MONTHYEARIR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 IR 05000219/20214032021-12-21021 December 2021 EA-21-093 Notice of Violation and Proposed Imposition of Civil Penalty - $150,000, Inspection Report No. 05000219/2021403 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) ML21202A2312021-07-28028 July 2021 Discretionary Security Decommissioning Inspection Report No. 05000219/2021403 - Public Version IR 05000219/20210022021-07-27027 July 2021 NRC Inspection Report No. 05000219/2021002 and Independent Spent Fuel Storage Installation Report 07200015/2021002 IR 05000219/20210012021-05-18018 May 2021 NRC Inspection Report No. 05000219/2021001 and Independent Spent Fuel Storage Installation Report 07200015/2021001, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station IR 05000219/20204022020-12-14014 December 2020 Security Decommissioning Inspection Report 05000219/2020402 (Public - No Findings) IR 05000219/20200032020-10-21021 October 2020 NRC Inspection Report No. 05000219/2020003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20204012020-07-27027 July 2020 Security Baseline Inspection Report 05000219/2020401 IR 05000219/20200022020-07-20020 July 2020 NRC Inspection Report No. 05000219/2020002, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20200012020-04-20020 April 2020 Forked River, New Jersey, NRC Inspection Report 05000219/2020001 IR 05000219/20190042020-01-0606 January 2020 NRC Inspection Report 05000219/2019004, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190032019-10-28028 October 2019 NRC Inspection Report No. 05000219/2019003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190022019-07-24024 July 2019 NRC Inspection Report 05000219/2019002 IR 05000219/20190012019-04-15015 April 2019 NRC Inspection Report No. 05000219/2019001, Oyster Creek Nuclear Generating Station IR 05000219/20194012019-03-25025 March 2019 NRC Inspection Report No. 05000219/2019401 (Public) IR 05000219/20180122019-02-19019 February 2019 NRC Inspection Report No. 05000219/2018012, Oyster Creek Nuclear Generating Station IR 05000219/20180032018-11-0808 November 2018 Integrated Inspection Report 05000219/2018003 IR 05000219/20180022018-08-0202 August 2018 Integrated Inspection Report 05000219/2018002 and Independent Spent Fuel Storage Installation Report 0700015/2018001 IR 05000219/20184102018-06-18018 June 2018 Security Inspection Report 05000219-2018410 (Cover Letter) IR 05000219/20180012018-05-0808 May 2018 Integrated Inspection Report 05000219-2018001 and Exercise of Enforcement Discretion IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20180102018-02-28028 February 2018 Design Bases Assurance Inspection (Programs) Report 05000219/2018010 IR 05000219/20170042018-01-24024 January 2018 NRC Integrated Inspection Report 05000219/2017004 IR 05000219/20170092017-11-30030 November 2017 Temporary Instruction 2515-191 Inspection Report 05000219/2017009 IR 05000219/20174052017-10-25025 October 2017 Problem Identification and Resolution Sample Security Inspection Report 05000219/2017405 (Cover Letter) IR 05000219/20170082017-10-17017 October 2017 Supplemental Inspection Report 05000219/2017008 and Assessment Follow-Up Letter IR 05000219/20170032017-10-17017 October 2017 Integrated Inspection Report 05000219/2017003 IR 05000219/20175022017-10-16016 October 2017 Evaluated Emergency Preparedness Exercise Inspection Report 05000219-2017502 IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20174042017-08-15015 August 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) IR 05000219/20170022017-08-0303 August 2017 Integrated Inspection Report 05000219/2017002 IR 05000219/20174032017-05-0909 May 2017 Security Inspection Report 05000219-2017403 (Cover Letter) IR 05000219/20170012017-05-0808 May 2017 Integrated Inspection Report 05000219/2017001 IR 05000219/20170072017-05-0101 May 2017 IR 05000219/20160042017-04-13013 April 2017 Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000219/2016004 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 IR 05000219/20164042016-12-22022 December 2016 Material Control and Accounting Program Inspection Report 05000219/2016404 IR 05000219/20160082016-12-14014 December 2016 Problem Identification and Resolution Inspection Report 05000219/2016008 IR 05000219/20160032016-10-31031 October 2016 Integrated Inspection Report 05000219-2016003 IR 05000219/20160072016-08-10010 August 2016 IR 05000219/2016007;6-13-16-7/15/16; Oyster Creek Nuclear Generating Station-Component Design Bases Inspection-CDBI) IR 05000219/20160112016-08-10010 August 2016 Supplemental Inspection Report 05000219/2016011 and Assessment Follow-Up Letter 2023-08-22
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
July 20, 2020
SUBJECT:
NRC INSPECTION REPORT NO. 05000219/2020002, HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, OYSTER CREEK NUCLEAR GENERATING STATION, FORKED RIVER, NEW JERSEY
Dear Ms. Cowan:
On June 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, at the permanently shut down Oyster Creek Nuclear Generating Station (Oyster Creek). On-site inspections were performed on June 17, 2020. Additional inspection activities [in-office reviews of information supplied by Holtec Decommissioning International, LLC (HDI)] were conducted remotely as a consequence of the COVID-19 public health emergency (PHE)
during the inspection period from April 1, 2020 to June 30, 2020. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and the conditions of your license. The inspection consisted of on-site observations by the inspector, interviews with site personnel, and a review of procedures and records. The results of this inspection were discussed with Mr. Jeffrey Dostal, HDI Oyster Creek Site Vice President, and other members of the Oyster Creek staff on July 13, 2020 and are described in the enclosed report. No violations of safety significance were identified.
