November 8, 2021
Mr. Brad Berryman
Senior Vice President and Chief Nuclear Officer
Susquehanna Nuclear, LLC
769 Salem Blvd., NUCSB3
Berwick, PA 18603
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 - INFORMATION
REQUEST TO SUPPORT POST-APPROVAL SITE INSPECTION FOR
LICENSE RENEWAL; INSPECTION REPORT 05000387/2022011
Dear Mr. Berryman:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region I staff will conduct a license renewal post-approval inspection at your Susquehanna
Steam Electric Station, Unit 1. Niklas Floyd, a Senior Reactor Inspector from the NRCs
Region I office, will lead the inspection team. The inspection will be conducted in accordance
with Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, dated
July 1, 2016 (ADAMS Accession No. ML16013A260). This inspection is described as a
Phase 2 license renewal inspection in the referenced inspection procedure and is conducted
three months to one year prior to the plant entering its period of extended operation.
The inspection will assess the adequacy of the planned and/or completed activities and
programs described in the regulatory commitments and license conditions added as part of your
renewed license. This inspection will also evaluate the need for additional follow-up inspections
(Phase 3) under Inspection Procedure 71003 or as part of the Reactor Oversight Program.
Finally, an inspector will perform a license renewal inspection (Phase 1) in April 2022 to observe
implementation of aging management programs and activities that are only accessible during a
scheduled plant outage.
This onsite Phase 2 inspection is scheduled for the weeks of January 11 and January 25, 2022.
In order to minimize the impact on the site and to ensure a productive inspection for both
parties, we have enclosed a request for information needed for the inspection. It is important
that these documents are up-to-date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
Insofar as possible, this information should be provided electronically to the lead inspector. The
information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the team will identify as
much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the lead inspector by December 27, 2021.
B. Berryman
2
The second group includes the additional information required for the team to review the
selected activities. This information should be provided to the team by January 4, 2021
or made available upon arrival onsite January 11, 2022.
If there are any questions about the inspection or the information requested in the enclosure,
please do not hesitate to contact the lead inspector at 610-337-5282 or via e-mail at
Niklas.Floyd@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
Mel Gray, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Docket No. 50-387
License No. NPF-14
Enclosure:
Information Request Post-Approval
Site Inspection for License Renewal - Phase 2
cc: Distribution via ListServ
Melvin K.
Gray
Digitally signed by Melvin
K. Gray
Date: 2021.11.08 11:17:47
-05'00'
x
SUNSI Review
x
Non-Sensitive
Sensitive
x
Publicly Available
Non-Publicly Available
OFFICE RI/DORS
RI/DORS
NAME
NFloyd
MGray
DATE
11/8/21
11/8/21
INFORMATION REQUEST
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE II
Inspection Report: 05000387/2022011
Onsite Inspection Dates:
January 10, through January 14, 2022; and
January 24, through January 28, 2022
Inspection Procedure:
Inspection Procedure 71003, Post-Approval Site Inspection for
License Renewal, dated July 1, 2016
Lead Inspector:
Niklas Floyd, Senior Reactor Inspector
610-337-5282
Niklas.Floyd@nrc.gov
I.
Information Requested Prior to the On-site Inspection Week (General Info)
The following information is requested by December 27, 2021, or sooner, to facilitate
inspection preparation. This section of the request identifies general information that will
help the inspectors to understand the applicable administrative procedures and overall
completion status of license renewal activities. As such, the information requested herein is
not aimed to a particular regulatory commitment, license condition, aging management
program (AMP), or time-limited aging analysis (TLAA).
Feel free to contact the lead inspector as soon as possible if you have any questions
regarding this information request. Please provide the information electronically in pdf files,
Excel, or other searchable formats, preferably on some portable electronic media (e.g., CD-
ROM, DVD, etc.). The files should contain descriptive names, be indexed, and hyperlinked
to facilitate ease of use. Information in lists should contain enough information to be easily
understood by someone who has knowledge of light water reactor technology.
(1)
Sections of the quality assurance program manual applicable to license renewal
activities.
(2)
Copies of the following procedures:
Correction Action Program
Operating Experience
Regulatory Commitment Change Process
(3)
Updated Final Safety Analysis Report (UFSAR) supplement for license renewal
submitted with the license renewal application (LRA), including the latest version of the
UFSAR supplement submitted to the NRC per 10 CFR 50.71.
