Category:Inspection Plan
MONTHYEARML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) IR 05000387/20220052022-08-31031 August 2022 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2022005 and 05000388/2022005) IR 05000387/20210062022-03-0202 March 2022 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2021006 and 05000388/2021006) ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21236A2662021-11-0808 November 2021 Ti 2515/194 Inspection Documentation Request ML21312A1012021-11-0808 November 2021 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000387/2022011 IR 05000387/20210052021-09-0101 September 2021 Updated Inspection Plan for the Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2021005 and 05000388/2021005) ML21210A2232021-07-29029 July 2021 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000387/2021010 and 05000388/2021010 IR 05000387/20200062021-03-0303 March 2021 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006) IR 05000387/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000387/2020005 and 05000388/2020005) ML20149K4492020-05-28028 May 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000387/20190062020-03-0303 March 2020 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2019006 and 05000388/2019006) ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request IR 05000387/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000387/2019005 and 05000388/2019005) ML19191A0652019-07-10010 July 2019 Information Request for Triennial Baseline Design Bases Assurance Inspection (Team); Notification to Perform Inspection 05000387/2019011 and 05000388/2019011 IR 05000387/20180062019-03-0404 March 2019 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2018006 and 05000388/2018006) IR 05000387/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000387/2018005 and 05000388/2018005) IR 05000387/20170062018-02-28028 February 2018 Annual Assessment Letter for Susquehanna Units 1 and 2 (Report 05000387-2017006 and 05000388-2017006 Report 05000387-2017402 and 05000388-2017402 Report 05000387-2017501 and 05000388-2017501) IR 05000387/20170052017-08-28028 August 2017 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 Letter with Report 22 (Report 05000387/2017005 and 05000388/2017005) IR 05000387/20160062017-03-0101 March 2017 Annual Assessment Letter for Susquehanna Units 1 and 2 Report Nos. 05000387/2016006 and 05000388/2016006 IR 05000387/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, (Report 05000387/2016005 and 05000388/2016005) IR 05000387/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Inspection Report 05000387/2015006 and 05000388/2015006) IR 05000387/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2015005 and 05000388/2015005) IR 05000387/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2014001 and 05000388/2014001) IR 05000387/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000387-14-006 and 0500388-14-006 IR 05000387/20130012014-03-0404 March 2014 ROP-14 2013 Susquehanna Steam Electric Station, Units 1 & 2, Annual Assessment Letter for Report 05000387/2013001 and 05000388/2013001 and Inspection Plan IR 05000387/20130062013-09-0303 September 2013 Mid-cycle Performance Review and Inspection Plan Report 05000387-13-006 and 05000388-13-006 IR 05000387/20120012013-03-0404 March 2013 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012001 and 05000388-12-001) IR 05000387/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012006 and 05000388/2012006) IR 05000387/20110012012-03-0101 March 2012 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2011001 and 05000388/2011001) ML1124304692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Susquehanna Steam Electric Station, Units 1 and 2 IR 05000387/20100012011-03-0404 March 2011 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, EOC-11 (Report 05000387/2010001 and 05000388/2010001) ML1024404622010-09-0101 September 2010 IR 05000387-10-001 and 05000388-10-001 on 08/11/2010 for Susquehanna Steam Electric Station, Units 1 & 