In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
No reply to this letter is required. Please contact Elizabeth Andrews at 610-337-5117 if you have any questions regarding this matter.
Sincerely,
/RA/
Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Nuclear Materials Safety Docket No: 50-219 License No: DPR-16
Enclosure:
Inspection Report 05000219/2020002 w/Attachment
REGION I==
Docket No: 050-00219 License No: DPR-16 Report No: 05000219/2020002 Licensee: Holtec Decommissioning International, LLC Facility: Oyster Creek Nuclear Generating Station Location: Forked River, New Jersey Dates: April 1, 2020 - June 30, 2020 Inspector: E. Andrews, Health Physicist Decommissioning, ISFSI and Reactor HP Branch Division of Nuclear Materials Safety, Region I Approved by: Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety, Region I
EXECUTIVE SUMMARY
Holtec Decommissioning International, LLC
Oyster Creek Nuclear Generating Station NRC Inspection Report No. 05000219/2020002 An announced decommissioning inspection was completed at Oyster Creek Nuclear Generating Station (Oyster Creek) on June 30, 2020. An on-site inspection was performed on June 17, 2020. Additional inspection activities (in-office reviews) were conducted remotely during the inspection period as a consequence of the COVID-19 public health emergency (PHE). The inspection included a review of safety reviews, design changes, and modifications; self-assessments, audits, and corrective actions; decommissioning performance and status reviews; occupational radiation exposure; and inspection of remedial and final surveys.
The inspection consisted of observations by the inspector, interviews with Oyster Creek personnel, a review of procedures and records, and plant walk-downs. The U.S. Nuclear Regulatory Commissions (NRC's) program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,
Decommissioning Power Reactor Inspection Program."
Based on the results of this inspection, no violations of safety significance were identified.
ii
REPORT DETAILS
1.0 Background On September 25, 2018, Oyster Creek certified the permanent removal of fuel from the reactor vessel [Agencywide Document Access and Management System (ADAMS)
Accession No. ML18268A258]. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). On October 1, 2018, the NRC notified Oyster Creek that the Operating Reactor Assessment Program had ceased, and that implementation of the Decommissioning Power Reactor Inspection Program would begin on October 1, 2018 (ADAMS Accession No. ML18274A221). On July 1, 2019, an amended license was issued transferring the license from Exelon Generation Co., LLC to Holtec Decommissioning International, LLC (ADAMS Accession No. ML19164A157).
Oyster Creek is currently in the Actively Decommissioning, Fuel in the Spent Fuel Pool phase of decommissioning as described in IMC 2561.
2.0 Active Decommissioning Performance and Status Review 2.1 Inspection Procedure (IP) 37801, 40801, 71801, 83750, 83801
a. Inspection Scope
In-office reviews of information supplied by Oyster Creek were performed during the inspection period. The inspector performed an on-site inspection on June 17, 2020.
Additional inspection activities were conducted remotely during the inspection period as a consequence of the COVID-19 PHE. The inspection consisted of observations by the inspector, interviews with Oyster Creek personnel, a review of procedures and records, and plant walk-downs.