(4)
Post-approval evaluations or assessments performed to verify that in-scope structures,
systems, or components (SSCs) were not excluded from the LRA and appropriate
aging management has been considered in accordance with 10 CFR 54.37(b).
(5)
List of plant modifications with a brief description of the modification scope that were
approved and/or implemented from the date the LRA was submitted to the date the
renewed license was issued.
INFORMATION REQUEST
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE II
(6)
Self-assessments performed after the renewed license was issued associated with the
implementation of license renewal commitments, including AMPs and TLAAs.
(7)
Gap analyses performed to assess the differences between the current AMPs and
the recommendations in the latest revision of NUREG-1801, Generic Aging Lessons
Learned (GALL), and subsequent NRC Interim Staff Guidance.
(8)
Site-specific responses and/or evaluations for NRC generic communications
associated with license renewal that were issued after the renewed license was
granted.
(9)
List of your license renewal commitments with a description of the overall completion
status of action items associated with each commitment, including AMPs and TLAAs.
(10) Description of administrative controls that will be used to ensure that all activities due
prior to (and during) the period of extended operation (PEO) will be satisfactorily
completed as described in the license renewal documents.
(11) Description of plans or processes that would be used during the PEO to continuously
incorporate operating experience into license renewal activities.
(12) Internal/external self-assessment and associated corrective action documents
generated in preparation for this inspection.
(13) License renewal organizational chart and points of contact for this inspection, including
the appropriate regulatory assurance, engineering, and license renewal staff.
II. Information Requested to Be Available by January 4, 2022 (Specific Requests for each
License Renewal Commitment, including associated AMP and TLAA)
The following information should be separated for each regulatory commitment, especially if
provided electronically (e.g., a folder for each commitment named after the commitment that
includes the information requested below). The commitment should include the associated
AMP and TLAAs. This section is focused on documentation demonstrating completion of
each specific license renewal commitment.
(1)
Program basis documents and administrative procedures describing key program
attributes such as program objectives, scope, detection and monitoring methods,
administrative controls, acceptance criteria, corrective actions, and scope expansion
requirements.
(2)
Implementing procedures for program activities (e.g., visual examination procedures,
ultrasonic examination procedures, maintenance procedures, system walkdowns, etc).
(3)
Updated license renewal scoping drawings showing the SSCs within the scope of the
AMP.
(4)
Applicable sections of the LRA and the NRCs safety evaluation report.
INFORMATION REQUEST
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE II
(5)
Applicable Requests for Additional Information issued by NRCs technical reviewers
during the review of the LRA and corresponding responses.
(6)
Copy of or ready access to the key industry standards that will be followed during the
PEO for the implementation of the program (e.g., American Society of Mechanical
Engineers Boiler and Pressure Vessel Code, Electric Power Research Institute
Guidelines, Nuclear Energy Institute Guidelines, etc).
(7)
Description of changes made to the license renewal commitment, including the
associated technical and regulatory evaluations supporting the change.
(8)
Description of activities completed to meet license conditions, license renewal
commitments, and the UFSAR. For example, this should include completed Work
Orders with associated inspection reports describing the work done and the results of
the inspection.
(9)
Description of instances where examination scope expansion was required based on
the initial examination of an SSC for license renewal. Please describe the logic to
select the scope expansion, and any resulting changes to the AMP.
(10) Description of instances where examination scope changes were required based on
limitations encountered during the initial examination of an SSC for license renewal.
Please describe the actions taken, and any resulting changes to the AMP.
(11) Description of pending activities due prior to the PEO, which are necessary to meet
license conditions, license renewal commitments, and the activities described in the
UFSAR. For example, this may include a list of pending Work Orders with a brief
description of the work to be performed.
(12) Copy of any correspondence between the licensee and the NRC, after the license was
issued, associated with regulatory issues affecting the license renewal commitment.
For example, this may include notifications of commitment changes, or license
amendment requests, affecting a license condition or a license renewal commitment.
(13) List of Corrective Action Program documents (e.g., Condition Reports) associated with
the implementation of the AMP. This includes unacceptable aging effects identified
during the implementation of license renewal activities and programmatic deficiencies
requiring resolution.
(14) Copy of evaluations performed for applicable external/internal Operating Experience
issues associated with license renewal. This request is limited to Operating Experience
items issued after the renewed operating license was granted.
INFORMATION REQUEST
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE II
III. Information Requested to be Provided Throughout the Inspection
(1)
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
(2)
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (please provide daily during the
inspection to each team member).