MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports L-PI-22-034, Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing2022-07-14014 July 2022 Response to RAI, Alternative RR-08 Related to Pressure Isolation Valve Monitoring and Testing ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) ML20045E8942020-02-14014 February 2020 Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS ML20127J0002019-11-0707 November 2019 Xcel Reply to PIIC Expansion Application L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 L-PI-18-051, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2018-09-17017 September 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-PI-18-038, Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-07-10010 July 2018 Supplement to License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML18131A2232018-05-11011 May 2018 Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di L-PI-17-042, Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices2017-11-0606 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the NDE Inspection Interval for Special Lifting Devices ML17279A1212017-10-0404 October 2017 Enclosure 2 to L-PI-17-041, Westinghouse-Prepared RAI Responses CE-17-3, Rev. 1, Attachment 2 and Enclosure 3, Marked-Up Technical Specification Page 4.0-7 L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information2017-09-27027 September 2017 License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information L-PI-17-032, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times L-PI-17-007, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2017-03-0606 March 2017 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-17-002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2017-02-16016 February 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-100, Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes2017-02-16016 February 2017 Response to NRC Request for Information - License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-16-090, Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2016-12-14014 December 2016 Response to Request for Additional Information on License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML16351A2102016-12-13013 December 2016 External Flooding Assessment Focused Evaluation. (Redacted) ML16288A0972016-10-14014 October 2016 and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools L-PI-16-076, Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report2016-09-29029 September 2016 Supplement to the Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report ML16279A4792016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information L-PI-16-067, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-08-17017 August 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-063, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-08-17017 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-16-005, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information2016-05-24024 May 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information ML16144A8062016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Response to RAI-2 (Enclosure 1) & Marked-Up Technical Specification Page (Enclosure 2) L-PI-16-040, Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4)2016-05-23023 May 2016 Supplement to License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes: Westinghouse-Prepared Response to RAI, CE-16-237, Attachment 2 (Enclosure 4) ML16133A0412016-05-0909 May 2016 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report L-08-001, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated..2016-04-14014 April 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated.. L-PI-16-029, Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated..2016-03-31031 March 2016 Response to Requests for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2,,Using the Consolidated.. L-PI-16-004, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information2016-01-20020 January 2016 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors- Response to Request for Additional Information L-PI-16-001, Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report2016-01-14014 January 2016 Enclosure 2: Responses to Open and Pending Items from the NRC Audit Report L-PI-15-105, License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request..2015-12-30030 December 2015 License Amendment Request (LAR) to Revise Technical Specifications (TS) to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process - Response to Request.. L-PI-15-052, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses2015-06-19019 June 2015 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors - Response to Request for Additional Information - 90-Day Responses L-PI-14-113, Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-01-16016 January 2015 Updated Final Response to NRC Request for Information Per 10CFR50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident 2024-01-02
[Table view] |
Text
1717 Wakonade Drive Welch, MN 55089 September 30, 2021 L-PI-21-032 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Response to Request for Additional Information RE: Amendment request to adopt TSTF-471 and 571-T for Prairie Island
References:
- 1) Letter (L-PI-21-007) from NSPM to the NRC, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes, dated April 19, 2021 (ADAMS Accession No. ML21109A385)
- 2) Email from the NRC to NSPM, Request for Additional Information RE:
Amendment request to adopt TSTF-471 and 571-T for Prairie Island, dated August 30, 2021 (ADAMS Accession No. ML21252A012)
In Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), submitted a license amendment request to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The proposed amendment would modify TS requirements to adopt TSTF-471, Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes, and TSTF-571-T, Revise Actions for Inoperable Source Range Neutron Flux Monitor. The NRC identified the need for additional information and provided the Request for Additional Information (RAI) in Reference 2. The enclosure to this letter provides NSPMs response to the NRC RAI.
The information provided in this letter does not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1.
NSPM is notifying the State of Minnesota of this request by transmitting a copy of this letter and enclosures to the designated State Official.
