ML080790473

From kanterella
Jump to navigation Jump to search

Distribution of Revision 2 of the NRCs Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
ML080790473
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/09/2008
From: Stang J
NRC/NRR/ADRO/DORL/LPLII-1
To: Brandi Hamilton
Duke Power Co
Stang, JF, NRR/DORL/LPD II-1, 415-1345
Shared Package
ML080790463 List:
References
TAC MD6415
Download: ML080790473 (3)


Text

-OfflCcAL USE N=LY - SE.CURI,'-RELATED. INFORMATiON 5

UNITED STATES NUCLEAR REGULATORY COMMISSION

-WASHINGTON, D.C. 20555-0001 April 9, 2008 Mr. Bruce H. Hamilton Vice President McGbir6e-Nu-clear Station.

Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2-DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOK, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Hamilton:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) staff requested information from licensees to support the Significance Determination Process Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for McGuire Nuclear Station, Units 1 and 2. The NRC developed the notebook to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process (SDP)," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations."

SECY 99 007A, "Recommendations for Reactor Oversight Process Improvements," set forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of-plant-specific design features and operation, are expected to use the notebook. The notebook will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the site-specific pre-solved spreadsheet (the spreadsheet). The NRC added the spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebook against licensee probability risk assessments and plant configurations. The enclosed compact disk containing the above document is provided for your use to facilitate your understanding of the significance determination process in Inspection Manual Chapter 0609, "Significance Determination Process."

The enclosure transmitted herewith contains security-related information.

When separated from enclosure, this document is decontrolled.

fl

,ni

~.%

s 5...

5*......

lvlý%

1 1%01 Is

OerllAL USE e*L.i' - S.eUR;ITI-RELATE-INFO*RMTVI-A N

I The enclosure to this letter is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-1345.

Sincerely, Senior ct Manager Plant Licensing Branch I1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

CD-R with McGuire Nuclear Station, Units 1 and 2 SDP Revision 2 Official Use Only - Security-Related Information cc w/o enc: See next page The enclosure transmitted herewith contains security-related information.

When separated from enclosure, this document is decontrolled.

OFFI-lIA USE ONLY - SECURITY-RELATED. INFORMATION

McGuire Nuclear Station, Units 1 & 2 cc:

Vice President McGuire Nuclear Station Duke Power Company, LLC 12700-Hagers-Ferry -Road Huntersville, NC 28078 Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 County Manager of Mecklenburg County 720 E. Fourth St.

Charlotte, NC 28202 Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, NC 28078 Senior Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, NC 28078 Mecklenburg County Department of Environmental Protection 700 N. Tryon St Charlotte, NC 28202 Vice President Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road, 12th Floor Charlotte, NC 28210 NCEM REP Program Manager 4713 Mail Service Center Raleigh, NC 27699-4713 Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Manager Nuclear Regulatory Issues &

Industry Affairs Duke Energy Corporation 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health &

Natural I Resources

-3825 Barrett Di.

Raleigh, NC 27609-7721 Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, SC 29745 Group Vice President, Nuclear Generation

& Chief Nuclear OfficeP.O. Box 1006-EC07H Charlotte, NC 28201-1006 Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202