

Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2- DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOK, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Hamilton:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) staff requested information from licensees to support the Significance Determination Process Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for McGuire Nuclear Station, Units 1 and 2. The NRC developed the notebook to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process (SDP)," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations."

SECY 99 007A, "Recommendations for Reactor Oversight Process Improvements," set forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of-plant-specific design features and operation, are expected to use the notebook. The notebook will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the site-specific pre-solved spreadsheet (the spreadsheet). The NRC added the spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebook against licensee probability risk assessments and plant configurations. The enclosed compact disk containing the above document is provided for your use to facilitate your understanding of the significance determination process in Inspection Manual Chapter 0609, "Significance Determination Process."

The enclosure transmitted herewith contains security-related information.

When separated from enclosure, this document is decontrolled.

. ,ni fl ~ s

.% .... . . .. . 5...

. . . . . . . .. . . . 5* .... . . . ......

lvlý%

1 1%01 Is

OerllAL USE e*L.i' - S.eUR;ITI-RELATE- INFO*RMTVI-A I N B. Hamilton The enclosure to this letter is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of FederalRegulationssince it contains security-related information.

If you have any questions, please contact me at (301) 415-1345.

Sincerely, Senior ct Manager Plant Licensing Branch I1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

CD-R with McGuire Nuclear Station, Units 1 and 2 SDP Revision 2 Official Use Only - Security-Related Information cc w/o enc: See next page The enclosure transmitted herewith contains security-related information.

When separated from enclosure, this document is decontrolled.

OFFI-lIA USE ONLY - SECURITY-RELATED. INFORMATION

McGuire Nuclear Station, Units 1 & 2 cc:

Vice President NCEM REP Program Manager McGuire Nuclear Station 4713 Mail Service Center Duke Power Company, LLC Raleigh, NC 27699-4713 12700-Hagers-Ferry -Road Huntersville, NC 28078 Assistant Attorney General NC Department of Justice Associate General Counsel and P.O. Box 629 Managing Attorney Raleigh, NC 27602 Duke Energy Carolinas, LLC Manager 526 South Church Street - EC07H Nuclear Regulatory Issues &

Charlotte, North Carolina 28202 Industry Affairs Duke Energy Corporation County Manager of Mecklenburg County 526 S. Church St.

720 E. Fourth St. Mail Stop EC05P Charlotte, NC 28202 Charlotte, NC 28202 Regulatory Compliance Manager Division of Radiation Protection Duke Energy Corporation NC Dept of Environment, Health &

McGuire Nuclear Site Natural IResources 12700 Hagers Ferry Road -3825 Barrett Di.

Huntersville, NC 28078 Raleigh, NC 27609-7721 Senior Resident Inspector Owners Group (NCEMC)

U.S. Nuclear Regulatory Commission Duke Energy Corporation 12700 Hagers Ferry Road 4800 Concord Road Huntersville, NC 28078 York, SC 29745 Mecklenburg County Group Vice President, Nuclear Department of Environmental Protection Generation 700 N. Tryon St & Chief Nuclear OfficeP.O. Box 1006-Charlotte, NC 28202 EC07H Charlotte, NC 28201-1006 Vice President Customer Relations and Sales Senior Counsel Westinghouse Electric Company Duke Energy Carolinas, LLC 6000 Fairview Road, 12th Floor 526 South Church Street - EC07H Charlotte, NC 28210 Charlotte, NC 28202