ISFSI - Operator Licensing Examination Data for Calendar Years 2018 - 2021
ML16202A500
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/20/2016
From: Northard S
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-PI-16-064, RIS-2016-09
Download: ML16202A500 (3)


Text

1717 Wakonade Drive Welch, MN 55089 800.895.4999 xcelenergy.com JUL 2 D 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 (l Xcel Energy* RESPONSIBLE BY NATURE L-PI-16-064 RIS 2016-09 NRC Regulatory Issue Summary 2016-09-Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations", dated June 16, 2016, Northern States Power Company, a Minnesota corporation, hereby submits the operator licensing examination data for calendar years 2018 through 2021 for the Prairie Island Nuclear Generating Plant. Enclosed is the corresponding NRC Form 536 for the Station which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Summary of Commitments commitments or changes to any existing commitments.

Scott Northard Acting Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Document Control Desk Page 2 ENCLOSURE Operator Licensing Examination Data for Prairie Island Nuclear Generating Plant, Units 1 and 2 1 page follow NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

  • Estimated burden per response to comply with this volunlal)'

information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This }'0 OPERA TOR LICENSING Information collection Is used to plan budgels and resources ror operator examinations.

Send lJ t.. commenls regarding burden estimale to the FOIA, Privacy, and Information CoDections Branch (T-5 li s F53), U.S. Nuclear Regulatol)'

Commission, Washington, DC20555-000f, or by e-mail to t. EXAMINATION DATA " I lnrocollects.Resource@nrc.gov, and to the Desk Officer, Office or Information and Regulatol)'

Affairs, .. NEOB-10202, (3150-0131), Office or Management and Washington, DC 20503. If a means **** *. used to Impose an Information collection does not display a currenlly valid OMS control number, the NRC may not conduct or sponsor, and a person Is not to respond to, the Information collecUon.

FACILITY NRC REGION Prairie Island Nuclear Generating Plant Ill i A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------NUMBER OF REACTOR 6 0 4 0 OPERATORS

    • -NUMBER OF SENIOR REACTOR 8 0 7 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 0 1 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/17/2018 06/08/2020 ALTERNATE DATE 09/24/2018 06/15/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 -NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 0 11 CANDIDATES NRC FORM 536 (05-2016)