MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA ML17333A4221996-04-0808 April 1996 Revised Proposed Ts,Moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3571996-03-12012 March 1996 Proposed Tech Specs,Removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3,4 & 5 ML17333A3301996-02-29029 February 1996 Proposed Tech Specs Re Boric Acid Storage Sys Boron Concentration ML17333A3231996-02-26026 February 1996 Proposed TS 5.6.2 Re Increase in Max Nominal Fuel Assembly Enrichment Limit,Taking Credit for Use of Integral Fuel Burnable Absorber Matl ML17333A3221996-02-22022 February 1996 Proposed Tech Specs,Proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3171996-02-22022 February 1996 Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A3121996-02-16016 February 1996 Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording ML17333A2671996-01-12012 January 1996 Proposed Tech Specs,Modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2411995-12-19019 December 1995 Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B ML17332B0131995-11-10010 November 1995 Proposed Tech Specs Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9991995-10-20020 October 1995 Proposed Tech Specs Adding Exemption to TS 4.0.4 in SR for MSIV ML17332A9151995-08-0808 August 1995 Proposed Tech Specs Re Deletion of Component Cyclic or Transient Limit Table ML17332A8751995-08-0404 August 1995 Proposed Tech Specs for Repair of Hybrid Expansion Joint Sleeved SG Tubes ML17332A8291995-06-30030 June 1995 Proposed Tech Specs Re Fuel Reconstitution,Per GL 90-02 ML17332A8111995-06-20020 June 1995 Proposed Tech Specs Removing Fire Protection Systems from Licenses 1999-09-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] |
Text
ATTACHMENT 1 TO AEP:NRC:00286 DONALD C.COOK NUCLEAR PLANT UNIT 1'PPENDIX'A'ECHNICAL SPECIFICATIONS CHANGE NO.1 Revisions to Table 3.3-10"Fire Protection Instrumentation" These changes, involve revisions to Table 3.3-10 entitled,"Fire Detection Instrumentation" on pages 3/4 3-52 and 3-53.(a)The minimum number of thermistor detectors specified for the Containment
-quadrants 1, 2, 3 and 4 do not agree with the as built installation of the thermistor detection system for the containment cable trays.This change has been discussed with members of the NRC staff and is consistent with the requirements of the fire protection program fo r the Donald C.Cook Nuclear Plant.This change was previously submitted via our December 22, 1978 letter (AEP:NRC:00109) and is resubmitted here for completeness since other changes to this table are necessary.(b)This change updates the smoke (ionization) detection requirements to reflect the addition of detectors to certain plant areas in accordance
~with fire protection modifications made to the Cook Plant.The upgraded detection capability is described in the fire protection SER and is consistent with our submittals referenced therein.(c)This change reflects the optical (infrared) detection instrumentation added to certain areas of Cook Plant and is in accordance with the requirements of the fire protection SER and is consistent with our previous submittals referenced therein.This change consists of an additional column of instruments listed on Table 3.3-10.The revised pages are attached.These changes will not adversely affect the health and'safety of the public.CHANGE NO.2.Revision to Table 3.7-5"S ra and or S rinkler S stems" This change reflects the closed head sprinkler type water suppression systems added to certain plant areas in accordance with the requirements of the fire protection SER and is consistent with our previous submittals referenced therein.The new sprinkler systems were added to the auxiliary building on elevations 587 feet and 609 feet.These systems provide sprinkler pro-'ection to the corridors, charging pump rooms, safety injection pump rooms and laundry area, and are shared systems with Cook Unit 2.This change also reflects the sprinkler systems added to the reactor coolant pumps.The revised page is attached.These changes will not adversely affect the health (and safety of the, public.
