Confirms Understanding Reached During 830224 Joint Tva/Westinghouse Demo Licensing Meeting Re Licensing Submittals for Quad+ Demonstration Assemblies for NRC Review of Cycle 6 Reload
ML18025B979
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/27/1983
From: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NS-EPR-2784, NUDOCS 8307070079
Download: ML18025B979 (4)


Text

REGULATORY ~FDRMATION DISTRIBUTION SY EM (RIDS)

ACCESSION NBR 8307070079 DOC.DATE: 83/06/27 NOTARIZED: NO DOCKET ¹,

FACIL:50-260 Browns Ferrv Nuclear Power Stationi Unit 2i Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION.

RAHEiE.P. Nestinahouse Electr,ic Coro.

REC IP. NAME RECIPIENT AFFILIATION EISENHUT D.G. Division of'icensipa

SUBJECT:

Confirms.understandina peacPed durina 830224,)oing TVA/Nestinahouse demo licensina.meetina re.licensino submittals for QUAD% demonstration assemblies for pRC review of Cvcle 6 reload DISTRIBUTION CODE: YG01S . COPTES RECEIVED!LTR TITLE: Generic Material with no Soecific

~ " ENCL Distribution

'IZE:

NOTES:NMSS/FCAF 1cv 1cv NMSS/FCAF/PM 05000260 RECIPIENT COPIES RECIPIENT COPIES ID CODF/NAME LTTR ENCL ID CODE/NAME LTTR ENCL EISENHUTi D G 0 1 INTERNAL: NRR LICCI ARDO REG FILE 03 RGN1 07 I 08 RGN3 09 RGN4 10 RGN5 11 EXTERNAL: ACRS 12 8 NRC PDR 02 NSIC 04 1 NTIS NOTES:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 2

~ >>>>

[ I ~ I' Ii >>>>II i, 'r l 5>> ff lt $ ~ C>> il

~, If"'l ll

  • V If >>f ~ I>> ">>

a 1 >>

Westinghouse Water Reactor, Nuclear Technology Dlvts!on Electric Corporation Divisions Box 355 Pittsburgh Pennsylvania 15230 June 27, 1983 Mr. D. G. Eisenhut, Director NS-EPR-2784 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Eisenhut:

This letter is to confirmunderstandings reached with the NRC regarding licensing submittals for the gUAD+ demonstration assemblies and the NRC review of such submittals. These understandings were reached'during the joint TVA-

'estinghouse demo licensing meeting with the NRC on February 24, 1983. The following licensing plan and sequence of events was agreed to:

1. Westinghouse will submit a generic SQUAD+ demonstration assemblies licensing topical for NRC review about two months prior to TVA's submittal of the Browns Ferry Unit 2 Cycle 6 reload licensing supplement.
2. TVA will reference this generic report in their reload licensing supplement for Browns Ferry Unit 2 Cycle 6. TVA will submit the reload supplement about four months prior to the expected criticality date of Browns Ferry Unit 2 Cycle 6.
3. The NRC review of the demo licensing topical will be consistent with the schedule of Browns Ferry Unit 2 Cycle 6. This review will be consistent with the level of review applicable to demonstration

, programs, conforming to the NRC policy of. en'couraging such programs, and being .differentiated from the level of review performed for a full reload of a new fuel design.

4. TVA will issue a letter to the NRC at the time of the submittal of the demo licensing topical 'by Westinghouse linking the topical to the Browns Ferry Unit 2 Cycle 6 reload to assure review of the demo topical consistent with the licensing schedule for the Browns Ferry Unit 2 Cycle 6 reload.

Very truly yours,

. P. Rahe, Jr., Manager Nuclear Safety Department DGB/kk (gpr P 'DR 8307070079 830627 PDR ADOCK 05000260 'i")