2, Mid-Cycle Assessment Letter 2010 ML1006210392010-03-0303 March 2010 Annual Assessment Letter - Susquehanna Steam Electric Station, Units 1 and 2 (05000387-10-001 and 05000388-10-001) ML0924402702009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Susquehanna Steam Electric Station IR 05000387/20090012009-03-0404 March 2009 Annual Assessment Letter - Susquehanna Steam Electric Station (05000387-09-001 and 05000388-09-001) ML0824704642008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Susquehanna ML0734707322007-12-13013 December 2007 ROP 8 - Susquehanna - Change to Inspection Plan, 12/13/07 ML0724306552007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000387/20070012007-03-0202 March 2007 Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05000387/2007001 and 05000388/2007001) ML0624305252006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Susquehanna Steam Electric Station ML0606204502006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05-387/2006001 and 05-388/2006001) ML0524207002005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Susquehanna ML0718301432005-03-14014 March 2005 CH-ER-314, Rev 1, SSES Environmental Inspection Plan Procedure. IR 05000387/20050012005-03-0202 March 2005 Annual Assessment Letter for 05000387-05-001 and 05000388-05-001 ML0424404422004-08-30030 August 2004 2004 Susquehanna Mid Cycle Performance Review and Inspection Plan IR 05000387/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Susquehanna Steam Electric Station (Report 50-387/03-01, 50-388/03-01) ML0223804822002-08-26026 August 2002 2002 Susquehanna Mid-Cycle Performance Review and Inspection Plan 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
T.Rausch
T. Rausch 2 T.Rausch3
Susquehanna
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
EQ PROGRAM
1, 2 01/22/2018
01/26/2018
IP 71111.21N
000714 Design Bases Assurance Inspection (Programs)
1, 2 02/05/2018
02/09/2018
IP 71111.21N
000714 Design Bases Assurance Inspection (Programs)
ACCESS AUTH & CONTROL, SGI CONTROL, FFD
1, 2 01/29/2018
02/02/2018
IP 71130.01
000733 Access Authorization
1, 2 01/29/2018
02/02/2018
IP 71130.02
000734 Access Control
1, 2 01/29/2018
02/02/2018
IP 71130.06
000738 Protection of Safeguards Information
1, 2 01/29/2018
02/02/2018
IP 71130.08
000740 Fitness For Duty Program
1, 2 01/29/2018
02/02/2018
IP 71151 001338 Performance Indicator Verification
SUSQUEHANNA INITIAL OL EXAM
1, 2 02/04/2018
02/09/2018
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 03/05/2018
03/16/2018
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
TRIENNIAL HEAT SINK
1, 2 02/26/2018
03/02/2018
IP 71111.07T
000700 Heat Sink Performance -Triennial
UNIT 1 INSERVICE INSPECTION
1 04/09/2018
04/13/2018
IP 71111.08G
000701 Inservice Inspection Activities - BWR
HP INSPECTION
1 04/09/2018
04/13/2018
IP 71124.01
000725 Radiological Hazard Assessment and Exposure Controls
04/09/2018
04/13/2018
IP 71124.02
000726 Occupational ALARA Planning and Controls
1, 2 04/09/2018
04/13/2018
IP 71124.03
000727 In-Plant Airborne Radioactivity Control and Mitigation
HP INSPECTION
1, 2 06/04/2018
06/08/2018
IP 71124.02
000726 Occupational ALARA Planning and Controls
1, 2 06/04/2018
06/08/2018
IP 71124.04
000729 Occupational Dose Assessment
1, 2 06/04/2018
06/08/2018
IP 71124.05
000729 Radiation Monitoring Instrumentation
PI&R BIENNIAL
1, 2 06/11/2018
06/15/2018
IP 71152B 000747 Problem Identification and Resolution
1, 2 06/25/2018
06/29/2018
IP 71152B 000747 Problem Identification and Resolution
1/29/2018 5:00:15 PM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Susquehanna
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
FORCE-ON-FORCE PLANNING &EXERCISE WEEK
1, 2 07/16/2018
07/20/2018
IP 71130.03
000735 Contingency Response - Force-On-Force Testing
1, 2 08/06/2018
08/10/2018
IP 71130.03
000735 Contingency Response - Force-On-Force Testing
RETS
1, 2 08/06/2018
08/10/2018
IP 71124.06
000730 Radioactive Gaseous and Liquid Effluent Treatment
50.59 PROCESS
1, 2 08/20/2018
08/24/2018
IP 71111.17T
