MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5792020-08-27027 August 2020 ES-301-6 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5762020-08-27027 August 2020 ES-301-4 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5642020-08-27027 August 2020 ES-401-4 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination 2024-01-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5642020-08-27027 August 2020 ES-401-4 ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination IR 05000282/20183012018-11-30030 November 2018 Errata - Prairie Island Nuclear Generating Plant, Units 1 and 2 - NRC Initial License Examination Report 05000282/2018301 and 05000306/2018301 (DRS-R.Baker) ML22179A2542018-10-16016 October 2018 2018 Prairie Island Ile Outline Review Comments-Final ML22179A2392018-10-16016 October 2018 2018 Prairie Island Ile ES-201-1 Exam Prep Checklist 2024-01-19
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_____________________ Date of Examination: AUGUST 2020 Examination Level: RO Operating Test Number: PI-ILT-NRC-20 Administrative Type Describe activity to be performed K/A JPM #
Topic (see Note) Code*
TURBINE START UP AND LOAD TIME (ADMIN-78) 2.1.25 Conduct ADMIN-78 D, P, R This is a bank JPM where the examinee interprets a (3.9/4.2) of Operations graph, performs calculation, and determines startup and loading rates of the main turbine.
DETERMINE BLENDED FLOW CONCENTRATION 2.1.25 Conduct ADMIN-50 D, R This is a bank JPM where the examinee determines the (3.9/4.2) of Operations boric acid flow setting for the Boric Acid Flow Control Valve.
SP1001B FOR RWST LEVEL Equipment 2.2.40 ADMIN-113 N, R Control This is a new JPM that requires the RO to determine if (4.7/3.4)
RWST levels meet the T.S. minimum.
REMOVE RADIATION MONITOR FROM SERVICE 2.3.5 Radiation Control D, R This is a bank JPM where the examinee removes 1R-11, (2.9/2.9) ADMIN-16 Containment Air Particulate Radiation Monitor, from service.
Emergency N/A N/A Procedures/Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_____________________ Date of Examination: AUGUST 2020 Examination Level: SRO-I Operating Test Number: PI-ILT-NRC-20 Administrative Type Describe activity to be performed K/A JPM #
Topic (see Note) Code*
VERIFY HEAVY LOAD LIFT REQUIREMENTS ARE NOT MET 2.1.23 Conduct ADMIN-118 N, R This is a new JPM where the examinee determines TS (4.4/4.3) of Operations and heavy load lift definitions are met but the requirements to proceed are not met.
DETERMINE CONTAINMENT CSFST COLOR WITH ERCS OOS - ORANGE 2.1.7 Conduct ADMIN-119 N, R This is a new JPM where the examinee determines (4.7/4.4) of Operations Critical Safety Function Status Tree color based on containment pressure and running spray pumps.
PERFORM SHUTDOWN SAFETY ASSESSMENT FOR 2.2.18 Equipment 480V ADMIN-110 D, R (2.6/3.9)
Control This is a bank JPM where the examinee determines SSA color condition for 480v buses.
AUTHORIZE WASTE GAS RELEASE 2.3.6 This is a bank JPM where the examinee determines a Radiation Control P, R (3.8/4.3) ADMIN-22 gas release cannot be approved due to unfavorable wind conditions.
DETERMINE PINGP 577 ERRORS ON INITIAL 2.4.40 Emergency CLASSIFICATION ADMIN-112 D, R (2.7/4.5)
Procedures/Plan This is a bank JPM where the examinee performs the peer check on a PINGP 577 and determines errors exist.
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_____________________ Date of Examination: AUGUST 2020_
Exam Level: RO Operating Test No.: PI-ILT-NRC-20 _
Control Room Systems:
- 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title JPM # K/A Type Code* Safety Function 004 A4.12
- a. MALF OF AUTO MAKEUP DURING BORATION VC-29SF A,P,S 1 3.8/3.2 004 A4.08
- b. PERIODIC ROTATION OF CHARGING PUMPS RC-26S N,S 2 3.8/3.4
- c. ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO RC-25SF 007 A4.10 A,N,S 3 PRZR PORV LEAKAGE 3.6/3.8 075 A4.01
- d. SWS/LOSS OF COOLING WATER HEADER PRESSURE CL-11SF A,D,S 4S 3.2*/3.2*
022 A4.01
- e. ALTERNATE CFCUs w/ CFCU HI TEMP ZC-1SF A,D,EN,P,S 5 3.6/3.6 064 A3.06
- f. MANUAL START OF D1 FROM THE CR EG-4S D,S 6 3.3/3.4 015 A1.01
- g. NIS / PR DAILY CALIBRATION - SP 1005 NI-5S D,S 7 3.5/3.8 2.1.20
- h. SHUTDOWN SFP NORMAL VENTILATION SF-3S N,S 8 4.6/4.6 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) 028 AA1.03
- i. RCP SEAL ISOLATION AFTER LOSS OF ALL AC RC-8 D,E,L,P,R 4P 2.9/2.9 2.1.23
- j. LOCALLY CLOSE 1 TURB LOOP A CLG WTR HDR MV CL-18 E,N 4S 4.4/4.3 068 AA1.21
- k. RESTORE 121 & 123 INSTR AIR COMPRESSORS F5-19 E,N 8 4.1/3.9
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_____________________ Date of Examination: AUGUST 2020_
Exam Level: SRO-I Operating Test No.: PI-ILT-NRC-20 _
Control Room Systems:
- 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title JPM # K/A Type Code* Safety Function 004 A4.12
- a. MALF OF AUTO MAKEUP DURING BORATION VC-29SF A,P,S 1 3.8/3.2 004 A4.08
- b. PERIODIC ROTATION OF CHARGING PUMPS RC-26S N,S 2 3.8/3.4
- c. ENERGIZE PRZR BACK-UP HEATERS AND RESPOND TO RC-25SF 007 A4.10 A,N,S 3 PRZR PORV LEAKAGE 3.6/3.8 075 A4.01
- d. SWS/LOSS OF COOLING WATER HEADER PRESSURE CL-11SF A,D,S 4S 3.2*/3.2*
022 A4.01
- e. ALTERNATE CFCUs w/ CFCU HI TEMP ZC-1SF A,D,EN,P,S 5 3.6/3.6 064 A3.06
- f. MANUAL START OF D1 FROM THE CR EG-4S D,S 6 3.3/3.4
- g. N/A N/A N/A N/A N/A 2.1.20
- h. SHUTDOWN SFP NORMAL VENTILATION SF-3S N,S 8 4.6/4.6 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) 028 AA1.03
- i. RCP SEAL ISOLATION AFTER LOSS OF ALL AC RC-8 D,E,L,P,R 4P 2.9/2.9 2.1.23
- j. LOCALLY CLOSE 1 TURB LOOP A CLG WTR HDR MV CL-18 E,N 4S 4.4/4.3 068 AA1.21
- k. RESTORE 121 & 123 INSTR AIR COMPRESSORS F5-19 E,N 8 4.1/3.9
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator