|
---|
Category:Inspection Report
MONTHYEARIR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 IR 05000219/20214032021-12-21021 December 2021 EA-21-093 Notice of Violation and Proposed Imposition of Civil Penalty - $150,000, Inspection Report No. 05000219/2021403 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) ML21202A2312021-07-28028 July 2021 Discretionary Security Decommissioning Inspection Report No. 05000219/2021403 - Public Version IR 05000219/20210022021-07-27027 July 2021 NRC Inspection Report No. 05000219/2021002 and Independent Spent Fuel Storage Installation Report 07200015/2021002 IR 05000219/20210012021-05-18018 May 2021 NRC Inspection Report No. 05000219/2021001 and Independent Spent Fuel Storage Installation Report 07200015/2021001, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station IR 05000219/20204022020-12-14014 December 2020 Security Decommissioning Inspection Report 05000219/2020402 (Public - No Findings) IR 05000219/20200032020-10-21021 October 2020 NRC Inspection Report No. 05000219/2020003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20204012020-07-27027 July 2020 Security Baseline Inspection Report 05000219/2020401 IR 05000219/20200022020-07-20020 July 2020 NRC Inspection Report No. 05000219/2020002, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20200012020-04-20020 April 2020 Forked River, New Jersey, NRC Inspection Report 05000219/2020001 IR 05000219/20190042020-01-0606 January 2020 NRC Inspection Report 05000219/2019004, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190032019-10-28028 October 2019 NRC Inspection Report No. 05000219/2019003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190022019-07-24024 July 2019 NRC Inspection Report 05000219/2019002 IR 05000219/20190012019-04-15015 April 2019 NRC Inspection Report No. 05000219/2019001, Oyster Creek Nuclear Generating Station IR 05000219/20194012019-03-25025 March 2019 NRC Inspection Report No. 05000219/2019401 (Public) IR 05000219/20180122019-02-19019 February 2019 NRC Inspection Report No. 05000219/2018012, Oyster Creek Nuclear Generating Station IR 05000219/20180032018-11-0808 November 2018 Integrated Inspection Report 05000219/2018003 IR 05000219/20180022018-08-0202 August 2018 Integrated Inspection Report 05000219/2018002 and Independent Spent Fuel Storage Installation Report 0700015/2018001 IR 05000219/20184102018-06-18018 June 2018 Security Inspection Report 05000219-2018410 (Cover Letter) IR 05000219/20180012018-05-0808 May 2018 Integrated Inspection Report 05000219-2018001 and Exercise of Enforcement Discretion IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20180102018-02-28028 February 2018 Design Bases Assurance Inspection (Programs) Report 05000219/2018010 IR 05000219/20170042018-01-24024 January 2018 NRC Integrated Inspection Report 05000219/2017004 IR 05000219/20170092017-11-30030 November 2017 Temporary Instruction 2515-191 Inspection Report 05000219/2017009 IR 05000219/20174052017-10-25025 October 2017 Problem Identification and Resolution Sample Security Inspection Report 05000219/2017405 (Cover Letter) IR 05000219/20170082017-10-17017 October 2017 Supplemental Inspection Report 05000219/2017008 and Assessment Follow-Up Letter IR 05000219/20170032017-10-17017 October 2017 Integrated Inspection Report 05000219/2017003 IR 05000219/20175022017-10-16016 October 2017 Evaluated Emergency Preparedness Exercise Inspection Report 05000219-2017502 IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20174042017-08-15015 August 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) IR 05000219/20170022017-08-0303 August 2017 Integrated Inspection Report 05000219/2017002 IR 05000219/20174032017-05-0909 May 2017 Security Inspection Report 05000219-2017403 (Cover Letter) IR 05000219/20170012017-05-0808 May 2017 Integrated Inspection Report 05000219/2017001 IR 05000219/20170072017-05-0101 May 2017 IR 05000219/20160042017-04-13013 April 2017 Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000219/2016004 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 IR 05000219/20164042016-12-22022 December 2016 Material Control and Accounting Program Inspection Report 05000219/2016404 IR 05000219/20160082016-12-14014 December 2016 Problem Identification and Resolution Inspection Report 05000219/2016008 2024-09-05
[Table view] Category:Letter
MONTHYEARML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 2024-09-05
[Table view] |
Text
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NO. 05000219/2014502
Dear Mr. Pacilio:
On March 20, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the March 18, 2014, evaluated emergency preparedness exercise at your Oyster Creek Nuclear Generating Station. The enclosed inspection report documents the inspection results, which were discussed on March 20, 2014, with Mr. G. Stathes, Site Vice-President, and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-219 License No. DPR-16 April 29, 2014
Enclosure:
Inspection Report No. 05000219/2014502
REGION I==
Docket No: 50-219
License No: DPR-16
Report No: 05000219/2014502
Licensee: Exelon Generation Company, LLC (Exelon)
Facility: Oyster Creek Nuclear Generating Station (Oyster Creek)
Location: Forked River, New Jersey
Dates: March 17-21, 2014
Inspectors: S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)
E. Burket, Emergency Preparedness Inspector, DRS, Region I P. Presby, Sr. Operations Engineer, DRS, Region I S. LaVie, Sr. Emergency Preparedness Specialist, EPD, NSIR L. McKown, Project Engineer, DRP, Region I B. Bollinger, Reactor Engineer, DRP, Region I
Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety
ii Enclosure
SUMMARY
IR 05000219/2014502; 03/17/2014 - 03/21/2014; Exelon Energy Company, LLC, Oyster Creek
Nuclear Generating Station; Exercise Evaluation; Exercise Evaluation - Scenario Review.
This was an announced inspection conducted by five Region I-based inspectors and one Headquarters-based inspector. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Proce ss," Revision 4, dated December 2006.
No findings were identified.
REPORT DETAILS
REACTOR SAFETY
1EP1 Exercise Evaluation (71114.01 - 1 Sample)
a. Inspection Scope
On March 18, 2014, Exelon conducted a biennial Oyster Creek Generating Station emergency preparedness exercise. This exercise had been scheduled for October 8, 2013, but was not conducted due to the Federal Government shutdown which occurred at that time. Exelon was granted a license exemption by the NRC staff to conduct the drill in March 2014, when Federal evaluation of the onsite and offsite portions of the exercise could be performed. The inspectors evaluated the adequacy of the licensee's conduct of the exercise and its capability to assess their own staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b) (14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The exercise evaluation consisted of the following review and assessment:
- The adequacy of Exelon's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
- The overall adequacy of Exelon's emergency response facilities (ERFs) with regard to Emergency Plan commitments. The ERFs assessed were: the Control Room Simulator, the Technical Support Center (TSC), the Emergency Operations Facility (EOF), and the Joint Information Center (JIC).
- A review of other performance areas, such as the licensee's emergency response organization (ERO) recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra-and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
- A review of past performance issues from the last NRC Oyster Creek exercise inspection report and Exelon's EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the March 18, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
- A review of the licensee's post-exercise critiques, to evaluate Exelon's self-assessment of its ERO performance during the March 18, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)
a. Inspection Scope
Prior to the March 18, 2014, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Oyster Creek Emergency Plan as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b) (14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On March 20, 2014, the inspectors presented the results of this inspection to Mr. G. Stathes, Site Vice-President, and other members of the Exelon staff.
The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- G. Stathes, Oyster Creek Site Vice President
- M. Chanda, Oyster Creek Emergency Preparedness Manager
- V. Cwietniewicz, Exelon Mid-Atlantic Corporate Emergency Preparedness Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED