ML20245E574

From kanterella
Jump to navigation Jump to search
ES-301-3
ML20245E574
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/27/2020
From:
Nuclear Management Co
To:
NRC/RGN-III/DRS/OLB
Callaway G
Shared Package
ML19127A304 List:
References
Download: ML20245E574 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: PRAIRIE ISLAND Date of Examination: AUG 2020 Operating Test Number: Pl-ILT-NRC-20 Initials

1. General Criteria c11 a b*
a. The operating test conforms to the previously approved outline; changes are consistent with samplinq requirements(e.o., 10 CFR 55.45, operational impo1iance, safety function distribution). lfl lr,.,,,
b. There is no day-to-day repetition between this and other operating tests to be administered durinq this examination. k (,,,,.1 C. The operating test shall not duplicate items from the applicants' audit test(s) (see Section D.1.a.). Fe tvv
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. fr lv
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. R l.1l,v
2. Walkthrough Criteria .... .... .. ..
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable Fe lv-,/

b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines(Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations) specified on those forms and Form ES-201-2. R /,1,,.,./
3. Simulator Criteria .... .... .. ..

The associated simulator operating tests(scenario sets) have been reviewed in accordance with Form ES-301-4, and a copy is attached. Fe.

Pnnted Na Date

/z..o Fl?e\)R.1 Ck S ILz.oz.o

1
a. Author C,2LLl,Y'>
b. Facility Reviewer(*) C l-1 A. 15 'foN1e,<t WAl r.5 jft:,, .i, '-I .!>* 5/2.-1 h... 01.. 0 C. NRC Chief Examiner (#) Gary W. Callaway 7/30/2020
d. NRC Supervisor Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2020.08.06 15:48:02 -05'00'
  • The facility licensee signature is not applicable for NRG-developed tests.
  1. The independent NRC reviewer initials items in column "c"; the chief examiner concurrence is required.

ES-301, Page 24 of 33