000709 Evaluations of Changes, Tests, and Experiments
RADWASTE
1, 2 09/17/2018
09/21/2018
IP 71124.08
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
MC&A
1, 2 09/24/2018
09/28/2018
IP 71130.11
000742 Material Control and Accounting (MC&A)
EP EXERCISE INSPECTION
1, 2 10/15/2018
10/19/2018
IP 71114.01
000716 Exercise Evaluation
1, 2 10/15/2018
10/19/2018
IP 71151 001397 Performance Indicator Verification
CYBER FULL IMP
1, 2 10/15/2018
10/19/2018
IP 71130.10P
000741 Cyber Security
1, 2 10/29/2018
11/02/2018
IP 71130.10P
000741 Cyber Security
BASELINE HP & PI VERIFICATION
1, 2 12/10/2018
12/14/2018
IP 71124.01
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 12/10/2018
12/14/2018
IP 71124.02
000726 Occupational ALARA Planning and Controls
1, 2 12/10/2018
12/14/2018
IP 71124.03
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 12/10/2018
12/14/2018
IP 71124.04
000729 Occupational Dose Assessment
1, 2 12/10/2018
12/14/2018
IP 71151 000746 Performance Indicator Verification
ACCESS CONTROL, EQUIP PERF, TRAINING
1, 2 02/11/2019
02/15/2019
IP 71130.02
000734 Access Control
1, 2 02/11/2019
02/15/2019
IP 71130.04
000736 Equipment Performance, Testing, and Maintenance
1, 2 02/11/2019
02/15/2019
IP 71130.07
000739 Security Training
1, 2 02/11/2019
02/15/2019
IP 71151 001338 Performance Indicator Verification
1/29/2018 5:00:15 PM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Susquehanna
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
HP
1, 2 02/25/2019
03/01/2019
IP 71124.01
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 02/25/2019
03/01/2019
IP 71124.02
000726 Occupational ALARA Planning and Controls
INSERVICE INSPECTION - UNIT 2
2 04/22/2019
04/26/2019
IP 71111.08G
000701 Inservice Inspection Activities - BWR
HP
2 04/29/2019
05/03/2019
IP 71124.01
000725 Radiological Hazard Assessment and Exposure Controls
04/29/2019
05/03/2019
IP 71124.02
000726 Occupational ALARA Planning and Controls
1, 2 04/29/2019
05/03/2019
IP 71124.03
000727 In-Plant Airborne Radioactivity Control and Mitigation
REMP
1, 2 05/20/2019
05/24/2019
IP 71124.07
000731 Radiological Environmental Monitoring Program
SUSQUEHANNA INITIAL OL EXAM
1, 2 05/27/2019
05/31/2019
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 06/24/2019
07/05/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
DESIGN BASES ASSURANCE INSP - TEAMS
1, 2 09/16/2019
09/20/2019
IP 71111.21M
000713 Design Bases Assurance Inspection (Teams)
1, 2 09/30/2019
10/04/2019
IP 71111.21M
000713 Design Bases Assurance Inspection (Teams)
ISFSI OPERATIONAL INSPECTION
1, 2 09/23/2019
09/27/2019
IP 60855 001001 Operation Of An ISFSI
1, 2 09/23/2019
09/27/2019
IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
HP
1, 2 10/21/2019
10/25/2019
IP 71124.01
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/21/2019
10/25/2019
IP 71124.02
000726 Occupational ALARA Planning and Controls
1, 2 10/21/2019
10/25/2019
IP 71124.03
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 10/21/2019
10/25/2019
IP 71124.04
000729 Occupational Dose Assessment
1, 2 10/21/2019
10/25/2019
IP 71124.05
000729 Radiation Monitoring Instrumentation
1, 2 10/21/2019
10/25/2019
IP 71151 000746 Performance Indicator Verification
EP PROGRAM INSPECTION
1, 2 10/23/2019
10/27/2019
IP 71114.02
000717 Alert and Notification System Testing
1/29/2018 5:00:15 PM
Page
of
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
Susquehanna
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
EP PROGRAM INSPECTION
1, 2 10/23/2019
10/27/2019
IP 71114.03
000718 Emergency Preparedness Organization Staffing and Augmentation System
1, 2 10/23/2019
10/27/2019
IP 71114.05
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
1, 2 10/23/2019
10/27/2019
IP 71151 001397 Performance Indicator Verification
SQ REQUAL INSP WITH P/F RESULTS
1, 2 10/28/2019
11/01/2019
IP 71111.11A
000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 1, 2 10/28/2019
11/01/2019
IP 71111.11B
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial 1/29/2018 5:00:15 PM
Page
of