Please contact Mr. Jeff Kivi at (612) 330-5788 or Jeffrey.L.Kivi@xcelenergy.com if there are any questions or if additional information is needed.
Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Christopher P. Domingos Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota
L-PI-21-032 NSPM Enclosure Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes, and TSTF-571-T, Revise Actions for Inoperable Source Range Neutron Flux Monitor
1.0 BACKGROUND
In Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter NSPM), submitted a license amendment request to the Technical Specifications (TS) for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The proposed amendment would modify TS requirements to adopt TSTF-471, Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes, and TSTF-571-T, Revise Actions for Inoperable Source Range Neutron Flux Monitor. The NRC identified the need for additional information and provided the Request for Additional Information (RAI) in Reference 2. The following section provides NSPMs response to the NRC RAI.
2.0 RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION 2.1 RAI-1 The amendment proposes to remove Required Action C.2 from LCO 3.9.3. This Required Action is included in the PINGP technical specifications, but not in the standard technical specifications for Westinghouse plants. Since Technical Specification Task Force (TSTF) Traveler TSTF-471 was written to modify standard technical specifications (TSs), it does not refer to this Required Action.
This action requires suspension of core alterations when one required core subcritical neutron flux monitor audible count rate circuit is inoperable. However, the basis for this limiting condition of operation states that audible count rate circuits serve to alert the operator in containment in the event of a dilution accident or improperly loaded fuel assembly, as noted in Section 3.1 of the amendment request. The amendment request also stated that considering an improperly loaded fuel assembly in discussion of the audible count rate circuit is not consistent with the rest of the PINGP TS 3.9.3 bases.
Request Describe the portions of PINGPs licensing basis that consider improper loading of a fuel assembly and explain why these basis support removal of Required Action C.2.
NSPM Response to RAI-1 NSPM reviewed the TS Bases and USAR and determined that improperly loading a fuel assembly in the reactor vessel is only addressed in the PINGP TS 3.9.3 Bases for the Limiting Condition of Operation and without reference to any safety analyses. The Page 1 of 3
L-PI-21-032 NSPM Enclosure USAR includes an improperly loaded fuel assembly analysis in the spent fuel pool, but this is not relevant to TS 3.9.3. In addition, none of the current Required Actions associated with TS 3.9.3 provide a tie to a misloaded fuel assembly in the reactor vessel within the TS Bases.
Furthermore, in 2016, the TS Task Force (TSTF) approved TSTF-555-T, Clarify the Nuclear Instrumentation Bases Regarding the Detection of an Improperly Loaded Fuel Assembly, to correct an error in the Standard TS Bases. Specifically, TSTF-555-T notes a Standard TS Bases statement that the source range neutron flux monitors can detect a fuel assembly misloaded into the reactor vessel is neither consistent with the licensing basis nor supported by operating experience or reactor physics. NSPM will be revising TS Bases to incorporate TSTF-555-T in accordance with TS 5.5.12, Technical Specifications (TS) Bases Control Program. A revision to the TS 3.9.3 Bases markups provided with Reference 1 is attached for information only.
2.2 RAI-2 Technical or Regulatory Issue In the current TSs, Required Action C.2 of LCO 3.9.3 requires that core alterations be suspended if one required core subcritical neutron flux monitor audible count rate circuit is inoperable. The current LAR proposes to remove this Required Action. Section TS 3.9.3, Required Actions A.1 and C.2 of the LAR, states that this Required Action has no effect on the initial conditions or mitigation of a boron dilution accident. However, as written, the proposed change would allow for positive reactivity additions when in Condition C. This contradicts the statement in section TS 3.9.1 of the LAR that suspending positive reactivity additions is the only action needed to mitigate a boron dilution event. It also appears to be inconsistent with TSTF-471, which explains that suspending core alterations provides no safety benefit if Required Actions that suspend core alterations also suspend movement of recently irradiated fuel. The proposed Required Actions in Condition C would not require suspension of movement of recently irradiated fuel.
