ML16201A223

From kanterella
Revision as of 03:25, 27 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML16201A223
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 07/15/2016
From: Barbee A T
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of New Reactors, Office of Nuclear Reactor Regulation
References
RIS 2016-09
Download: ML16201A223 (3)


Text

  • .' Andy T. Barbee Director, Nuclear Training 803.345.4034 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULA TORY ISSUE

SUMMARY

, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS July 15, 2016 Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3. As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).

Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028.

For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Byrne J.B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney G. J. McCoy E. F. Guthrie S. A Williams N. E. Constance P. A Mathena NRC Resident Inspector K. M. Sutton NSRC RTS (CR-16-03121)

File (814. 04, RR 1150) PRSF (RC-16-0114)

DCRM V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F (803) 941-9776 f.' NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This >'\ OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send comments burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to t; " EXAMINATION DATA ,. . lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, \, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ----ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

-B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------..

  • NUMBER OF REACTOR 3 3 3 0 OPERATORS , NUMBER OF SENIOR REACTOR 3 3 3 0 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR' 3 3 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED c PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019.

10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 --* -NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016) 4 v
  • NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) ... ",. Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send ti comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 :; ll F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, ..

NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means '*"'**°'.

used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II ' A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER . CY2018 CY2019 CY2020 CY2021 --------NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 24 24 24 24 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)