ML072831379

From kanterella
Jump to navigation Jump to search

(Public Version) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks and Accompanying Phase 2 Pre-Solved Tables
ML072831379
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/23/2007
From: Mozafari B
NRC/NRR/ADRO/DORL/LPLII-2
To: Stall J
Florida Power & Light Co
Mozafari B, NRR/ADRO/DORL, 415-2020
Shared Package
ml072831378 List:
References
TAC MD6415
Download: ML072831379 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION SWASHINGTON, D.C. 20555-0001 October 23, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

ST. LUCIE, UNITS 1 AND 2; TURKEY POINT, UNITS 3 AND 4 - DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Stall:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process [SDP] Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for St. Lucie, Units 1 and 2 (SL1 and SL2), and Turkey Point, Units 3 and 4 (TP3/4). The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding SDP detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," set forth this process and additional details are included in the NRC, Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks. The notebooks will be updated on a case-by-case basis, as needed, to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site-Specific Pre-Solved Spreadsheet (the Spreadsheet). The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings. The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations. The enclosed compact disks (CDs) containing the above documents are provided for your use to facilitate your understanding of the significance determination process in Inspection Manual Chapter 0609.

The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

J. Stall The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulationssince it contains security-related information.

If you have any questions, please contact me at (301) 415-2020.

Sincerely, Brenda L. Mozafari, Senior Proj ect ager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-335, 50-389, 50-250, and 50-251

Enclosures:

- Official Use Only - Security Related Information

1. CD w/ SL1 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet
2. CD w/ SL2 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet
3. CD w/ TP3/4 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet cc w/o enclosure: See next page

Page 1 of 2 Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company ST. LUCIE PLANT cc w/o enclosure:

William E. Webster Christopher R. Costanzo Vice President, Nuclear Operations, Plant General Manager South Region St. Lucie Nuclear Plant Florida Power & Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, FL 33408-0420 County Manager Senior Resident Inspector Miami-Dade County St. Lucie Plant 111 Northwest 1 Street, 29th Floor U.S. Nuclear Regulatory Commission Miami, Florida 33128 P.O. Box 6090 Jensen Beach, Florida 34957 Senior Resident Inspector Turkey Point Nuclear Plant Craig Fugate, Director U.S. Nuclear Regulatory Commission Division of Emergency Preparedness 9762 SW. 3 4 4th Street Department of Community Affairs Florida City, Florida 33035 2740 Centerview Drive Tallahassee, Florida 32399-2100 William A. Passetti, Chief Department of Health M. S. Ross, Managing Attorney Bureau of Radiation Control Florida Power & Light Company 2020 Capital Circle, SE, Bin #C21 P.O. Box 14000 Tallahassee, Florida 32399-1741 Juno Beach, FL 33408-0420 Attorney General Marjan Mashhadi, Senior Attorney Department of Legal Affairs Florida Power & Light Company The Capitol 801 Pennsylvania Avenue, NW. Tallahassee, Florida 32304 Suite 220 Washington, DC 20004 Michael 0. Pearce Plant General Manager William Jefferson, Jr. Turkey Point Nuclear Plant Site Vice President Florida Power and Light Company Turkey Point Nuclear Plant 9760 SW. 344th Street Florida Power and Light Company Florida City, FL 33035 9760 SW. 344th Street Florida City, FL 33035 James Connolly, Licensing Manager Florida Power and Light Company Douglas Anderson Turkey Point Nuclear Plant County Administrator 9760 SW. 344th Street St. Lucie County Florida City, FL 33035 2300 Virginia Avenue Ft. Pierce, Florida 34982

ý7-7' -1 7- 7-7. - - - - - - - T-1-jr7- -j.. t -- ,J-..-

Page 2 of 2 Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company TURKEY POINT cc:

Don E. Grissette Seth B. Duston Vice President, Nuclear Training Training Manager and Performance Improvement St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957-2000 Juno Beach, FL 33408-0420 Terry L. Patterson Mark Warner, Vice President Licensing Manager Nuclear Operations Support St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, FL 33408-0420 J. Kammel Rajiv S. Kundalkar Radiological Emergency Vice President, Nuclear Technical Services Planning Administrator Florida Power & Light Company Department of Public Safety P.O. Box 14000 6000 Southeast Tower Drive Juno Beach, FL 33408-0420 Stuart, Florida 34997 Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000

October 23, 2007 J. Stall The information on the enclosed CDs is designated exempt from public disclosure pursuant to Section 2.390 (d) (1) of Title 10 of the Code of FederalRegulationssince it contains security-related information.

If you have any questions, please contact me at (301) 415-2020.

Sincerely, Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-335, 50-389, 50-250, and 50-251

Enclosures:

- Official Use Only - Security Related Information

1. CD w/ SL1 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet
2. CD w/ SL 2 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet
3. CD w/ TP3/4 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet cc w/o enclosure: See next page DISTRIBUTION W/O ENCLOSURE:

PUBLIC RidsNrrLABClayton (hardcopy)

LPL2-2 R/F RidsNrrDorILpl2-2 RidsNrrPMBMozafari JWiebe RidsNRRDraApob (MFranovich)

St Lucie 1 Spread: ML071700518 St Lucie 1 Notebook: ML071700516 St. Lucie 2 Spread: ML071700523 St. Lucie 2 Notebook: ML071700521 Turkey Pt. Spread: ML071700545 Turkey Pt. Notebook: ML071700544 ADAMS Accession Number: Non Pub. Ltr.: ML072831371 Pub. Ltr.: ML072831379 Pkg: ML072831378 NRR-106" OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME BMozafari BClayton TBoyce ,1 '

DFATE wIIACOP FICALRECORD COPY IY~~

1ECORD U