Request Please clarify why a requirement to suspend positive reactivity additions or movement of recently irradiated fuel is not needed to replace the requirement to suspend core alterations in Condition C of LCO 3.9.3, and why this change would have no effect on the initial conditions or mitigation of a boron dilution accident in this condition.
NSPM Response to RAI-2 A requirement to suspend positive reactivity additions or movement of recently irradiated fuel is not needed to replace the requirement to suspend core alterations for an inoperable audio count rate circuit. The proposed change has no effect on the initial conditions or mitigation of boron dilution accident with the audible count rate circuit inoperable. As noted in Reference 1, movement of control rods or fuel do not affect the Page 2 of 3
L-PI-21-032 NSPM Enclosure initial conditions of a boron dilution accident as it is assumed that the control rods and fuel are in the most adverse conditions with a large safety margin (keff 0.95). Thus, the only Required Action needed for TS 3.9.3, Condition C, audible count rate circuit inoperable, is to isolate unborated water sources to preclude a dilution accident because the potential reactivity issues resulting from moving fuel are bounded by having the correct minimum refueling boron concentration. As part of the Startup and Operations Report, Westinghouse calculates a minimum refueling boron concentration.
The minimum refueling boron concentration is calculated to ensure that Keff will remain less than 0.95 with all rods out and any single fuel assembly temporarily stored in an arbitrary location in the reactor vessel during the fuel shuffle.
This does not contradict the need for a Required Actions for TS 3.9.1 to suspend positive reactivity additions. The difference between TS 3.9.1 and TS 3.9.3 is that, when in Limiting Condition for Operation (LCO) 3.9.1, boron concentration is not within limits specified in the Core Operating Limits Report (COLR) and positive reactivity additions need to be suspended to protect shutdown margin. The TS 3.9.3 Required Action C.1 to isolate unborated water sources precludes a boron dilution event and is sufficient by itself to protect shutdown margin, as long as LCO 3.9.1 is met, because having boron concentration within the limits specified in the COLR ensures shutdown margin is protected regardless of the configurations of fuel in the vessel.
As noted in response to RAI-1, the subcritical neutron flux monitors will not aid the detection of a misloaded fuel assembly and, as such, neither will the audible countrate circuit. So, with Keff less than 0.95 and refueling boron concentration within its analyzed limits, there is sufficient shutdown margin to permit fuel movement with an inoperable audible countrate circuit. Other positive reactivity additions (specifically, boron dilution) are precluded by Required Action C.1 to isolate unborated water sources.
3.0 REFERENCES
- 1. Letter (L-PI-21-007) from NSPM to the NRC, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes, dated April 19, 2021 (ADAMS Accession No. ML21109A385)
- 2. Email from the NRC to NSPM, Request for Additional Information RE:
Amendment request to adopt TSTF-471 and 517-T for Prairie Island, dated August 30, 2021 (ADAMS Accession No. ML21252A012)
Page 3 of 3
ENCLOSURE, ATTACHMENT PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 Response to Request for Additional Information License Amendment Request TSTF-471, "Eliminate Use of the Term CORE ALTERATIONS in ACTIONS and Notes" REVISED TECHNICAL SPECIFICATION 3.9.3 BASES PAGES (MARKUP)
FOR INFORMATION ONLY (4 Pages Follow)
Nuclear Instrumentation B 3.9.3 B 3.9 REFUELING OPERATIONS B 3.9.3 Nuclear Instrumentation BASES BACKGROUND Core subcritical neutron flux monitors are used during refueling operations to monitor the core reactivity condition. The installed core subcritical neutron flux monitors are part of the Nuclear Instrumentation System (NIS). These detectors (N-31, N-32, N-51, and N-52) are located external to the reactor vessel and detect neutrons leaking from the core.
The installed core subcritical neutron flux monitors are:
- a. BF3 detectors operating in the proportional region of the gas filled detector characteristic curve; or
- b. Fission chambers.
