ML18102B034

From kanterella
Revision as of 14:54, 5 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2
ML18102B034
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/25/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B024 List:
References
NUDOCS 9705050121
Download: ML18102B034 (2)


Text

( I \

  • ECCS SUBSYSTEMS -T 350°F LIMITING.

CONDITION FOR OPERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each subsystem comprised of the following injection systems: a. One OPERABLE centrifugal charging pump and associated flow path capable of taking suction from the refueling water storage tank and transferring suction to the residual heat removal pump discharge piping and; 1. Discharging into each Reactor Coolant System (RCS) cold leg. b. One OPERABLE safety injection pump and associated flow path capable of taking suction from the refueling water storage tank and transferring suction to the residual heat removal pump discharge piping and; 1. Discharging into each RCS cold leg, and; upon manual initiation, 2. Discharging into its two associated RCS hot

c. One OPERABLE residual heat removal pump and associated residual heat removal heat exchanger and flow path capable of taking suction from the refueling water storage tank on a safety ;njection signal and transferring suction to the containment sump during the recirculation phase of operation and;
  • 1. Discharging into each RCS cold leg/ aREil wpgA IHA'.la.L

!v iRiaiaUgA, APPLICABILITY:

MODES 1, 2 and 3. ACTION: a. With one EC.CS subsystem i.nopet:able,.

restore the inoperable.

to OPERA.BL!*

status* within* i2* hours* or-be* in HOT'° SmrrDOWN within* ::.:-:e next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. b. In the event the ECCS is actuated and injects water into the Coolant System, a Special Report shall be prepared and submitted the Col!IDission pursuant to Specification 6.9.2 within 90 days describing the circumstances of actuation and the total accumulated actuation cycles to. data. c. With both ECCS subsystems inoperable for surveillance testing, restore at least one subsystem to OPERABLE status within l be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at least COLD within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

  • SALEM -UNIT 1 9705050121 970425 PDR ADOCK 05000272 P PDR 3/4 5-3 Amendment No. 94 ...
  • r EMERGENCY C. COOLING SYSTEMS
  • ECCS SUBSYSTEMS -T ? 350°F LIMITING CONDITION FOR OPERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each subsystem comprised of the following injection systems: a. One OPERABLE centrifugal charging pump and associated flow path capable of taking suction from the refueling water storage tank and transferring suction to the residual heat removal pump discharge.

piping and; b. 1. Discharging into each Reactor Coolant System (RCS) cold leg. One OPERABLE safety injection pump and associated flow path of taking suction from the refueling water storage tank and transferring.

suction to the residual heat removal pwnp discharge piping and; 1. Discharging into each RCS leg, and; upon manual initiation, . I I 1 I I 2. Discharging into its two RCS hot legs. l c. One OPERABLE residual heat removal pump and associated residual heat I removal heat exchanger and flow path capable of taking suction from I the refueling water storage tank on a safety signal and transferring suction to the containment sump during the 1 recirculation phase of operation and; I 1. Discharging into each RCS cold leg,. afta: ttpePl ifl&R'tlal fl iP1HiaHen1 Ii! .. APPLICABILITY:

MODES 1, 2 and 3. ACTION: a. With one ECCS subsystem inoperable, restore the inoperable to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHU'IJ)QWN within nett 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. b. In the event the ECCS is actuated and injects water into the Coolant System, a Special Report shall be prepared and submitted the Commission pursuant to Specification 6.9.2 within 90 days the circumstances of the actuation and the total accumulated actuation cycles to date. The current value of the usage f actoc for each affected safety injection nozzle shall be provided in this Special Report whenever its value exceeds O.iO. SALEM -UNIT 2 3/4 5-3 '-°*Amendment No. "70