IR 05000335/2014001

From kanterella
Revision as of 06:32, 11 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for St. Lucie Plant Unit 1 and Unit 2, (Report 05000335/2014001 and 05000389/2014001)
ML15063A386
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/04/2015
From: Munday J T
Division Reactor Projects II
To: Nazar M
Nextera Energy
References
IR 2014001
Download: ML15063A386 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 4, 2015 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, FL 33408

-0420

SUBJECT: ANNUAL ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000 335/20 14 00 1 AND 05000 389/20 14 00 1)

Dear Mr. Nazar:

On February 11, 201 5, the NRC completed its end-of-cycle performance review of St. Lucie Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 , 20 1 4 , through December 31

, 20 1 4. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at St. Lucie Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix. St. Lucie Unit 1 moved to the Regulatory Response column of the Action Matrix beginning in the third quarter of 2014 as the result of a finding with low to moderate safety significance (White) in the Mitigating Systems cornerstone. The finding was associated with the failure to maintain the watertight integrity of the Unit 1 Reactor Auxiliary Building. On December 19, 2014, the NRC completed a supplemental inspection using Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area

," for Unit 1. Based on the results of this inspection, as documented in inspection report 05000335/2014011 (ADAMS Accession No. ML15027A197), the NRC determined that your actions were sufficient to address the performance issues that led to the White (low to moderate safety significance) violation

. This finding will remain an Action Matrix input until the end of the second quarter 2015. The NRC plans to conduct ROP baseline inspections at St. Lucie Unit 1 during the upcoming inspection cycle

.

The NRC determined that overall, St. Lucie Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at St. Lucie Unit 2. The enclosed inspection plan lists the inspections scheduled through June 30 , 20 1 6. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

The NRC also plans on conducting thre e non-routine inspections.

Temporary Instruction 2515/190, "Inspection of Licensee's Proposed Interim Actions as a Result of the Near

-Term Task Force Recommendation 2.1 Flooding Reevaluation ," IP 71003, "Post-Approval Site Inspection for License Renewal,"

Phases 1 and 2, and IP 92702, "Followup on Corrective Actions for Violations and Deviation s." In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact Eric Stamm at (404) 997

-45 75 with any questions you may have regarding this letter.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Projects

Docket Nos.: 50-335, 50-389 License Nos.

DPR-67, NPF-16 Enclosure:

St. Lucie Inspection/Activity Plan (01/01/2015

- 06/30/201 6) cc Distribution via List Serv

________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE EJS2 JTM NAME E.Stamm J.Munday DATE 03/04/2015 03/05/2015 E-MAIL COPY?

YES NO YES NO Letter to Mano Nazar from Joel T. Munday dated March 4, 2015.

SUBJECT: ANNUAL ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000 335/20 1 4 00 1 AND 05000 389/20 1 4 00 1)

Distribution w/encl

D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Page 1 of 2 03/04/2015 09:42:00 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Saint LucieInspection / Activity Plan 03/01/2015

-06/30/2016 MODS-PLANT MODIFICATIONS INSPECTION 4 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/02/2015 03/06/2015OL EXAM-INITIAL LICENSE EXAM 3 1 ST LUCIE/MARCH 2015 EXAM AT POWER FACILITIES V23369 03/02/2015 03/13/2015 LR-UNIT 1 POST APPROVAL LR PHASE 1 1 1 IP Post-Approval Site Inspection for License Renewal 71003 03/30/2015 04/10/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 03/30/2015 04/03/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/30/2015 04/03/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/30/2015 04/03/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/30/2015 04/03/2015 1, 2 IP Occupational Dose Assessment71124.04 03/30/2015 04/03/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/30/2015 04/03/2015 1, 2 IP Performance Indicator Verification71151 03/30/2015 04/03/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/13/2015 04/17/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 04/13/2015 04/17/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/13/2015 04/17/2015 1, 2 IP Occupational Dose Assessment71124.04 04/13/2015 04/17/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 04/13/2015 04/17/2015 1, 2 IP Performance Indicator Verification71151 04/13/2015 04/17/2015 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/14/2015 09/18/2015 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/21/2015 09/25/2015 LR-POST APPROVAL LR PHASE 2 6 1, 2 IP Post-Approval Site Inspection for License Renewal 7100311/02/201511/06/2015 1, 2 IP Post-Approval Site Inspection for License Renewal 7100311/16/201511/20/2015OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B11/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection711112101/11/2016 01/15/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 03/04/2015 09:42:00 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Saint LucieInspection / Activity Plan 03/01/2015

-06/30/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection7111121 02/08/2016 02/12/2016 1, 2 IP Component Design Bases Inspection7111121 02/22/2016 02/26/2016 1, 2 IP Component Design Bases Inspection7111121 03/07/201603/11/2016 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/25/2016 01/29/2016 1, 2 IP Radiological Environmental Monitoring Program71124.07 01/25/2016 01/29/2016 1, 2 IP Performance Indicator Verification71151 01/25/2016 01/29/2016 EP-EP EXERCISE INSPECTION 2 1, 2 IP Exercise Evaluation7111401 02/22/2016 02/26/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 02/22/2016 02/26/2016 1, 2 IP Performance Indicator Verification71151 02/22/2016 02/26/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 05/09/2016 05/13/2016 1, 2 IP Problem Identification and Resolution71152B 05/23/2016 05/27/2016 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/2016 1, 2 IP Fire Protection [Triennial]7111105T 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.