The detectors monitor the neutron flux in counts per second. The instrument range used for monitoring changes in subcritical multiplication typically covers six decades of neutron flux. The detectors provide continuous visual indication in the control room.
The installed BF3 neutron flux monitors provide an audible indication to alert operators in containment to a possible dilution accident. The NIS is designed in accordance with the criteria presented in Reference 1.
APPLICABLE Two OPERABLE core subcritical neutron flux monitors are required SAFETY to provide a signal to alert the operator to unexpected changes in ANALYSES core reactivity such as with a boron dilution accident (Ref. 2) or an improperly loaded fuel assembly.
The core subcritical neutron flux monitors satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).
Prairie Island Units 1 and 2 B 3.9.3-1 Revision 242
Nuclear Instrumentation B 3.9.3 BASES (continued)
LCO This LCO requires that two core subcritical neutron flux monitors, capable of monitoring subcritical neutron flux, be OPERABLE to ensure that redundant monitoring capability is available to detect changes in core reactivity. Neutron detectors N-31, N-32, N-51 and N-52 may be used to satisfy this LCO requirement.
This LCO also requires that one audible countrate circuit, associated with either N-31 or N-32, be OPERABLE to ensure that audible indication is available to alert the operator in containment in the event of a dilution accident or improperly loaded fuel assembly.
APPLICABILITY In MODE 6, the core subcritical neutron flux monitors must be OPERABLE to determine changes in core reactivity. There are no other direct means available to check core reactivity levels. In MODES 2, 3, 4, and 5, the installed detectors and circuitry are also required to be OPERABLE by LCO 3.3.1, Reactor Trip System (RTS) Instrumentation.
positive reactivity additions and movement of fuel, sources, and reactivity control ACTIONS A1 and A.2 components within the reactor vessel With only one required core subcritical neutron flux monitor OPERABLE, redundancy has been lost. Since these instruments are the only direct means of monitoring core reactivity conditions, CORE ALTERATIONS and introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately.
Suspending the introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.
Prairie Island Units 1 and 2 B 3.9.3-2 Revision 242
Nuclear Instrumentation B 3.9.3 BASES ACTIONS A.1 and A.2 (continued)
Introduction of temperature changes, including temperature increases when operating with a positive moderator temperature coefficient (MTC), must also be evaluated to not result in reducing SDM below the required value. Performance of Required Action A.1 shall not preclude completion of movement of a component to a safe position.
Insert A B.1 With no required core subcritical neutron flux monitor OPERABLE, action to restore a monitor to OPERABLE status shall be initiated immediately. Once initiated, action shall be continued until a required core subcritical neutron flux monitor is restored to OPERABLE status.
B.2 With no required core subcritical neutron flux monitor OPERABLE, there are no direct means of detecting changes in core reactivity.
However, since CORE ALTERATIONS and positive reactivity additions that could lead to reducing SDM below the required value are not to be made, the core reactivity condition is stabilized until the core subcritical neutron flux monitors are OPERABLE. This stabilized condition is determined by performing SR 3.9.1.1 to ensure that the required boron concentration exists.
The Completion Time of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient to obtain and analyze a reactor coolant sample for boron concentration and ensures that unplanned changes in boron concentration would be identified. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is reasonable, considering the low probability of a change in core reactivity during this time period.
Prairie Island Units 1 and 2 B 3.9.3-3 Revision 242
Insert A Suspending the movement of fuel, sources, and reactivity control components ensures that positive reactivity is not inadvertently added to the reactor core while the source range neutron flux monitor is inoperable. Required Action A.2 is modified by a Note that states that fuel assemblies, sources, and reactivity control components may be moved if necessary to facilitate repair or replacement of the inoperable source range neutron flux monitor. It may be necessary to move these items away from the locations in the core close to the source range neutron flux monitor to minimize personnel radiation dose during troubleshooting or repair. The Note also permits completion of movement of a component to a safe position, should the source range neutron flux monitor be discovered inoperable during component movement.