JAFP-17-0022, Transmittal of Emergency Plan Updates
ML17080A176 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 03/17/2017 |
From: | Jackie Jones Entergy Nuclear Northeast, Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17082A185 | List: |
References | |
JAFP-17-0022 | |
Download: ML17080A176 (2) | |
Similar Documents at FitzPatrick | |
---|---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARRS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024
[Table view]Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-18-0049, Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan2018-05-11011 May 2018 Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan ML18128A0832018-04-30030 April 2018 Attachment 4 - EP-AA-1014, Revision 1, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0882018-04-30030 April 2018 Attachment 7 - EP-AA-1014, Addendum 3, Revision 0, James A. FitzPatrick Nuclear Power Plant Emergency Action Levels. NMP1L3209, Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station.2018-04-30030 April 2018 Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station. ML18128A0842018-04-26026 April 2018 Attachment 5 - EP-AA-1014, Addendum 1, Revision 0, On-Shift Staffing Analysis Report for James A. FitzPatrick Nuclear Power Plant. ML18128A0802018-04-26026 April 2018 Attachment 1 - 10CFR50.54(q)(5) Change Summary Analysis ML18128A0792018-04-26026 April 2018 James A. FitzPatrick Nuclear Power Plant and Independent Spent Fuel Storage Installations and Nine Mile Point, Units 1 and 2, Submittal of Emergency Plan Addendum and Annex Revisions ML18128A0822018-03-31031 March 2018 Attachment 3 - EP-AA-1014, Revision 0, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0892018-03-31031 March 2018 Attachment 8 - EP-AA-1013, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex for Nine Mile Point Station. ML18037A7902018-01-31031 January 2018 Enclosure 2B- EAL Red-Line Basis Document JAFP-18-0014, Enclosure 2A- EAL Comparison Matrix Document2018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document JAFP-18-0014, Enclosure 2C- EAL Basis Document2018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7882018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document ML18037A7922018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7932018-01-31031 January 2018 Enclosure 2D- EAL Front Matter ML18037A7952018-01-31031 January 2018 Enclosure 2E- Procedure Matrix ML17178A3672017-06-21021 June 2017 Transmittal of Emergency Plan Updates JAFP-17-0060, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-06-21021 June 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-17-0060, Emergency Plan Volume 12017-05-31031 May 2017 Emergency Plan Volume 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 JAFP-17-0022, Transmittal of Emergency Plan Updates2017-03-17017 March 2017 Transmittal of Emergency Plan Updates ML17066A3002017-03-15015 March 2017 Transmittal of Emergency Plan Updates JAFP-17-0015, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-03-15015 March 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-17-0015, Emergency Plan Updates2017-03-15015 March 2017 Emergency Plan Updates JAFP-16-0184, Transmittal of Emergency Plan Updates2016-12-12012 December 2016 Transmittal of Emergency Plan Updates JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates JAFP-16-0144, Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 122016-09-19019 September 2016 Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 12 JAFP-16-0126, Submittal of Emergency Plan Updates2016-08-0808 August 2016 Submittal of Emergency Plan Updates JAFP-16-0109, Transmittal of Emergency Plan Updates2016-06-21021 June 2016 Transmittal of Emergency Plan Updates JAFP-16-0104, James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 322016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0104, Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 272016-06-15015 June 2016 Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 27 ML16188A1842016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0094, Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant2016-05-31031 May 2016 Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant JAFP-16-0086, Transmittal of Emergency Plan Updates2016-05-20020 May 2016 Transmittal of Emergency Plan Updates JAFP-16-0043, Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.12016-03-0707 March 2016 Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.1 ML18128A0862016-02-24024 February 2016 Attachment 6 - EP-AA-1014, Addendum 2, Revision 0, James A. FitzPatrick Nuclear Power Plant Evacuation Time Estimates. ML12215A0042012-07-19019 July 2012 After Action Report/Improvement Plan Excercise Date - June 21, 2011 ML12215A0032012-07-19019 July 2012 After Action Report/ Improvement Plan, Exercise Date - June 22-23, 2011 ML0532604832003-08-31031 August 2003 Enclosure I, Appendix F Evacuation Time Estimates for the James A. Fitzpatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Are Collocated Therefore, This Evaluation Is Id 2024-07-12 Category:Letter type:JAFP MONTHYEARJAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024
[Table view]Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0066, for James A. Ftizpatrick Nuclear Power Plant, Misaligned Spacer Prevented Tie Breaker Closing Coil Armature Operation on a Magne-Blast for EDG a Subsystem2023-12-0101 December 2023 for James A. Ftizpatrick Nuclear Power Plant, Misaligned Spacer Prevented Tie Breaker Closing Coil Armature Operation on a Magne-Blast for EDG a Subsystem JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation 2024-09-25 |
Text
**--*
-.
JAFP-17-0022 March 17, 2017 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059
Dear Sir or Madam:
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc. James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 James D. Jones Emergency Preparedness Manager The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q).
This transmittal fulfills the requirements of 10 CFR 50.54(q), 10 CFR 50 Appendix E Section V, *10 CFR 70.32(i), and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan. The following documents (including change documentation and screening) are attached:
- EAP-1. 1, Revision 7 4
- EAP-1.1, Revision 75 The.following documents (including change documentation).are attached:
- APPENDIX I, Revision 12 (Editorial Corrections)
- SECTION 6, Revision 36 (Editorial Corrections)
- SECTION 7, Revision 35 (Editorial Corrections)
- EAP-42, Revision 26 (Editorial Corrections)
- SAP-8, Revision 21 {Editorial Corrections)
This letter contains no new regulatory commitments.
If you should have any questions, please.contact Mr. James D. Jones at (315) 349-6030.
James D. Jones Emergency Preparedness Manager JDJ:pjp Enclosure( s ): Including change documentation and screening:
- EAP-1.1, Revision 7 4
- EAP-1.1, Revision 75 Including change documentation:
- APPENDIX I, Revision 12 (Editorial Corrections)
- SECTION 6, Revision 36 (Editorial Corrections)
- SECTION 7, Revision 35 (Editorial Corrections)
- EAP-42, Revision 26 (Editorial Corrections)
- SAP-8, Revision 21 (Editorial Corrections) cc w/o procedure documentation, evaluation and screening:
USNRC (l&E) Regional Administrator, Region I -Controlled -2 Copies NRC Resident Inspector
-Controlled -1 Copy JAFP-17-0022 Page 2 of 2 NRC Director NMSS -Uncontrolled -1 Copy NRC Director Division of Spent Fuel Storage and Transportation
-Uncontrolled -1 Copy NRC Director, Division of Security Policy -Uncontrolled -1 Copy NYSEMO -Controlled -1 Copy OCEMO -Controlled -1 Copy