ISFSI - Operator Licensing Examination Data for Calendar Years 2018 - 2021
ML16202A500
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/20/2016
From: Northard S
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-PI-16-064, RIS-2016-09
Download: ML16202A500 (3)


Text

1717 Wakonade Drive Welch, MN 55089 (l Xcel Energy*

RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com JUL 2 D 2016 L-PI-16-064 RIS 2016-09 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 NRC Regulatory Issue Summary 2016 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations", dated June 16, 2016, Northern States Power Company, a Minnesota corporation, hereby submits the operator licensing examination data for calendar years 2018 through 2021 for the Prairie Island Nuclear Generating Plant. Enclosed is the corresponding NRC Form 536 for the Station which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Summary of Commitments

~w commitments or changes to any existing commitments.

Scott Northard Acting Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC

Document Control Desk Page 2 ENCLOSURE Operator Licensing Examination Data for Prairie Island Nuclear Generating Plant, Units 1 and 2 1 page follow

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~

  • .p****~~.,}'0 Estimated burden per response to comply with this volunlal)' information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgels and resources ror operator examinations. Send lJ li t..

s OPERATOR LICENSING commenls regarding burden estimale to the FOIA, Privacy, and Information CoDections Branch (T-5 F53), U.S. Nuclear Regulatol)' Commission, Washington, DC20555-000f, or by e-mail to

~~ t. EXAMINATION DATA lnrocollects.Resource@nrc.gov, and to the Desk Officer, Office or Information and Regulatol)' Affairs,

"~..~ ~o'I NEOB-10202, (3150-0131), Office or Management and Budge~ Washington, DC 20503. If a means

        • * . used to Impose an Information collection does not display a currenlly valid OMS control number, the NRC may not conduct or sponsor, and a person Is not requ~ed to respond to, the Information collecUon.

FACILITY NRC REGION Prairie Island Nuclear Generating Plant Ill i

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2021 PROPOSED NUMBER

- CY2019 CY2020 NUMBER OF REACTOR OPERATORS 6 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/17/2018 06/08/2020 ALTERNATE DATE 09/24/2018 06/15/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY

-2017 SEPTEMBER MARCH CY 2018 SEPTEMBER ESTIMATED NUMBER OF 0 0 0 11 CANDIDATES NRC FORM 536 (05-2016)