Confirms Understanding Reached During 830224 Joint Tva/Westinghouse Demo Licensing Meeting Re Licensing Submittals for Quad+ Demonstration Assemblies for NRC Review of Cycle 6 Reload
ML18025B979
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/27/1983
From: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NS-EPR-2784, NUDOCS 8307070079
Download: ML18025B979 (4)


Text

REGULATORY

~FDRMATION DISTRIBUTION SY EM (RIDS)ACCESSION NBR 8307070079 DOC.DATE: 83/06/27 NOTARIZED:

NO FACIL:50-260 Browns Ferrv Nuclear Power Stationi Unit 2i Tennessee AUTH.NAME AUTHOR AFFILIATION.

RAHEiE.P.Nestinahouse Electr,ic Coro.REC IP.NAME RECIPIENT AFFILIATION EISENHUT D.G.Division of'icensipa DOCKET¹, 05000260

SUBJECT:

Confirms.understandina peacPed durina 830224,)oing TVA/Nestinahouse demo licensina.meetina re.licensino submittals for QUAD%demonstration assemblies for pRC review of Cvcle 6 reload DISTRIBUTION CODE: YG01S.COPTES RECEIVED!LTR

~" ENCL'IZE: TITLE: Generic Material with no Soecific Distribution NOTES:NMSS/FCAF 1cv 1cv NMSS/FCAF/PM 05000260 RECIPIENT ID CODF/NAME EISENHUTi D G 0 1 INTERNAL: NRR LICCI ARDO RGN1 07 RGN3 09 RGN5 11 COPIES LTTR ENCL RECIPIENT ID CODE/NAME REG FILE I RGN4 03 08 10 COPIES LTTR ENCL EXTERNAL: ACRS NSIC NOTES: 12 04 8 1 NRC PDR NTIS 02 TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 2

~>>>>[I~I'i,'r l 5>>ff lt$~C>>il~, If"'l Ii>>>>II ll*V If>>f~I>>">>a 1>>

Westinghouse Electric Corporation Water Reactor, Divisions Nuclear Technology Dlvts!on Box 355 Pittsburgh Pennsylvania 15230 Mr.D.G.Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Eisenhut:

June 27, 1983 NS-EPR-2784 This letter is to confirmunderstandings reached with the NRC regarding licensing submittals for the gUAD+demonstration assemblies and the NRC review of such submittals.

These understandings were reached'during the joint TVA-'estinghouse demo licensing meeting with the NRC on February 24, 1983.The following licensing plan and sequence of events was agreed to: 1.Westinghouse will submit a generic SQUAD+demonstration assemblies licensing topical for NRC review about two months prior to TVA's submittal of the Browns Ferry Unit 2 Cycle 6 reload licensing supplement.

2.TVA will reference this generic report in their reload licensing supplement for Browns Ferry Unit 2 Cycle 6.TVA will submit the reload supplement about four months prior to the expected criticality date of Browns Ferry Unit 2 Cycle 6.3.The NRC review of the demo licensing topical will be consistent with the schedule of Browns Ferry Unit 2 Cycle 6.This review will be consistent with the level of review applicable to demonstration

, programs, conforming to the NRC policy of.en'couraging such programs, and being.differentiated from the level of review performed for a full reload of a new fuel design.4.TVA will issue a letter to the NRC at the time of the submittal of the demo licensing topical'by Westinghouse linking the topical to the Browns Ferry Unit 2 Cycle 6 reload to assure review of the demo topical consistent with the licensing schedule for the Browns Ferry Unit 2 Cycle 6 reload.Very truly yours,.P.Rahe, Jr., Manager Nuclear Safety Department DGB/kk 8307070079 830627 PDR ADOCK 05000260'i")P'DR~(gpr a(y 4~r