IR 05000387/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 Letter with Report 22 (Report 05000387/2017005 and 05000388/2017005)
ML17236A032
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/28/2017
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Rausch T
Susquehanna
Schroeder D
References
IR 2017005
Download: ML17236A032 (4)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 (REPORT 05000387/2017005 AND 05000388/2017005)

Dear Mr. Rausch:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Susquehanna Steam Electric Station Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Please contact me at 610-337-5262 with any questions that you may have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Docket Nos.

50-387 and 50-388 License Nos. NPF-14 and NPF-22

Enclosure:

Inspection Plan

cc: Distribution via ListServ

ML17236A032

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME SBarber/SB DSchroeder/DLS

DATE 8/22/17 8/28/17