'0 TABLE 3.3-10 FIRE DETECTION INSTRUMENTATION
.INS:F RUMENT ,LOCATION E MINIMUM INSTRUMENTS OPERABLE'I SMOKE.HEAT OPTICAL IONIZATION THERMISTOR INFRARED 1.Containment Zone 6, quadrant 1 Cable Tunnel Zone 7, quadrant 2 Cable Tunnel Zone B,.quadrant 3N Cable Tunnel Zone.9, quadrant 3'able Tunnel Zone 10, quadrant 35 Cable Tunnel Zone 11, (}uadrant 4 Cable Tunnel: quadrant1,..quadrant 2 quadrant 3 quadrant 4 1;HV-'CFT-1 Charcoal Filters 1-HV-CFT-2 Charcoal Filters 2.'ontrol Room~Zone: 22, Control Room 3.Cable Spreading Room'Zone 15, Switchgear Cable Vault Zone 16, Auxiliary Cable Vault Zone 17, Control Room Cable Vault Zone 18, Control Room Cable Vault 4.Diesel Generator::-'."Diesel Generator Room lAB Diesel Generator Room lCD 5.Diesel Fuel Oil Room 3 5 3 3 2 5.24 10 5 24 25 143 18!.11 1 2 3 2 2 2 4 D.C.COOK-UNIT 1 3/4 3-52 Amendment No.
~~~~~I y~TABLE 3.3-10 (Cont'd)FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE 6.Auxiliary Building SMOKE (IONIZATION)
HEAT THERMISTOR OPTICAL INFMREO Zone 1, Zone 2, Zone 3, Zone 4, Zone 5, Elevation 573 ft.Elevation 587 ft.Elevation 609 ft.Elevation 633 ft.Elevation 650 ft.5 42 22 , 31 26 Zone 12, 4 kv Switchgear 3 Zone 13, Engineered Sa fety Swi tchgear 7 Zone 14, CRD Switchgear 6 1-HV-AES-1 Charcoal Filters 1-HV-AES-2 Charcoal Filters 12-HV-AFX Charcoal Filters 1-HV-CPR Charcoal Filters 1-HV-CIPX Charcoal Filters 1-HV-ACRF Charcoal Filters 7.Fuel Storage Zone 19, New Fuel Storage Room 1'1 1 1 1 5 4 0.C.COOK-UNIT 1 3/4 3-53 Amendment No.
'TABLE 3.7-5 SPRAY AND/OR SPRINKLER SYSTEMS~~~r I I r I~e~, l A OPEN HEAD DELUGE TYPE WATER SYSTEMS LOCATION'-HV-ASS-I Charcoal Filters 1-HV-AES-2 Charcoal Filters 12-HV-AFX Charcoal Filters 1-HV-CPR-1
'Charcoal Filters 1-HV-CIPX-1 Charcoal, Filters 1-HV-ACRF-1 Charcoal Filters ACTUATION Electric-heat Electric-heat Electr fc-heat Electric-heat Electric-heat Electric-heat I~s~(a I I I B.CLOSED HEAD SPRINKLER TYPE MATER SYSTEMS LOCATION Auxil fary Bldg.Cask Handling Area" Auxiliary Bldg.Drumming Area*Auxiliary Bldg.Elev.587 8.609*(corridors, charging, safety fnj.pump rooms, laundry area)Reactor Coolant Pumps (4')TYPE SYSTEM Preaction Sprinkler Pr eactfon Sprinkler Preaction Sprinkler Preaction Sprink'ler ACTUATION Ory Pilot Ory Pi1ot Dry Pilot Manual Shared system with D.C.COOK-UNIT 2.0.C.COOK-UNIT 1 3l4 7-~6 Amendment No.
ATTACHMENT 2 TO AEP:NRC'00286 DONALD C.COOK NUCLEAR.PLANT UNIT 2 APPENDIX'A'ECHNICAL SPECIFICATIONS
<;1~~CHANGE NO.1 Revisions to Table 3.3-11;"Fire'Protection Instrumentation" These changes involve revisions to Table 3,3-.11 entitled,"Five Detection-Instrumentation" on pages 3/4 3-51 and 3-52.4 (a)The minimum number of thermistor detectors specified for the Containment quadrants 1, 2, 3 and 4 dog not agree with the as built installation of the thermistor detection system for the containment cable trays.This change has been discussed with members of the NRC staff and is consis-tent with the requirements of the fire protection program for the Donald C.Cook Nuclear Plant.This change was previously submitted via our February 13, 1979 letter (AEP:NRC:00111) and is resubmitted here for completeness since other changes to this table are necessary.(b)This change updates the smoke (ionization)detection requirements to reflect the addition of detectors to certain plant areas in accordance with fire protection modifications made to the Cook Plant.The upgraded detection capability is described in the fire protection SER and is consistent with our submittals referenced therein.(c)This change reflects the optical (infrared) detection instrumentation added to certain areas of Cook Plant and is in accordance with the requirements of the fire protection SER,and is consistent of an additional column of instruments listed on Table 3.3-11.The revised pages are attached.These changes will not adversely affect the health and safety of the public.CHANGE NO.2 Revision to Table 3.7-5"S ra and or S r inkier S stems" This changes reflects the closed head sprinkler type water suppression systems added to certain plant areas in accordance with the requirements of the fire protection SER and is consistent with our previous submittals referenced therein.The new sprinkler systems were added to the auxiliary building on elevations 587 feet and 609 feet.These systems provide sprinkler protection to the corridors, charging pump rooms, safety injection pump.rooms laundry area and are shared systems with Cook Unit 1.This change also reflects the spri.nkler systems added to the reactor coolant pumps.The revised page is attached.These changes will not adversely affect the health and safety of the public.
TABLE 3.3-11 FIRE DETECTION Ii'INSTRUMENTATION I t P INSTRUYiENT LOCATION 1 Containment MINIMiUM INSTRUMEiNTS OPERABLE SMOKE HEAT t'PTICAL IONIZATION THERMISTOR
~IN RAREO\Zone 1, Quadrant 1 Cable Tunnel Zone 2, Quadrant 2 Cable Tunnel Zone 3, Quadrant 3N Cable Tunnel Zone 4, Quadrant 3M Cable Tunnel Zone 5, Quadrant 3S Cable Tunnel Zone 6, Quadrant 4 Cable Tunn 1 Quadrant 1 Quadrant 2 Quadrant 3 Quadrant 4 2-HV-CFT-1 Charcoal Filters 2-HV-CFT-2 Charcoal Filters 2.Control Room , Zone 16, Control Room 3;Cable Spreading Room Zone 10, Switchgear Cable Vault Zone ll, Auxiliary Cable Vault Zone 12, Con.rol Room Cable Vault Zone 13, Control Room Cable Vault 4.Diesel Generator Diesel Generator Room 2AB Diesel Generator Room ZCD 5.Diesel Fuel Oil Room 3 5 3'2 5 22 8 5 24 25 12 5:23~'I 2 3 2 i Il2 2 D.C.COOK-UNIT 2 3/4 3-51
3~TABI E 3.3-11 (Cont'd)FIRE OETECTION INSTRUMENTATION INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPEPABLE T 6.Auxiliary Building SMOKE IONIZATION)
HEAT OPTICAL THERMISTOR (INFRAREO)
Elevation 573 Elevation 587 Elevation 609 Elevation 633'Elevation 650 ft*ft*ft.*ft.*ft*5 42 22 31, 26 Zone 7, 4 Kv Switchgear Zone 8, Engineered Safety Switchgear Zona 9, CRD Switchgear 2-HV-AES-1 Char coal Fil ters 2-HV-AES-2 Charcoal Filters 12-HY-AFX Charcoal Fi1ters'2-HY-CPR Charcoal Filters 2-HY-CIPX Charcoal Filters 2-HV-ACRF Charcoal Filters 7.Fuel Storage New Fuel Storage Room*3 7 6 5 4~TT.i T 0.T.TTTK-IIIITT 0.C.COOK-UNIT 2 3/4 3-52
r~~M~~>.t~~4 E a V PLANT SYSTEMS SURVEILLANCE RE UIREHENTS Continued 2.By inspection of deluge and preaction type system spray headers, to verify their integrity.
3.By inspection of each open head de1uge nozzle to verify no blockage.c.At least once per 3 years.by performing an air flow test through each open head deluge header and verifying each open head deluge nozzIe is unobstructed.
D.C.COOK-UNi'T 1 3(4 7-45 Amendment'No.22 C.~'~-I Nk~~e TABLE 3.T-5 SPRAY AND/OR SPRINKLER SYSTEiMS A OPEN HEAD DELUGE TYPE WATER SYSTEMS h h LOCATION 2-HV-AES-1 Charcoal Fil te ACTUATION rs Hectric-heat 2-HV-AES-2 Char coal Fil ters 12-HV-AFX Charcoal-Fi1 ters 2-HV-CPR-1 Charcoal Filters 2-HV-CIPX-1 Charcoal Filters 2-HV-ACRF-1 Charcoal Filter Electri c-heat ETectric-heat Electric-heat Hectric-heat Gectric-heat C B.CLOSED HEAD SPRIiNKLER TYPE MATER SYSTEMS LOCATION Auxiliary Bldg.Cask Handling Ar ea*Auxiliary Bldg.Drumming Ar'ea*Auxiliary Bldg.Elev.587&609*/Corridors, charging, safety Inj.pump rooms, laundry are/Reactor Coolant Pumps (4)TYPE SYSTEM Preaction Sprinkler Preaction Sprinkler Preaction Sprinkler Preaction Sprinkler ACTUATION Ory Pilot Ory Pilot Dry Pilot Manual Shared system with O.C.COOK-UNIT T.Q.C.COOK-UNIT 2 3/4 7-41
<p.R REC>0 p+c/y++*++80O50V<SS p~UNITED STATES NUCLEAR REGULATORY COMMISSION SVASHINGTON, D.C.20555'pss 0 g 1990 Docket No.50-316 P fir.John E.Dolan, Vice President.Indiana and Michigan Electric Company P.0.Box 18 Bowling Green Station Hew York, New York 10004
Dear Hr.Dolan:
On March 18, 1980 you provided information by letter which supports our'eview'of your proposed Technical Speci fication changes to the power peaking limits of the Donald C.Cook Unit No.2.With this submittal, we find that I<CAP-9566 Westinghouse proprietary report is not a necessary basis for our r'eview of your proposed change.Therefore, MCAP 9566 is hereby returned as you requested in your letter dated February 12, 1980.Sincerely,
Enclosure:
As stated A.Schwencer, Chief Operating Reactors Branch dl Division of Operating Reactors cc: See next page tao~eat t o+Abli o be pLthhegd Xo DXsol osme:~
".".C.N.Dunn Duquesne Light Company cc: Gerald Charnoff, Esquire Jay E.Silberg, Esquire Shaw, P ittman, Potts and Trowbridge 1800 i+i Street, H.W.Washington, D.C.20036 Mr.James A.Werling Plant Superintendent Beaver Valley Power Station P.0.Box 4 Shi ppi ngp ort, P ennsy 1 va ni a 15077 Karin Carter, Esquire Special Assistant Attorney General Bureau of Administrative Enforcement 5 h Floor, Executive House Harri sburg, P ennsyl vani a 17120 Mr.Roger Tapan Stone and Webster Engineering Corporation P.0.Box 2325 Boston, Massachusetts 021 07 Mr.F.l)oon R 8 0 Center Westinghouse Electric Corporation Building 7-303 Pi tts burgh, P ennsyl va ni a 15230 B.F.Jones Memorial Libra'ry 663 Franklin Avenue.Aliquippa, Pennsylvania 15001 Mr.John Carey, Dir ctor Nuclear Operations Duquesne Light, Company 435 Sixth Avenue P it ts burgh, P ennsy1 va ni a 15219 Mr.R.E, Martin Duquesne Light Company 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Mr.John A.Levin Public Utility Coranission P.0.Box 3265 Harri sburg, P ennsy1 vani a 17120 Mr.J.D.Sieber, Superintendent of Licensing and Compliance Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077 Marvin Fein Utility Counsel City of Pittsburgh 313 City-County Building Pittsburgh, Pennsylvania 15219