The inspector conducted document reviews and interviews with plant personnel to determine if procedures and processes were in accordance with regulations and guidance associated with 10 CFR 50.59 Changes, tests, and experiments. The inspector reviewed the 10 CFR 50.59 screenings for three onsite activities including an editorial change to an on-site low-level radioactive waste facility configuration, de-vitalization of various rooms throughout the plant, and a refuel bridge monorail modification. The inspector also reviewed the screening criteria to determine if evaluations were required, in accordance with 10 CFR 50.59 for the changes and modifications.
The inspector reviewed documents and interviewed site personnel to determine if HDI management performed audits and self-assessments, and ensured issues were identified and corrected in accordance with the sites corrective action program (CAP).
The inspector reviewed a representative selection of CAP documents to determine if a sufficiently low threshold for problem identification existed, follow-up evaluations were of sufficient quality, and HDI assigned timely and appropriate prioritization for issue resolution commensurate with the significance of the issue.
The inspector reviewed the status of activities related to the site decommissioning to determine if activities were in accordance with licensed requirements. The inspector observed decommissioning activities associated with the preparation, segmentation and storage of portions of the steam dryer and steam separator. The inspector interviewed workers and reviewed work packages, plans, and procedures for the activities observed.
The inspector reviewed the decommissioning schedule to determine if the schedule was consistent with the post shutdown decommissioning activities report (PSDAR).
The inspector observed radiation protection technician job coverage of maintenance activities, toured the radiologically controlled areas, and reviewed radiological surveys and as low as reasonably achievable (ALARA) plans for ongoing projects to verify that radiation work activities were pre-planned effectively to limit worker exposure. The inspector examined radiological postings, locked high radiation doors, and general housekeeping.
The inspector reviewed Oyster Creeks Historical Site Assessment to determine if the radiological conditions during the operating history at Oyster Creek were accurately represented. The inspector conducted site walkdowns and reviewed radiological surveys to confirm conclusions made throughout the document.
b. Observations and Findings
The inspector determined that the 10 CFR 50.59 screenings were performed by trained and qualified individuals. The inspector determined that changes under 10 CFR 50.59 did not require prior NRC approval and safety reviews were performed for design changes and modifications. The inspector verified that the licensee correctly determined that 10 CFR 50.59 evaluations were not required for issues including: an editorial change to the on-site low-level radioactive waste facility configuration, de-vitalization of various rooms throughout the plant, and modification of the refuel bridge monorail.
Specifically, the changes to the plant did not result in any changes that adversely affected the design function of any system, structure, or component described in the Decommissioning Safety Analysis Report.
The inspector determined that issues had been identified and entered into the CAP in a timely manner and the issues were effectively screened, prioritized and evaluated commensurate with their safety significance. The inspector verified that audits and self-assessments were performed by qualified individuals independent of the organization being audited, and management reviewed the audits and associated corrective actions.
The inspector noted the next main decommissioning activities during this inspection period include the reactor vessel internals segmentation project. The inspector determined the activities were performed safely and in accordance with work plans and plant procedures. The inspector verified the activities and schedule were consistent with the September 28, 2018, notification by HDI revising the PSDAR for Oyster Creek.
The inspector verified that radiation protection staff effectively controlled work activities and survey records were clear and complete. The inspector verified that ALARA plans were performed as needed and were effective in limiting worker exposure and occupational dose was acceptable for the scope of the radiological activities performed.
The inspector verified that the Historical Site Assessment adequately defined the current and historical radiological conditions of the site.
c. Conclusions
Based on the results of this inspection, no violations of safety significance were identified.
3.0 Exit Meeting On July 13, 2020, the inspector presented the inspection results to Mr. Jeffrey Dostal, HDI Oyster Creek Site Vice President, and other members of the Oyster Creek staff who acknowledged the inspection results. The inspector verified that no proprietary information was retained by the inspector or documented in this report.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Oyster Creek Personnel
- P. Cowan, HDI Senior Vice President and Chief Operating Officer
- A. Sterdis, HDI Vice President Regulatory and Environmental Affairs
- J. Dostal, HDI Oyster Creek Site Vice President
- L. Berlinski, Oversight Assessor
- J. Frank, Site DC Regulatory Assurance Lead
- S. Johnson, Site DO Operations Lead
- J. McCarthy, Radiation Protection Decommissioning Specialist
- J. Sisak, Site DO Work Management Lead
- K. Wolf, Manager Radiation Protection and Chemistry
ITEMS OPENED, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED